STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
GENESEE COUNTY
School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
Atherton Community Schools | 11/04/2025 | 1 | French | Passed | 465/426 | $13,400,000 | |
| Remodeling and equipping or reequipping school buildings and the restroom addition; furnishing or refurnishing remodeled school buildings; erecting an addition to the stadium area restrooms; preparing, developing, or improving sites for school buildings, including the stadium area restroom addition, football field, track and field, and other athletic facilities. | |||||||
Atherton Community Schools | 08/04/2020 | 1 |
| Passed | 979/507 | $11,400,000 | |
| Erecting, remodeling, and equipping or reequipping school buildings or other facilities, or parts of or additions to those facilities, including security upgrades and upgrades for student safety; acquiring, installing, and equipping and reequipping school buildings for instructional technology and infrastructure upgrades; furnishing and refurnishing remodeled school buildings; preparing, developing, and improving sites, or parts of or additions to sites, for school buildings, including structures, playgrounds, or other facilities. | |||||||
Atherton Community Schools | 02/23/2010 | 1 | SHW Group, LLP | Failed | 271/435 | $14,070,000 | |
| Improving and remodeling the current Atherton High School and the Atherton Middle School and remodeling and adding classrooms at the Van Y Elementary School, which would include equipping for technology and technology infrastructure, purchasing busses, and furnishing and improving the existing sites, including construction and renovation of athletic facilities and playground equipment thereon. | |||||||
Atherton Community Schools | 09/25/2001 | 1 | THA | Passed | 469/324 | $9,125,000 | |
| Remodel, furnish, equip, develop and improve the site for Atherton High School; remodel, and develop and improve the sites for Van Y Elementary School and Atherton Middle School; and acquire, install, equip and re-equip existing school buildings for technology. It is estimated that 1.99 mills will be levied in 2001 for this issue. The Bonds will be repaid over a period not to exceed 20 years, with an estimated simple average annual levy of property taxes of 3.21 mills ($3.21 per 1,000 of taxable value). | |||||||
Atherton Community Schools | 06/14/1999 | 1 | THA | Failed | 383/501 | $24,160,000 | |
| Defraying the cost to construct a new elementary school building including site development, playgrounds, furnishings and equipment, and computers and related technology; erect additions to Atherton High School; remodel, equip and re-equip, furnish and refurnish Atherton High School and Atherton Middle School; improve and develop the site of Atherton High School and Atherton Middle School, including athletic fields and structures; and acquire, install, equip and re-equip school buildings for computers and related technology. | |||||||
Atherton Community Schools | 09/29/1997 | 1 | THA | Failed | 433/727 | $22,000,000 | |
| null | |||||||
Beecher Community School District | 02/27/2007 | 1 | THA | Passed | 211/134 | $3,270,000 | |
| Remodeling school facilities; purchasing school buses; developing a playground; and developing and improving sites. | |||||||
Bendle Public Schools | 11/08/2005 | 1 | Integrated Designs | Passed | 625/503 | $15,500,000 | |
| erecting, equipping and furnishing a new high school and related athletic facilities, and acquiring, preparing, developing and improving the site therefore; acquiring, installing and equipping the new high school building for, technology improvements; demolishing T.N. Lamb Middle School; remodeling, reequipping and refurnishing the existing high school building to provide for a middle school building; and remodeling and reequipping South Bendle Elementary School and West Bendle Elementary School. The maximum number of years the bonds may be outstanding, exclusive of refunding, is 30 years; the estimated millage that will be levied to pay the proposed bonds in the first year that the levy is authorized is 7.10 mills (which is equal to $7.10 per $1,000 of taxable value of real and tangible personal property in the School District); and the estimated simple average annual millage that will be required to retire the bonds is 7.09 mills (which is equal to $7.09 per $1,000 of taxable value of real and tangible personal property in the School District). | |||||||
Bentley Community School District | 11/07/2023 | 1 | Progressive AE | Passed | 682/554 | $8,320,000 | |
| Remodeling and equipping or reequipping school buildings, including structures, or other facilities, or parts of those facilities; and preparing, developing, or improving sites, or parts of sites, for school buildings, including structures, athletic fields, playgrounds, repaving parking lots, adding a drop off lane, or other facilities. | |||||||
