STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
ISABELLA COUNTY
Shepherd Public School District
|
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
08/06/2024 | 1 | Kingscott | Failed | 934/1,105 | $25,200,000 | |
| Erecting, remodeling, equipping and re-equipping district owned school buildings, facilities, and additions to school buildings and facilities; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites. | ||||||
11/06/2007 | 1 | Tower, etal | Passed | 1,070/648 | $29,125,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; developing and improving playgrounds, athletic fields and facilities and sites. | ||||||
03/28/2001 | 1 | Wakely-M | Failed | 498/645 | $12,410,000 | |
| Erecting, furnishing and equipping a new elementary school; an addition to the existing Shepherd Elementary School and a kitchen addition to the high school/middle school; partially remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements and developing and improving a playground and sites. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated millage that will be levied for the proposed bonds in the year 2001 is 3.76 mills ($3.76 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.46 mills ($4.46 per $1,000 of taxable valuation). | ||||||
03/28/2001 | 2 | Wakely-M | Failed | 409/713 | $3,395,000 | |
| Erecting, furnishing and equipping an auditorium addition to and partially remodeling the Shepherd High School/Middle School and developing and improving the site. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated millage that will be levied for the proposed bonds in the year 2001 is 2.13 mills ($2.13 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.19 mills ($1.19 per $1,000 of taxable valuation). | ||||||
03/28/2001 | 3 | Wakely-M | Failed | 475/631 | $945,000 | |
| Developing and improving a track and field complex. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated millage that will be levied for the proposed bonds in the year 2001 is 0.59 mills ($0.59 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 0.32 mills ($0.32 per $1,000 of taxable valuation). | ||||||
09/26/2000 | 1 | Wakely-M | Failed | 475/649 | $15,410,000 | |
| Erecting, furnishing and equipping a new elementary school and additions, including an auditorium, to school buildings; partially remodeling, refurnishing and re-equipping school buildings, including educational technology improvements; and developing, equipping and improving a track facility and sites. The following is for informational purposes only: The bonds are expected to be outstanding for a maximum of 30 years, exclusive of refunding. The estimated millage rate for this debt the first year is 6.34 mills ($6.34 for each $1,000 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue is 6.25 mills ($6.25 for each $1,000 of taxable valuation). The increase in the December 2000 tax levy is 5 mills, to a total millage rate of 8.45 mills. | ||||||
09/27/1999 | 1 | Wakely-M | Failed | 351/428 | $13,490,000 | |
| Erecting, furnishing and equipping a new elementary building; partially remodeling, refurnishing and re-equipping school buildings; erecting, furnishing and equipping additions to school buildings including a new auditorium at the middle school/high school; acquiring and installing educational technology improvements; and developing and improving a playground, athletic fields and facilities and sites. | ||||||
09/23/1997 | 1 | Wakely-M | Failed | / | $13,045,000 | |
| null | ||||||
Michigan.gov Home
| Contact Treasury | State Web
Sites | FAQ | Sitemap
Privacy Policy | Link Policy | Accessibility
Policy | Security
Policy
Copyright © 2001-2010 State of Michigan