STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
KALAMAZOO COUNTY
School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
Climax-Scotts Community Schools | 05/02/2023 | 1 | TMP | Passed | 462/404 | $16,200,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | |||||||
Climax-Scotts Community Schools | 05/08/2018 | 1 | Kingscott | Passed | 468/258 | $9,400,000 | |
| Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and developing, improving and equipping playgrounds, athletic facilities and sites. | |||||||
Climax-Scotts Community Schools | 05/08/2018 | 2 | Kingscott | Passed | 363/293 | $2,170,000 | |
| Erecting, furnishing and equipping a new auxiliary gymnasium at the middle/high school; and preparing, developing, improving and equipping the site. | |||||||
Climax-Scotts Community Schools | 04/30/2001 | 1 | GMB | Passed | 517/314 | $1,200,000 | |
| Replacing roofs and reconstructing heating and ventilating systems at existing school buildings. It is expected that the Bonds will be outstanding for not more than 18 years, exclusive of refunding. Under current law, the estimated millage rate for the first year of levy is 2/10 mill ($0.20 for each $1,000.00 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue is 1.22 mills ($1.22 for each $1,000.00 of taxable valuation). | |||||||
Climax-Scotts Community Schools | 04/30/2001 | 2 | GMB | Passed | 410/406 | $890,000 | |
| Erecting, furnishing and equipping an industrial arts technology facility and developing and improving the site; remodeling the stage in the cafetorium at the Jr./Sr. High School; constructing an 8-lane all-weather track and field events area. It is expected that the Bonds will be outstanding for not more than 18 years, exclusive of refunding. Under current law, the estimated millage rate for the first year of levy for this Proposal is no increase over the existing bonded debt millage of 7 mills ($7.00 for each $1,000.00 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue is .92 mill ($0.92 for each $1,000.00 of taxable valuation). If Proposals I and II are approved, it is expected that the Bonds will be outstanding for not more than 18 years. Under current law, the estimated levy for the first year is 7.2 mills ($7.20 for each $1,000.00 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of the combined bond issue is 1.84 mills ($1.84 for each $1,000.00 of taxable valuation). | |||||||
Climax-Scotts Community Schools | 02/23/1999 | 1 | TSK Roof | Failed | 155/377 | $735,000 | |
| Replacing the roofs on existing school buildings. | |||||||
Comstock Public Schools | 11/04/2025 | 1 | GMB | Failed | 1,238/1,356 | $31,800,000 | |
| Erecting and remodeling school buildings, facilities and additions to school buildings and facilities; equipping, re-equipping, furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites. | |||||||
Comstock Public Schools | 05/03/2022 | 1 | GMB | Passed | 1,103/1,026 | $39,430,000 | |
| Erecting, furnishing and equipping school buildings and additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing and equipping and re-equipping school buildings for instructional technology and instructional technology equipment for school facilities; and preparing, developing, improving and equipping athletic facilities, athletic fields, playgrounds and sites. | |||||||
Comstock Public Schools | 11/08/2005 | 1 | GMB | Failed | 1,142/2,389 | $49,900,000 | |
| • erecting, furnishing and equipping additions to existing School District buildings; • remodeling, equipping, furnishing, reequipping and refurnishing existing School District buildings, including safety and security improvements; • acquiring and installing technology equipment and infrastructure in and connecting School District buildings; and • improving and developing sites, including playgrounds, outdoor athletic fields, facilities and structures in the School District? The estimated millage to be levied in 2006 to service this issue of bonds is 6.39 mills ($6.39 per $1,000 of taxable value) and the estimated simple average annual millage rate required to retire the bonds of this issue is 5.57 mills ($5.57 per $1,000 of taxable value). The bonds may be payable in not to exceed 26 years from the date of issue | |||||||
Comstock Public Schools | 05/03/2005 | 1 | GMB | Failed | 1,282/1,771 | $49,900,000 | |
| erecting, furnishing and equipping additions to existing School District buildings; remodeling, equipping, furnishing, reequipping and refurnishing existing School District buildings, including safety and security improvements; acquiring and installing technology equipment and infrastructure in and connecting School District buildings; and improving and developing sites, including playgrounds, outdoor athletic fields, facilities and structures in the School District. The estimated millage to be levied in 2005 to service this issue of bonds is 5.87 mills ($5.87 per $1,000 of taxable value) and the estimated simple average annual millage rate required to retire the bonds of this issue is 5.70 mills ($5.70 per $1,000 of taxable value). The bonds may be payable in not to exceed 26 years from the date of issue. | |||||||