Bentley Community School District | 05/05/2020 | 1 | Progressive AE | Passed | 732/433 | $2,240,000 | |
| Remodeling, or equipping or reequipping school buildings, including structures, athletic fields, playgrounds, or other facilities, or parts of or additions to those facilities, including security upgrades; furnishing or refurnishing remodeled school buildings; preparing, developing, or improving sites, or parts of or additions to sites, for school buildings, including structures, athletic fields, playgrounds, or other facilities, including track upgrades; acquiring, installing, or equipping or reequipping school buildings for technology. | |||||||
Bentley Community School District | 08/05/2014 | 1 | SHW Group, LLP | Passed | 668/585 | $5,285,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing all existing district buildings and existing sites, acquiring and installing security and phone systems at existing district school buildings, and constructing improvements and renovations to district athletic fields and associated facilities, including track and field, bleachers, restrooms, concessions, ticket booth, press box and storage building. | |||||||
Bentley Community School District | 02/25/2014 | 1 | SHW Group, LLP | Failed | 392/408 | $5,285,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing all existing district buildings and existing sites, acquiring and installing security and phone systems at existing district school buildings, and constructing improvements and renovations at Bentley Athletic Stadium. | |||||||
Bentley Community School District | 05/02/2006 | 1 | None | Passed | 305/203 | $570,000 | |
| acquiring school buses | |||||||
Bentley Community School District | 06/14/2004 | 1 | CHMP Inc. | Passed | 325/161 | $4,600,000 | |
| Remodeling, furnishing and equipping school buildings; acquiring, installing and equipping technology for school buildings; developing and improving sites; and erecting a multi-purpose room addition to Barhitte Elementary School? The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2004, under current law, is 2 mills ($2.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.77 mills ($1.77 on each $1,000 of taxable valuation). | |||||||
Bentley Community School District | 09/27/1999 | 1 | Fanning & Howey | Failed | 646/783 | $7,895,000 | |
| Erecting, furnishing and equipping an addition to, remodeling, refurnishing and re-equipping the Barhitte Elementary School; acquiring and installing educational technology improvements; and developing and improving the playground and site. | |||||||
Bentley Community School District | 09/27/1999 | 2 | Fanning & Howey | Failed | 663/745 | $2,770,000 | |
| Erecting, furnishing and equipping an addition to and remodeling and re-equipping the Bentley High School; acquiring and installing educational technology system improvements; and developing and improving the site. | |||||||
Bentley Community School District | 09/27/1999 | 3 | Fanning & Howey | Failed | 642/787 | $1,275,000 | |
| Remodeling and re-equipping the Bentley Middle School, acquiring and installing educational technology system improvements; and developing and improving the site. | |||||||
Bentley Community School District | 09/27/1999 | 4 | Fanning & Howey | Failed | 555/865 | $1,285,000 | |
| Erecting, furnishing and equipping an auxiliary gymnasium at the high school; and developing and improving atheltic fields, facilities and the site. | |||||||
Bentley Community School District | 09/29/1997 | 1 | Fanning & Howey | Failed | 488/740 | $10,755,000 | |
| null | |||||||
Carman-Ainsworth Community Schools | 11/05/2024 | 1 | THA | Passed | 8,539/4,428 | $65,200,000 | |
| Erecting, remodeling, and equipping or reequipping school buildings, including structures, athletic fields, playgrounds, or other facilities, or parts of or additions to those facilities; furnishing or refurnishing remodeled school buildings; preparing, developing, or improving sites, or parts of or additions to sites, for school buildings, including structures, athletic fields, playgrounds, or other facilities; purchasing school buses; and acquiring, installing, or equipping or reequipping school buildings for technology. | |||||||
Clio Area School District | 05/07/2024 | 1 | Integrated Design Solutions | Passed | 1,431/1,414 | $8,700,000 | |
| Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including, among other improvements, the creation of a secure entryway at the Early Elementary School and renovations to the auditorium at the High School. | |||||||
Clio Area School District | 05/05/2020 | 1 | Integrated Design Solutions | Passed | 2,664/2,489 | $40,600,000 | |
| Erecting, furnishing, and equipping additions to Garner Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; and erecting, equipping, preparing, developing, and improving playgrounds, athletic fields and facilities, and sites. | |||||||
