STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
CLARE COUNTY
Clare Public Schools

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

11/07/2023

1

The Collaborative Inc 

Failed 

740/1,332

$49,850,000

Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites.
 

05/02/2023

1

Tower Pinkster 

Failed 

751/1,062

$66,520,000

Erecting, furnishing, and equipping a new high school addition; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites.
 

06/11/2001

1

Design Forum 

Passed 

879/832

$11,650,000

Erecting, furnishing and equipping additions to the Clare primary and high school buildings; partially remodeling, refurnishing and re-equipping school buildings, including acquiring and installing educational technology improvements; and developing and improving athletic facilities, playgrounds and sites. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, is not more than twenty-four (24) years nine (9) months. The estimated millage that will be levied for the proposed bonds in the year 2001 is 5.25 mills ($5.25 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire all proposed bonded debt is 3.91 mills ($3.91 per $1,000 of taxable valuation).
 

09/16/2000

1

Design Forum 

Failed 

843/856

$18,520,000

Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, outdoor physical education fields, facilities and sites. It is expected that the bonds will be outstanding for a period of not more than 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2000 is 7 mills ($7.00 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.44 mills ($6.44 per $1,000 of taxable valuation).
 

09/16/2000

2

Design Forum 

Failed 

776/889

$3,215,000

Erecting, furnishing and equipping an auditorium addition to the proposed Clare High School addition and developing and improving the site. It is expected that the bonds will be outstanding for a period of not more han 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2000 is .75 mill ($0.75 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.25 mill ($1.25 per $1,000 of taxable valuation). If Proposals I and II are approved, the total millage that will be levied for the proposed combined bond issues is not anticipated to exceed 7.75 mills ($7.75 per $1,000 of taxable valuation) under present law.
 

03/04/2000

1

Design Forum 

Failed 

717/735

$18,025,000

Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, outdoor physical education fields, facilities and sites.
 

03/04/2000

2

Design Forum 

Failed 

637/788

$3,135,000

Erecting, furnishing and equipping an auditorium addition to the Clare High School and developing and improving the site.
 

Michigan.gov Home |  Contact Treasury  |  State Web Sites  |  FAQ  |  Sitemap
Privacy Policy  |  Link Policy  |  Accessibility Policy  |  Security Policy
Copyright © 2001-2010 State of Michigan