Comstock Public Schools | 09/23/1996 | 1 | Tower, etal | Failed | 845/1,477 | $27,435,000 | |
| null | |||||||
Galesburg-Augusta Community Schools | 05/05/2026 | 1 | Tower Pinkster | Passed | 964/881 | $11,240,000 | |
| Remodeling school buildings and facilities; equipping, re-equipping, furnishing and refurnishing school buildings and facilities; erecting a new transportation facility; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping structures, facilities and sites. | |||||||
Galesburg-Augusta Community Schools | 11/04/2025 | 1 | Tower Pinkster | Failed | 731/836 | $11,200,000 | |
| Remodeling school buildings and facilities; equipping, re-equipping, furnishing and refurnishing school buildings and facilities; erecting a new transportation facility; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping structures, facilities and sites. | |||||||
Galesburg-Augusta Community Schools | 11/02/2021 | 1 | Tower Pinkster | Passed | 1,176/594 | $16,500,000 | |
| Erecting, completing, remodeling, or equipping or reequipping school buildings, a multipurpose instructional facility or other facilities, or parts of or additions to those facilities; furnishing or refurnishing school buildings; acquiring, preparing, developing, improving, or equipping structures, a multipurpose athletic facility, athletic fields or sites, or parts of or additions to sites, for school buildings or other facilities; purchasing school buses; and acquiring, installing, or equipping or reequipping school buildings for instructional technology. | |||||||
Galesburg-Augusta Community Schools | 05/04/2021 | 1 | Tower Pinkster | Failed | 803/805 | $14,990,000 | |
| Erecting, completing, remodeling, or equipping or reequipping school buildings, a multipurpose instructional facility or other facilities, or parts of or additions to those facilities; furnishing or refurnishing school buildings; acquiring, preparing, developing, improving, or equipping structures, a multipurpose athletic facility, athletic fields or sites, or parts of or additions to sites, for school buildings or other facilities; purchasing school buses; and acquiring, installing, or equipping or reequipping school buildings for instructional technology. | |||||||
Galesburg-Augusta Community Schools | 05/03/2016 | 1 | Tower Pinkster | Passed | 777/682 | $10,400,000 | |
| Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, and equipping or re-equipping school buildings for instructional technology; and developing, improving and equipping sites. | |||||||
Galesburg-Augusta Community Schools | 11/03/2015 | 1 | Tower Pinkster | Failed | 791/923 | $14,000,000 | |
| Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, and equipping or re-equipping school buildings for instructional technology; erecting, furnishing and equipping athletic structures; and preparing, developing, improving and equipping athletic facilities and fields and sites. | |||||||
Galesburg-Augusta Community Schools | 05/08/2012 | 1 | Kingscott | Failed | 324/640 | $9,650,000 | |
| Constructing, furnishing and equipping a 7th and 8th grade addition to the high school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring and installing educational technology in the 7th and 8th grade addition to the high school building, remodeling bleachers at the athletic complex at the primary school; and developing and improving sites. | |||||||
Galesburg-Augusta Community Schools | 05/08/2012 | 2 | Kingscott | Failed | 327/638 | $790,000 | |
| Constructing and equipping a new track at the high school and developing and improving the site. | |||||||
Galesburg-Augusta Community Schools | 05/02/2006 | 1 | Kingscott | Failed | 699/1,005 | $3,310,000 | |
| Constructing and equipping athletic fields and facilities and replacing the middle school roof. | |||||||
Galesburg-Augusta Community Schools | 05/02/2006 | 2 | Kingscott | Failed | 606/1,079 | $2,120,000 | |
| Erecting, furnishing and equipping an athletic facility building or addition, including minor associated remodeling to the high school, acquiring and installing educational technology improvements, and developing and improving the site. | |||||||
Galesburg-Augusta Community Schools | 05/02/2006 | 3 | Kingscott | Failed | 602/1,079 | $5,870,000 | |
| Erecting, furnishing and equipping an auditorium addition to the high school and expanding the band room, acquiring and installing educational technology improvements and developing and improving the site. | |||||||
Galesburg-Augusta Community Schools | 08/02/2005 | 1 | Kingscott | Failed | 698/980 | $12,880,000 | |
| erecting, furnishing and equipping auditorium and gymnasium additions to the high school; acquiring and installing technology improvements; partially remodeling and re-equipping school buildings; and developing and improving playfields, athletic fields and facilities and the high school site? The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2005, under current law, is -0- mill ($0.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.49 mills ($2.49 on each $1,000 of taxable valuation). The total debt levy to be made in December 2005 will continue at 7.00 mills ($7.00 on each $1,000 of taxable valuation). | |||||||
