STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
KENT COUNTY
School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
Byron Center Public Schools | 11/04/2025 | 1 | Tower Pinkster | Passed | 4,062/3,129 | $110,000,000 | |
| Erecting, furnishing, and equipping additions to school facilities; partially remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities; acquiring and installing instructional technology and instructional technology equipment for school facilities; erecting, furnishing, and equipping a bus garage facility; purchasing school buses; acquiring sites; erecting, preparing, developing, improving, furnishing, and equipping athletic facilities and fields; and preparing, developing, and improving a playground and sites. | |||||||
Byron Center Public Schools | 05/05/2020 | 1 | Tower Pinkster | Passed | 4,805/2,830 | $80,185,000 | |
| Erecting, furnishing, and equipping a new intermediate school building; erecting, furnishing, and equipping additions to school facilities; remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities; acquiring, installing, and equipping school facilities with instructional technology; purchasing school buses; preparing, developing, improving, and equipping playgrounds, play fields, and athletic fields; and acquiring and developing sites. | |||||||
Byron Center Public Schools | 05/02/2017 | 1 | Tower Pinkster | Passed | 3,218/1,812 | $68,240,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, and equipping and re-equipping school district facilities; acquiring, installing and equipping and re-equipping school district facilities for instructional technology; erecting and equipping a team building and a restroom building; purchasing school buses; preparing, developing, improving and equipping athletic fields; and acquiring, developing and improving sites. | |||||||
Byron Center Public Schools | 11/08/2011 | 1 | Tower Pinkster | Passed | 2,274/1,062 | $23,600,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving playgrounds and sites. | |||||||
Byron Center Public Schools | 09/22/2001 | 1 | Tower-G | Passed | 1,164/720 | $47,170,000 | |
| Erecting, furnishing and equipping a new middle school and a new elementary school; erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology; acquiring land for site purposes; and developing and improving sites, playgrounds and playfields. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. No millage will be levied for the proposed bonds in the year 2001. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.11 mills ($3.11 per $1,000 of taxable valuation). | |||||||
Byron Center Public Schools | 02/22/1997 | 1 | Tower, etal | Passed | 1,410/1,023 | $5,730,000 | |
| null | |||||||
Byron Center Public Schools | 06/10/1996 | 1 | Tower, etal | Failed | 1,405/1,517 | $4,900,000 | |
| null | |||||||
Caledonia Community Schools | 05/02/2023 | 1 | Plante & Moran PLLC (Cresa) | Passed | 3,019/2,955 | $61,000,000 | |
| Erecting, furnishing and equipping an elementary school building; erecting and equipping an addition to the high school building; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting storage structures; purchasing school buses; and acquiring, erecting, preparing, developing, improving and equipping playgrounds, playfields, athletic fields, athletic facilities, and sites. | |||||||
Caledonia Community Schools | 05/05/2020 | 1 | Plante & Moran PLLC (Cresa) | Passed | 4,246/2,871 | $88,090,000 | |
| Erecting, furnishing and equipping a new elementary school; erecting, furnishing, and equipping a new athletic complex; erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping or re-equipping school buildings for instructional technology; and acquiring, preparing, developing, improving and equipping playgrounds, play fields, athletic fields and facilities and sites. | |||||||
Caledonia Community Schools | 05/06/2014 | 1 | GMB | Passed | 1,991/810 | $41,000,000 | |
| Erecting, furnishing and equipping a new freshman plus building; erecting, furnishing and equipping additions to existing school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings for instructional technology; and preparing, developing and improving athletic fields, athletic facilities, playgrounds and sites. | |||||||
Caledonia Community Schools | 05/08/2007 | 1 | GMB | Passed | 2,168/1,092 | $30,500,000 | |
| Constructing, furnishing and equipping a new elementary school and additions to other school buildings; remodeling, furnishing and refurnishing, and equipping and reequipping school buildings; acquiring and installing educational technology improvements to school buildings; purchasing school buses; acquiring a site or sites; and developing and improving playgrounds, play fields, athletic fields and facilities and sites. | |||||||
Caledonia Community Schools | 09/26/2000 | 1 | GMB | Passed | 2,092/2,010 | $45,700,000 | |