Davison Community Schools | 03/10/2020 | 1 | Kingscott | Passed | 4,918/4,566 | $71,390,000 | |
| Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting a new bus storage building; acquiring and installing instructional technology in school buildings; erecting, equipping, preparing, developing, and improving playgrounds, athletic fields and facilities, and sites. | |||||||
Davison Community Schools | 02/26/2013 | 1 | Diekema Hamann Architecture | Passed | 1,534/1,190 | $11,960,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping the Central Elementary School; acquiring and installing educational technology equipment together with related infrastructure improvements; and developing and improving the playground and site. | |||||||
Davison Community Schools | 09/16/1996 | 1 | THA | Passed | 3,126/2,504 | $12,625,000 | |
| null | |||||||
Davison Community Schools | 09/16/1996 | 3 | THA | Passed | 3,274/2,386 | $1,230,000 | |
| null | |||||||
Fenton Area Public Schools | 11/07/2023 | 1 | Kingscott | Passed | 2,522/1,535 | $122,550,000 | |
| Erecting additions to, remodeling, including security improvements and air conditioning and ventilation improvements to, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting, furnishing and equipping a new multipurpose athletic building and school support buildings; and equipping, developing and improving playgrounds, athletic fields and facilities, sidewalks, driveways, parking areas and sites. | |||||||
Fenton Area Public Schools | 05/06/2014 | 1 | Gazall, Lewis & Assoc. Architects, Inc. | Passed | 1,555/950 | $11,000,000 | |
| Remodeling, installing security measures for, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses and band equipment; and developing and improving athletic fields and facilities, parking areas and sites. | |||||||
Fenton Area Public Schools | 11/06/2012 | 1 | Gazall, Lewis, and Assoc Architects, Inc. | Failed | 1,385/1,672 | $8,400,000 | |
| Partially remodeling, refurnishing and re-equipping school district buildings including acquiring and installing educational technology improvements and related infrastructure; and purchasing and equipping school buses. | |||||||
Fenton Area Public Schools | 05/08/2012 | 1 | Gazall, Lewis, and Assoc Architects, Inc. | Failed | 72/115 | $9,600,000 | |
| Partially remodeling, refurnishing and re-equipping school district buildings including acquiring and installing educational technology improvements and related infrastructure; purchasing and equipping school buses, and developing and improving sites. | |||||||
Fenton Area Public Schools | 05/02/2006 | 1 | Beta Design | Passed | 1,655/1,053 | $24,520,000 | |
| erecting, furnishing and equipping additions to the high school; remodeling, refurnishing and re-equipping school district building; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving playgrounds, athletic fields and facilites and sites? | |||||||
Fenton Area Public Schools | 05/02/2006 | 2 | Beta Design | Failed | 1,324/1,377 | $7,575,000 | |
| erecting, furnishing and equipping and expanded pool and gymnasium addition to the high school including a community pool and elevated indoor track together with incidental remodeling and site improvements. | |||||||
Fenton Area Public Schools | 09/21/1998 | 1 | Giffels, etal | Passed | 1,925/1,410 | $41,575,000 | |
| Erecting, furnishing and equipping a new middle school; erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school buildings and facilities; acquiring and installing educational technology system improvements; and acquiring school buses and developing and improving playgrounds, outdoor physical education fields, playfields and sites. | |||||||
Fenton Area Public Schools | 09/17/1996 | 1 | Giffels, etal | Failed | 1,456/1,815 | $41,885,000 | |
| null | |||||||
Flint City School District | 08/08/2000 | 1 |
| Failed | 6,293/10,600 | $175,000,000 | |
| Erecting, equipping and furnishing two new elementary school buildings and playgrounds; remodeling, equipping and reequipping existing school buildings; furnishing and refurnishing remodeled school buildings; equipping and reequipping school buildings for technology; and preparing, developing and improving existing school building sites and playgrounds. The maximum number of years the bonds may be outstanding, exclusive of refunding, is 25 years; the estimated millage that will be levied to pay the bonds in the first year that the levy is authorized is 5.0 mills (which is equal to $5.00 per $1,000 of taxable value of real and tangible personal property in the school district); the estimated millage that will be levied to pay the bonds in the second year that the levy is authorized and in each year thereafter is 8.00 mills; and the estimated simple average annual millage that will be required to retire the bonds is 7.83 mills. | |||||||
