STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
CLARE COUNTY
School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
Clare Public Schools | 11/07/2023 | 1 | The Collaborative Inc | Failed | 740/1,332 | $49,850,000 | |
| Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites. | |||||||
Clare Public Schools | 05/02/2023 | 1 | Tower Pinkster | Failed | 751/1,062 | $66,520,000 | |
| Erecting, furnishing, and equipping a new high school addition; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites. | |||||||
Clare Public Schools | 06/11/2001 | 1 | Design Forum | Passed | 879/832 | $11,650,000 | |
| Erecting, furnishing and equipping additions to the Clare primary and high school buildings; partially remodeling, refurnishing and re-equipping school buildings, including acquiring and installing educational technology improvements; and developing and improving athletic facilities, playgrounds and sites. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, is not more than twenty-four (24) years nine (9) months. The estimated millage that will be levied for the proposed bonds in the year 2001 is 5.25 mills ($5.25 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire all proposed bonded debt is 3.91 mills ($3.91 per $1,000 of taxable valuation). | |||||||
Clare Public Schools | 09/16/2000 | 1 | Design Forum | Failed | 843/856 | $18,520,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, outdoor physical education fields, facilities and sites. It is expected that the bonds will be outstanding for a period of not more than 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2000 is 7 mills ($7.00 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.44 mills ($6.44 per $1,000 of taxable valuation). | |||||||
Clare Public Schools | 09/16/2000 | 2 | Design Forum | Failed | 776/889 | $3,215,000 | |
| Erecting, furnishing and equipping an auditorium addition to the proposed Clare High School addition and developing and improving the site. It is expected that the bonds will be outstanding for a period of not more han 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2000 is .75 mill ($0.75 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.25 mill ($1.25 per $1,000 of taxable valuation). If Proposals I and II are approved, the total millage that will be levied for the proposed combined bond issues is not anticipated to exceed 7.75 mills ($7.75 per $1,000 of taxable valuation) under present law. | |||||||
Clare Public Schools | 03/04/2000 | 1 | Design Forum | Failed | 717/735 | $18,025,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, outdoor physical education fields, facilities and sites. | |||||||
Clare Public Schools | 03/04/2000 | 2 | Design Forum | Failed | 637/788 | $3,135,000 | |
| Erecting, furnishing and equipping an auditorium addition to the Clare High School and developing and improving the site. | |||||||
Farwell Area Schools | 11/05/2019 | 1 | Integrated Designs | Passed | 1,080/872 | $20,100,000 | |
| Erecting, furnishing, and equipping an addition to the elementary school; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; developing, improving, and equipping athletic facilities, playgrounds, and sites. | |||||||
Farwell Area Schools | 05/07/2019 | 1 | Integrated Designs | Failed | 753/787 | $24,500,000 | |
| Erecting, furnishing, and equipping an addition to the elementary school; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; developing, improving, equipping, and erecting athletic facilities, playgrounds, and sites. | |||||||
Farwell Area Schools | 04/17/2000 | 1 | GMB | Failed | 645/1,266 | $19,985,000 | |
| Erecting, furnishing and equipping a new High School to include an auditorium; partially remodeling existing school buildings; acquiring and installing educational technology; and developing and improving sites, athletic fields and outdoor physical education facilities. | |||||||
Farwell Area Schools | 09/28/1998 | 1 | GMB | Failed | 713/1,049 | $16,985,000 | |
| Erecting, furnishing and equipping a new High School; partially remodeling existing school buildings; acquiring and installing educational technology; and developing and improving sites, athletic fields and outdoor physical education facilities. | |||||||
Harrison Community Schools | 05/02/2017 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 1,007/696 | $26,700,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; erecting a team facility building on the athletic field; and preparing, developing and improving playgrounds, athletic facilities and sites. | |||||||
Michigan.gov Home
| Contact Treasury | State Web
Sites | FAQ | Sitemap
Privacy Policy | Link Policy | Accessibility
Policy | Security
Policy
Copyright © 2001-2010 State of Michigan