| Erecting, furnishing and equipping a new high school; partially remodeling, refurnishing and re-equipping the existing high school for a middle school, central administration, community education and other district services; acquiring and installing educational technology; developing and improving outdoor physical education, athletic fields and sites. The following is for informational purposes only: It is expected that the Bonds will be outstanding for not more than 26 years, exclusive of refunding. The estimated millage rate for the first levy for the proposed issue is 2.22 mills ($2.22 for each $1,000 of taxable valuation), which is an increase of 1.40 mills ($1.40 for each $1,000 of taxable valuation) over the millage rate for the current levy of 5.60 mills ($5.60 for each $1,000 of taxable valuation) and an estimated simple average annual millage rate for the proposed issue of 2.09 mills ($2.09 for each $1,000 of taxable valuation). Under the present School Bond Loan Fund Program it is estimated that the total levy will not exceed 7 mills ($7.00 for each $1,000 of taxable valuation) for approximately 6 years and thereafter decreases to an estimated simple average annual millage rate of 4 mills ($4.00 for each $1,000 of taxable valuation). | |||||||
Caledonia Community Schools | 09/26/2000 | 2 | GMB | Passed | 2,089/1,977 | $5,050,000 | |
| Partially remodeling, refurnishing and re-equipping the existing elementary schools for the purpose of acquiring and installing educational technology; purchasing buses; developing and improving playgrounds and sites. The following is for informational purposes only: It is expected that the Bonds will be outstanding for not more than 11 years, exclusive of refunding. The estimated millage rate for the first levy for the proposed issue is 0.49 mill ($0.49 for each $1,000 of taxable valuation), and an estimated simple average annual millage rate for the proposed issue of 0.46 mill ($0.46 for each $1,000 of taxable valuation). If Propositions I and II are approved under the present School Bond Loan Fund Program it is estimated that the total debt levy will not exceed 7 mills ($7.00 for each $1,000 of taxable valuation) being an increase of 1.40 mills ($1.40 for each $1,000 of taxable valuation) over the current tax levy for a period of approximately 8 years and thereafter decreases to an estimated simple average annual millage rate of 4 mills ($4.00 for each $1,000 of taxable valuation). | |||||||
Caledonia Community Schools | 06/12/2000 | 1 | GMB | Failed | 1,195/1,253 | $49,950,000 | |
| Erecting, furnishing and equipping a new high school; partially remodeling, refurnishing and re-equipping the existing high school for the purpose of providing for middle school, central administration, community education and other district services; acquiring and installing educational technology in proposed and existing school facilities; acquiring school buses; acquiring additional land; developing and improving playgrounds, outdoor physical education and athletic fields and sites. It is expected that the Bonds will be outstanding for not more than 26 years, exclusive of refunding. The estimated millage rate for the year 2000 for the proposed issue is 1.73 mills ($1.73 for each $1,000 of taxable valuation), which is an increase of 1.43 mills ($1.43 for each $1,000 of taxable valuation) over the millage rate for the year 1999 of 5.7 mills ($5.57 for each $1,000 of taxable valuation) for a total of not to exceed 7 mills ($7.00 for each $1,000 of taxable valuation) for 15 years and thereafter decreases to an estimated average annual simple millage rate of 4.21 mills ($4.21 for each $1,000 of taxable valuation) for 11 years for all bonded debt. | |||||||
Caledonia Community Schools | 06/10/1996 | 1 | GMB | Passed | 1,573/1,401 | $13,610,000 | |
| null | |||||||
Caledonia Community Schools | 06/10/1996 | 2 | GMB | Passed | 1,604/1,369 | $7,045,000 | |
| null | |||||||
Cedar Springs Public Schools | 08/04/2020 | 1 | GMB | Passed | 2,371/2,358 | $68,000,000 | |
| Purchasing, erecting, completing, remodeling, or equipping or reequipping school buildings or other facilities, or parts of or additions to those facilities; furnishing or refurnishing school buildings; acquiring, preparing, developing, or improving sites, or parts of or additions to sites, for school buildings or other facilities; and acquiring, installing, or equipping or reequipping school buildings for technology. | |||||||
Cedar Springs Public Schools | 11/05/2019 | 1 | GMB | Failed | 1,502/1,935 | $81,150,000 | |
| Acquiring and constructing a school building and additions to school buildings and other facilities; remodeling, furnishing, refurnishing, equipping and reequipping school buildings and other facilities, including for security purposes; constructing, equipping and reequipping, developing and improving play fields, playgrounds, athletic fields and athletic facilities; acquiring, improving and developing sites at school buildings and other facilities; and, acquiring and installing technology infrastructure and equipment in school buildings and other facilities. | |||||||
Cedar Springs Public Schools | 12/07/2002 | 1 | Beta Design | Passed | 1,617/588 | $31,870,000 | |
| Erecting, furnishing and equipping a new middle school; erecting, furnishing and equipping additions to and/or remodeling existing school facilities; acquiring and installing educational technology; constructing playfields and playgrounds; acquiring land and developing and improving sites. The following is for information purposes only: The estimated millage that will be levied for the proposed bonds in 2002, under current law is 0- mills due to planned borrowing from the School Bond Loan Fund. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.16 mills ($3.16 on each $1,000 of taxable valuation). Under current law, the millage for all existing and proposed debt, including this issue, is not expected to exceed 7 mills ($7.00 on each $1,000 of taxable valuation). | |||||||