Flushing Community Schools | 05/07/2024 | 1 | Kingscott | Passed | 3,448/1,741 | $23,550,000 | |
| • Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic fields, playgrounds and other facilities; • Acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; • Erecting facilities and structures at the High School athletic fields; and • Preparing, developing and improving sites at school buildings, athletic fields, playgrounds and other facilities? | |||||||
Flushing Community Schools | 11/07/2017 | 1 | Kingscott | Passed | 2,820/2,221 | $17,800,000 | |
| Erecting, equipping and furnishing a gymnasium addition to the High School facility; remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic fields and other facilities to enhance safety and security and for other purposes; erecting a team room,restrooms, concessions, storage, lighting and sound facilities at the athletic fields; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings, athletic fields and other facilities. | |||||||
Flushing Community Schools | 05/03/2016 | 1 | Kingscott | Failed | 1,404/1,741 | $20,000,000 | |
| Erecting, equipping and furnishing additions to the High School facility which will include a community education center, athletic fieldhouse and art room; remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic fields and other facilities to enhance safety and security and for other purposes; erecting a team room, restrooms and concession facility, storage facility and lighting and sound facility at the athletic fields; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings, athletic fields and other facilities. | |||||||
Flushing Community Schools | 06/09/2003 | 1 | Kingscott | Passed | 2,904/1,477 | $25,325,000 | |
| Erecting, furnishing and equipping a new 7 and 8 grade building; acquiring and installing education technology; partially remodeling, refurnishing and re-equipping the existing Junior High School in part for early childhood purposes; developing and equipping outdoor athletic fields, playgrounds and sites. The following is for information purposes only: The estimated millage that will be levied for the proposed bonds in 2003 is 2.36 mills ($2.36 on each $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.88 mills ($1.88 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. | |||||||
Genesee School District | 12/13/1999 | 1 | CHMP Inc. | Passed | 351/103 | $6,500,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping school buildings and facilities, erecting a bus shelter and developing and improving school sites, playgrounds and athletic fields; and acquiring and installing educational technology improvements. | |||||||
Goodrich Area Schools | 11/04/2025 | 1 | Integrated Design Solutions | Passed | 1,535/1,317 | $64,000,000 | |
| Erecting, furnishing, and equipping additions to Goodrich High School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving, erecting, and equipping athletic fields and facilities, structures, playgrounds, and sites. | |||||||
Goodrich Area Schools | 08/04/2020 | 1 | Integrated Design Solutions | Passed | 1,748/1,638 | $20,930,000 | |
| Erecting, furnishing, and equipping an addition to Oaktree Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings for safety, security, and other purposes; acquiring and installing instructional technology in school buildings; and preparing, developing, and improving parking areas, driveways, and sites. | |||||||
Goodrich Area Schools | 02/22/2011 | 1 | Fanning Howey | Passed | 955/855 | $15,400,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities in part for security, safety and energy conservation improvements; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving athletic/physical education facilities, playgrounds and play fields; and developing and improving sites. | |||||||
Goodrich Area Schools | 06/12/2000 | 1 | THA | Passed | 771/562 | $26,315,000 | |
| Erecting, furnishing and equipping a new middle school and a new maintenance/bus garage facility; erecting, furnishing and equipping additions to, and remodeling, furnishing and refurnishing, equipping and re-equipping the existing middle/high school for high school purposes; partially remodeling, furnishing and refurnishing, equipping and re-equipping the elementary schools; acquiring, installing and equipping technology for existing school buildings and the new middle school; and constructing and equipping a pole barn, community pavilion, outdoor physical education/athletic facilities; and acquiring, developing and improving sites. The bonds are expected to be outstanding for a maximum of 30 years, exclusive of refunding. In addition to the current debt millage of 7.00 mills ($7.00 per $1,000 of taxable valuation) levied for all outstanding school district bonds in 2000, it is estimated that .75 mills ($0.75 for each $1,000 of taxable valuation) will be levied for the new bonds (for a net increase of .75 mills) in the first year. The estimated simple average debt millage rate for the life of the bond issue is 4.12 mills ($4.12 for each $1,000 of taxable valuation). | |||||||