Galesburg-Augusta Community Schools | 09/26/2000 | 1 | Kingscott | Passed | 1,098/954 | $21,670,000 | |
| Erecting, furnishing and equipping a new high school; remodeling, refurnishing and re-equipping the existing school buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds, athletic fields and sites. It is expected that the Bonds will be outstanding for a maximum of 30 years, exclusive of refunding. The estimated millage rate of 7 mills ($7.00 for each $1,000 of valuation) in the first year, 2000, and over the repayment period of the bond issue an estimated simple average annual millage rate of 6.17 mills ($6.17 for each $1,000 of valuation). | |||||||
Galesburg-Augusta Community Schools | 09/26/2000 | 2 | Kingscott | Failed | 997/1,052 | $4,065,000 | |
| Erecting, furnishing and equipping an auditorium addition to the proposed new high school; and developing and improving athletic facilities and sites. It is expected that the Bonds will be outstanding for a maximum of 30 years, exclusive of refunding. The estimated millage rate of .75 mill ($0.75 for each $1,000 of valuation) in the first year, 2000, and over the repayment period of the bond issue an estimated simple average annual millage rate of 1.31 mills ($1.31 for each $1,000 of valuation). | |||||||
Galesburg-Augusta Community Schools | 03/23/1998 | 1 | Kingscott | Failed | 647/858 | $12,670,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping the Galesburg-Augusta Primary School; partially remodeling and reequipping the Galesburg-Augusta Middle and High Schools' acquiring and installing educational technology improvements and relocating the playground and developing and improving the site. | |||||||
Galesburg-Augusta Community Schools | 09/23/1996 | 1 | Kingscott | Failed | 467/1,063 | $17,800,000 | |
| null | |||||||
Gull Lake Community Schools | 05/08/2018 | 1 | Kingscott | Passed | 1,876/1,583 | $64,955,000 | |
| Erecting, furnishing and equipping additions to school buildings and facilities; remodeling, furnishing and refurnishing and equipping and re-equipping, including security measures, school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, equipping and improving playgrounds, parking areas, driveways and sites. | |||||||
Gull Lake Community Schools | 05/08/2012 | 1 | Kingscott | Passed | 1,256/915 | $7,290,000 | |
| Acquiring, installing, and equipping educational technology for school facilities; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part, for educational technology improvements; erecting, furnishing and equipping a multi-purpose room addition to Richland Elementary School; and developing and improving sites. | |||||||
Gull Lake Community Schools | 09/21/2004 | 1 | Kingscott | Passed | 3,672/2,256 | $39,720,000 | |
| erecting, furnishing and equipping a new high school; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part for technology improvements and to convert the existing high school to a middle school facility and existing middle school to an administration; acquiring, installing and equipping technology for existing school facilities and the new high school; constructing a corridor to connect Kellogg Elementary School to the existing middle school; and developing and improving sites? The estimated millage that will be levied for the proposed bonds in 2004 is 3.69 mills ($3.69 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.84 mills ($2.84 on each $1,000 of taxable valuation). | |||||||
Gull Lake Community Schools | 06/10/2002 | 1 | Kingscott | Failed | 2,002/2,792 | $44,900,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; erecting, furnishing and equipping a maintenance facility; constructing, improving, relocating and equipping playgrounds and playfields; constructing and equipping a stadium concession stand; and developing and improving sites. The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2002, under current law, is 5.70 mills ($5.70 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.99 mills ($3.99 of each $1,000 of taxable valuation). | |||||||
Gull Lake Community Schools | 06/10/2002 | 2 | Kingscott | Failed | 1,828/3,030 | $9,935,000 | |
| Erecting, furnishing and equipping an auditorium at the high school; acquiring, installing and equipping technology for the new auditorium; constructing, improving and equipping outdoor baseball/softball/soccer fields, practice and playfields, and athletic/physical education facilities; replacing the high school gym floor; and developing and improving sites. The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2002, under current law, is 1.26 mills ($1.26 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 0.90 mill ($0.90 of each $1,000 of taxable valuation). | |||||||
Gull Lake Community Schools | 09/26/2000 | 1 | URS Greiner | Failed | 1,542/3,717 | $66,500,000 | |