Goodrich Area Schools | 06/12/2000 | 2 | THA | Failed | 567/763 | $2,800,000 | |
| Erecting, furnishing and equipping a swimming pool addition for the new middle school. The bonds are expected to be outstanding for a maximum a 30 years, exclusive of refunding. Of the total debt millage levied in the school district, it is estimated that .25 mils ($0.25 for each $1,000 of taxable valuation) in the first year and the estimated simple average debt millage rate for the life of the bond issue is .46 mills ($0.46 for each $1,000 of taxable valuation). | |||||||
Grand Blanc Community Schools | 05/05/2020 | 1 | Integrated Design Solutions | Passed | 6,396/4,411 | $86,925,000 | |
| Erecting, furnishing, and equipping a new athletic center and support buildings; erecting, furnishing, and equipping an addition to McGrath Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping existing school facilities for energy conservation and other purposes; erecting, preparing, developing, improving, and equipping athletic fields and structures; and preparing, developing, and improving playfields and sites. | |||||||
Grand Blanc Community Schools | 11/03/2015 | 1 | Gazall, Lewis & Assoc. Architects, Inc. | Passed | 3,223/2,962 | $32,605,000 | |
| Acquiring and installing instructional technology in school buildings and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, in part for technology infrastructure, security, and safety improvements. | |||||||
Grand Blanc Community Schools | 03/16/2004 | 1 | Etal | Passed | 5,256/4,794 | $94,000,000 | |
| Acquiring a site for a new middle school; erecting, equipping and furnishing two new middle schools and related athletic fields, and preparing, developing and improving the sites therefor; acquiring, installing and equipping school buildings for, technology improvements; remodeling, reequipping and refurnishing and Grand Blanc Middle School Main Campus buildings to provide a high school buildings, and preparing, developing and improving the site therefor; erecting, equipping and furnishing additions to and remodeling, reequipping and refurnishing Grand Blanc High School, and preparing, developing and improving the site therefor; acquiring sites for a new transportation services building and a new maintenance and grounds buildings; and erecting, equipping and furnishing a new transportation services building and a new maintenance and grounds building, and preparing, developing and improving the sites therefor. The maximum number of years the bonds may be outstanding, exclusive of refunding, is 24 years; the estimated millage that will be levied to pay the proposed bonds in the first year that the levy is authorized is 2.94 mills (which is equal to $2.94 per $1,000 of taxable value of real and tangible personal property in the School District); and the estimated simple average annual millage that will be required to retire the bonds is 2.90 mills (which is equal to $2.90 per $1,000 of taxable value of real and tangible personal property in the School District). | |||||||
Kearsley Community Schools | 05/03/2022 | 1 | French | Passed | 1,300/1,062 | $21,650,000 | |
| Erecting security and community recreation additions to, remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; and developing and improving driveways, parking areas and sites. | |||||||
Lake Fenton Community Schools | 11/05/2024 | 1 | Kingscott | Failed | 3,783/4,244 | $68,250,000 | |
| Erecting, remodeling, and equipping and re-equipping school buildings and facilities, and additions to school buildings and facilities; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites. | |||||||
Lake Fenton Community Schools | 05/02/2023 | 1 | Kingscott | Failed | 965/1,015 | $57,500,000 | |
| Erecting, furnishing, and equipping a new early childhood center; erecting, furnishing, and equipping additions to the high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; and preparing, erecting, developing, improving, and equipping playgrounds, athletic fields, facilities and structures, and sites. | |||||||
Lake Fenton Community Schools | 11/07/2017 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 944/669 | $11,755,000 | |
| Erecting, furnishing, and equipping an additions to the middle school; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; and preparing, developing, improving, and equipping playgrounds, athletic fields, and sites. | |||||||
Lake Fenton Community Schools | 03/12/2002 | 1 | THA | Passed | 2,126/1,555 | $30,325,000 | |
| Erecting, furnishing and equipping a new high school including an auditorium; developing, constructing and equipping outdoor physical education fields, and an athletic complex; acquiring and installing educational technology; developing and improving sites; remodeling, refurnishing and re-equipping a portion of the existing high school for kindergarten and early childhood purposes and developing and equipping a playground. The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in the year 2002 is 3.98 mills ($3.98 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-three (23) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.64 mills ($3.64 on each $1,000 of taxable valuation). | |||||||
Lake Fenton Community Schools | 09/29/1999 | 1 | URS Greiner | Failed | 1,552/1,886 | $39,425,000 | |
| Erecting, furnishing and equipping a new high school and acquiring a site therefor; partially remodeling the existing High School for community education and central administration offices; developing and improving outdoor physical education fields, athletic facilities, and sites; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Torrey Hill Middle School; and developing and improving the outdoor recreational area; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the West Shore Elementary School, developing and improving the playground; acquiring and installing educational technology; and developing and improving sites. | |||||||
Lake Fenton Community Schools | 03/29/1999 | 1 | URS Greiner | Failed | 1,359/1,364 | $39,475,000 | |
| Erecting, furnishing and equipping a new high school and a central maintenance and storage facility; acquiring a site; developing and improving outdoor physical education fields and athletic facilities; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Torrey Hill Middle School; and developing and improving the outdoor recreational area; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the West Shore Elementary School, developing and improving the playground; acquiring and installing educational technology; and developing and improving sites. | |||||||
Lakeville Community Schools | 11/05/2019 | 1 | None | Passed | 1,383/1,218 | $4,900,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing school buildings, including structures, playgrounds, and other facilities; acquiring and installing security systems at existing school buildings; acquiring, preparing, developing, and improving sites, including parking lots; constructing improvements and renovations to athletic fields and associated facilities, including bleachers, press box, and field house; and acquiring, installing, and equipping or reequipping school buildings for instructional technology and technology infrastructure. | |||||||
Lakeville Community Schools | 08/07/2012 | 1 | THA | Passed | 1,969/1,311 | $7,580,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing existing district school buildings and existing sites, acquiring and installing security systems at existing district school buildings, constructing enclosed walkway additions to Columbiaville Elementary School and LakeVille Memorial High School, which would also include renovation of athletic facilities thereon and equipping for technology and technology infrastructure, and for purchasing buses. | |||||||
Lakeville Community Schools | 02/28/2012 | 1 | THA | Failed | 1,282/1,461 | $7,580,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing existing district school buildings and existing sites, acquiring and installing security systems at existing district school buildings, constructing an enclosed walkway addition to Columbiaville Elementary School and an enclosed walkway addition to LakeVille Memorial High School, which would also include construction and renovation of athletic facilities thereon and equipping for technology and technology infrastructure, and for purchasing buses. | |||||||
Lakeville Community Schools | 02/28/2012 | 2 | THA | Failed | 1,028/1,697 | $4,110,000 | |
| Constructing a new auditorium addition to LakeVille Memorial High School, which would also include remodeling the existing site thereon. | |||||||
Lakeville Community Schools | 05/03/2011 | 1 | THA | Failed | 729/1,111 | $11,200,000 | |
| Improving, remodeling, equipping, furnishing, reequipping, and refurnishing existing district school buildings and existing sites, acquiring and installing security systems at existing district school buildings, constructing an enclosed walkway addition to Columbiaville Elementary School and an enclosed walkway addition and auditorium addition to LakeVille Memorial High School, which would also include construction and renovation of athletic facilities thereon and equipping for technology and technology infrastructure, and for purchasing buses. | |||||||
Lakeville Community Schools | 11/06/2007 | 1 | Integrated Designs | Failed | 560/847 | $5,500,000 | |
| Remodeling, refurnishing and re-equipping school district buildings; acquiring school buses, and developing and improving athletic fields and facilities and sites. | |||||||