| Erecting, furnishing and equipping a new high school and acquiring a site therefor; erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping existing school buildings; acquiring, installing and equipping technology for existing school buildings and the new high school; constructing, equipping, developing, and improving physical education/athletic facilities and playfields; and developing and improving sites. The bonds are expected to be outstanding for a maximum of 30 years, exclusive of refunding. The estimated millage rate for this bond issue in the first year is 7 mills ($7.00 for each $1,000 of taxable valuation) for an estimated net increase of 6.77 mills ($6.77 for each $1,000 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue is 6.36 mills ($6.36 for each $1,000 of taxable valuation). | |||||||
Parchment School District | 11/03/2026 | 1 | Tower Pinkster |
| 0/0 | $41,000,000 | |
| Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology; and preparing, developing, improving, and equipping playgrounds and sites. | |||||||
Parchment School District | 11/04/2025 | 1 | Tower Pinkster | Failed | 962/1,040 | $32,350,000 | |
| Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, including creating secure entrances at the elementary schools; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, and improving sites. | |||||||
Parchment School District | 05/06/2025 | 1 | Tower Pinkster | Failed | 705/797 | $36,400,000 | |
| Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security improvements; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing and improving sites. | |||||||
Parchment School District | 02/27/2007 | 1 | Kingscott | Passed | 1,085/672 | $18,000,000 | |
| Erecting, furnishing and equipping additions to, and remodeling, refurnishing and re-equipping Parchment High School; acquiring and installing educational technology improvements; and developing and improving athletic fields and facilities and the site. | |||||||
Parchment School District | 06/08/1998 | 1 | Tower, etal | Passed | 1,095/847 | $15,410,000 | |
| Erecting, furnishing and equipping additions to Central, North and Northwood Elementaries and the Parchment Middle School; Partially remodeling, refurnishing and re-equipping school buildings, including educational technology improvements; and developing and improving playgrounds and sites. | |||||||
Parchment School District | 06/08/1998 | 2 | Tower, etal | Passed | 994/932 | $3,720,000 | |
| II. ($3,720,000) Erecting, furnishing and equipping a classroom addition to, partially remodeling and re-equipping the Parchment High School and developing and improving the site. | |||||||
Parchment School District | 06/08/1998 | 3 | Tower, etal | Failed | 847/1,060 | $1,180,000 | |
| III. ($1,180,000) Erecting, furnishing and equipping a practice gymnasium addition to the Parchment High School and developing and improving the site. | |||||||
Parchment School District | 03/25/1997 | 1 | Tower, etal | Failed | 844/1,448 | $28,800,000 | |
| null | |||||||
Parchment School District | 09/23/1996 | 1 | Tower, etal | Failed | 944/1,018 | $28,225,000 | |
| null | |||||||
Portage Public Schools | 06/10/1996 | 1 | Marshburn Bunkley | Passed | 1,993/1,595 | $18,185,000 | |
| null | |||||||
Schoolcraft Community Schools | 03/10/2020 | 1 | TMP | Passed | 1,179/1,082 | $39,900,000 | |
| Erecting, furnishing, and equipping a new elementary school; erecting, furnishing, and equipping additions to the high school to convert it to a grades 7-12 facility; remodeling, furnishing and refurnishing, and equipping and re-equipping existing school buildings; acquiring and installing instructional technology in school buildings; erecting an addition to the athletic and maintenance building; and erecting, equipping, preparing, developing, and improving playgrounds, playfields, athletic fields and facilities, and sites. | |||||||
Schoolcraft Community Schools | 11/05/2019 | 1 | C2AE | Failed | 769/830 | $39,900,000 | |
| Erecting, furnishing, and equipping a new elementary school; erecting, furnishing, and equipping additions to the high school to convert it to a grades 7-12 facility; remodeling, furnishing and refurnishing, and equipping and re-equipping existing school buildings; acquiring and installing instructional technology in school buildings; and erecting, equipping, preparing, developing, and improving playgrounds, playfields, athletic fields and facilities, and sites. | |||||||
Schoolcraft Community Schools | 08/05/2014 | 1 | Tower Pinkster | Failed | 617/768 | $14,400,000 | |
| Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping additions to the high school for middle school purposes; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving athletic and recreation facilities and playgrounds; and developing and improving sites. | |||||||
Schoolcraft Community Schools | 09/23/1996 | 1 | URS Greiner | Passed | 654/530 | $17,860,000 | |
| null | |||||||
Vicksburg Community Schools | 05/05/2020 | 1 | Tower Pinkster | Passed | 2,216/1,744 | $41,750,000 | |
| Remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities; acquiring, installing, and equipping school facilities with instructional technology; purchasing school buses; and preparing, developing, improving, and equipping Vicksburg Stadium, athletic fields, and sites. | |||||||