Lakeville Community Schools | 03/13/2000 | 1 | THA | Passed | 1,004/948 | $15,300,000 | |
| Remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving play areas and sites. It is expected that the Bonds will be outstanding for a minimum of 18 years, exclusive of refunding. The estimated millage rate of 6.25 mills ($6.25 for each $1,000 of valuation) in the first year, 2000, and over the repayment period of the bond issue an estimated simple average annual millage rate of 4.21mills ($4.21 for each $1,000 of valuation). | |||||||
Lakeville Community Schools | 06/14/1999 | 1 | THA | Failed | 846/917 | $13,900,000 | |
| Remodeling, refurnishing and re-equipping school buildings, including educational technology system improvements and developing and improving playgrounds and sites. | |||||||
Lakeville Community Schools | 09/29/1998 | 1 | THA | Failed | 855/920 | $12,520,000 | |
| Remodeling, refurnishing and re-equipping school buildings, including educational technology system improvements and developing and improving playgrounds and sites. | |||||||
Lakeville Community Schools | 09/29/1998 | 2 | THA | Failed | 773/980 | $3,740,000 | |
| Erecting, furnishing and equipping an auditorium and music facility addition to and partially remodeling the LakeVille Memorial High School and developing and improving the site. | |||||||
Linden Community Schools | 11/03/2020 | 1 | French | Passed | 4,764/4,458 | $55,000,000 | |
| Erecting, furnishing, and equipping an addition to Linden Elementary School, an addition to Linden High School, and a multipurpose facility; remodeling, furnishing and refurnishing, and equipping and re-equipping existing school buildings and facilities; acquiring and installing instructional technology in school buildings; and preparing, developing, improving, and equipping playgrounds, playfields, athletic fields, and sites. | |||||||
Linden Community Schools | 09/23/2003 | 1 | Kingscott | Passed | 1,959/1,951 | $35,665,000 | |
| Erecting, furnishing and equipping a new middle school; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, playfields and sites? The estimated millage that will be levied for the proposed bonds in 2003, under current law, is 2.20 mills ($2.20 on each $1,000 of taxable valuation). The estimated millage in 2004 is 4.40 mills ($4.40 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.35 mills ($3.35 on each $1,000 of taxable valuation). | |||||||
Linden Community Schools | 09/23/2003 | 2 | Kingscott | Failed | 1,640/2,250 | $3,315,000 | |
| Erecting, furnishing and equipping a gymnasium addition to the Linden High School and developing and improving athletic fields, playfields and sites? The estimated millage that will be levied for the proposed bonds in 2003, under current law, is 0.25 mill ($0.25 on each $1,000 of taxable valuation). The estimated millage in 2004 is .50 mill ($0.50 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 0.31 mill ($0.31 on each $1,000 of taxable valuation). | |||||||
Linden Community Schools | 06/10/2002 | 1 | IDS | Failed | 1,471/2,447 | $58,720,000 | |
| Erecting, furnishing and equipping a new middle school and additions to existing school buildings; remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, playfields and sites | |||||||
Linden Community Schools | 09/25/2001 | 1 | IDS | Failed | 1,624/1,921 | $58,720,000 | |
| Erecting, furnishing and equipping a new middle school and additions to existing school district buildings; remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, playfields and sites. The following is for informational purposes only: It is expected that the bonds will be outstanding for a period of not more than 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2001 is 7 mills ($7.00 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 5.14 mills ($5.14 per $1,000 of taxable valuation). | |||||||
Linden Community Schools | 09/26/1998 | 1 | TMP | Failed | 1,061/1,323 | $38,215,000 | |
| Erecting, furnishing and equipping a new elementary school and developing and improving playgrounds and the site; erecting, furnishing and equipping an addition or additions to and partially remodeling, refurnishing and re-equipping the Argentine, Linden and Central Elementary Schools, and developing and improving playgrounds and sites; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Linden Middle School and developing and improving outdoor physical education facilities and the site; acquiring and installing educational technology in the Linden High School and all other school buildings. | |||||||
Linden Community Schools | 09/16/1996 | 1 | TMP |
| 0/0 | $55,815,000 | |
| null | |||||||
Montrose Community Schools | 11/07/2023 | 1 | Integrated Designs | Passed | 661/547 | $15,900,000 | |
| Erecting, furnishing, and equipping additions to the middle school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; preparing, developing, improving, erecting, and equipping athletic fields and facilities; and preparing, developing, improving, and equipping playgrounds and sites. | |||||||
Montrose Community Schools | 02/22/2011 | 1 | THA | Passed | 793/457 | $14,600,000 | |
| Erecting, furnishing and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping existing school buildings; acquiring and installing educational technology in school buildings; erecting, furnishing and equipping athletic facilities, athletic fields and playgrounds; and developing and improving sites. | |||||||
Montrose Community Schools | 02/04/1997 | 1 | THA | Passed | 696/680 | $12,480,000 | |
| null | |||||||
Mt. Morris Consolidated Schools | 05/05/2020 | 1 | French | Passed | 1,243/953 | $11,200,000 | |
| Erecting and remodeling, and equipping or reequipping, except for equipping or reequipping for technology, school buildings, including structures, athletic fields, playgrounds, or other facilities, or parts of or additions to those facilities, including security upgrades; acquiring, preparing, developing, and improving sites, or parts of or additions to sites, for school buildings, including structures, athletic fields, playgrounds, or other facilities. | |||||||
Mt. Morris Consolidated Schools | 09/26/2000 | 1 | THA | Failed | 766/1,158 | $16,545,000 | |
| Erecting, furnishing, and equipping a new middle school building; acquiring, installing and equipping the new building for technology; and preparing and developing the site, including athletic fields and playgrounds. It is estimated that 5.31 mills ($5.31 per $1,000 of taxable value) will be levied in 2000 for all debt of which an estimated 5.31 mills will be allocated to this issue. The bonds shall be repaid over a maximum period of 27 years with an estimated simple average annual levy of property taxes of 4.48 mills ($4.48 per $1,000 of taxable value). | |||||||
Mt. Morris Consolidated Schools | 10/12/1999 | 1 | THA | Failed | 703/914 | $15,490,000 | |
| Erecting, furnishing, and equipping a new middle school building; acquiring, installing, and equipping the new building for computer technology; and preparing and developing the site, including athletic fields and playgrounds. | |||||||
Mt. Morris Consolidated Schools | 09/09/1996 | 1 | THA | Failed | 702/1,175 | $16,425,000 | |
| null | |||||||
Swartz Creek Community Schools | 11/05/2024 | 1 | French | Passed | 7,911/6,201 | $38,800,000 | |
| Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing and equipping school support buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and acquiring, equipping, developing and improving playgrounds, athletic fields and facilities, sidewalks, driveways, parking areas and sites. | |||||||
Swartz Creek Community Schools | 11/06/2018 | 1 | NJB Architects, Inc | Passed | 6,693/5,290 | $48,000,000 | |
| Erecting, furnishing and equipping additions to school buildings and facilities; remodeling, including safety and security improvements to, furnishing and refurnishing and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting, developing, equipping and improving playgrounds, athletic facilities and fields, driveways, parking areas and sites. | |||||||
Swartz Creek Community Schools | 05/08/2007 | 1 | SHW Group, LLP | Failed | 2,837/3,961 | $79,070,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-quipping school district buildings, erecting, furnishing and equipping a new high school building; acquiring and installing educational technology improvements; acquiring real property for site purposes; and developing and improving outdoor physical education facilities, playgrounds and sites. | |||||||
Swartz Creek Community Schools | 05/08/2007 | 2 | SHW Group, LLP | Failed | 2,501/4,271 | $10,595,000 | |
| Erecting, furnishing and equipping an auditorium addition to the proposed new high school and developing and improving the site. | |||||||
Swartz Creek Community Schools | 09/27/2003 | 1 | URS Greiner | Failed | 1,723/3,958 | $59,370,000 | |
| Erecting, furnishing and equipping a new high school building; acquiring and installing educational technology improvements; partially remodeling the existing high school for educational, administrative and community uses; and developing and improving athletic fields and facilities and sites? The estimated millage that will be levied for the proposed bonds in 2003 is 2.0 mills ($2.00 on each $1,000 of taxable valuation). The estimated millage that will be levied for the proposed bonds in 2004 is 4.0 mills ($4.00 on each $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.98 mills ($2.98 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. | |||||||
Michigan.gov Home
| Contact Treasury | State Web
Sites | FAQ | Sitemap
Privacy Policy | Link Policy | Accessibility
Policy | Security
Policy
Copyright © 2001-2010 State of Michigan