Cedar Springs Public Schools | 12/07/2002 | 2 | Beta Design | Passed | 1,339/854 | $2,550,000 | |
| Constructing an athletic complex to include a stadium, track, football, softball, playfields and concession stand/locker room/restrooms facilities; and developing and improving the site. The following is for information purposes only: The estimated millage that will be levied for the proposed bonds in 2002, under current law is 0- mills due to planned borrowing from the School Bond Loan Fund. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 0.24 mill ($0.24 on each $1,000 of taxable valuation). Under current law, the millage for all existing and proposed debt, including this issue, is not expected to exceed 7 mills ($7.00 on each $1,000 of taxable valuation). | |||||||
Comstock Park Public Schools | 05/02/2023 | 1 | GMB | Passed | 1,129/697 | $59,460,000 | |
| Erecting, remodeling, and equipping and re-equipping school buildings and additions to school buildings and other facilities; furnishing and refurnishing and equipping and re-equipping school buildings and other facilities; acquiring, installing, and equipping and reequipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving, and equipping athletic fields, play fields, and sites. | |||||||
Comstock Park Public Schools | 02/22/2011 | 1 | GMB | Passed | 962/576 | $21,530,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving physical education/athletic facilities, playgrounds and play fields; purchasing school buses; and developing and improving sites. | |||||||
Comstock Park Public Schools | 02/22/2011 | 2 | GMB | Passed | 853/681 | $7,790,000 | |
| Erecting, furnishing and equipping additions to the high school for a multi-purpose performing arts center and auxiliary gymnasium and related remodeling; acquiring, installing and equipping technology for the addition; constructing and improving the high school stadium; and developing and improving the site. | |||||||
Comstock Park Public Schools | 09/28/1999 | 1 | Beta Design | Passed | 478/245 | $10,725,000 | |
| Partially remodeling, refurnishing and re-equipping, and erecting, furnishing and equipping additions to school buildings; acquiring, installing and equipping educational technology for school buildings; and constructing, equipping, developing and improving outdoor playfields; constructing tennis courts and storage buildings; and developing, improving and acquiring sites. | |||||||
Comstock Park Public Schools | 09/24/1996 | 1 | Beta Design | Passed | 661/347 | $11,900,000 | |
| null | |||||||
East Grand Rapids Public Schools | 11/07/2023 | 1 | Pure Architecture & Development | Passed | 2,581/749 | $158,900,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting and equipping a structure supporting an addition at the high school; and acquiring, preparing, developing, improving and equipping athletic fields, playgrounds and facilities and sites. | |||||||
East Grand Rapids Public Schools | 05/06/2014 | 1 | GMB | Passed | 1,280/757 | $30,905,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing, improving and equipping sites. | |||||||
East Grand Rapids Public Schools | 11/06/2007 | 1 | URS Greiner | Passed | 1,472/1,112 | $12,480,000 | |
| Constructing, furnishing and equipping improvements to Mehney and Memorial Fields; erecting, furnishing and equipping additions to the high school to include an auxiliary gym, training center and additional seating at the pool; constructing, furnishing and equipping a field event center to include team rooms, concessions and restrooms; erecting, furnishing and equipping an addition to Woodcliff Center for tennis center restroom/concessions; and developing and improving sites. | |||||||
East Grand Rapids Public Schools | 05/02/2006 | 1 | URS Greiner | Passed | 1,649/834 | $15,645,000 | |
| Erecting, furnishing and equipping an addition or additions to and/or partially remodeling, furnishing and refurnishing, equipping and re-equipping existing school facilities; acquiring and installing educational technology; and developing and improving sites. | |||||||
East Grand Rapids Public Schools | 05/02/2006 | 2 | URS Greiner | Passed | 1,356/1,130 | $3,460,000 | |
| Acquiring and installing air conditioning and related improvements to existing school facilities. | |||||||
East Grand Rapids Public Schools | 05/02/2006 | 3 | URS Greiner | Failed | 1,153/1,316 | $10,180,000 | |
| Constructing, furnishing and equipping improvements to the High School stadium/Memorial Field; erecting, furnishing and equipping an addition to the High School to include an auxiliary gym and a fitness center; constructing, furnishing and equipping a separate facility to include team rooms, concessions and restrooms; and developing and improving sites. | |||||||
East Grand Rapids Public Schools | 11/02/1999 | 1 | URS Greiner | Passed | 3,129/970 | $15,565,000 | |
| Erecting, furnishing and equipping additions to, including a swimming pool expansion, and partially remodeling, refurnishing and re-equipping the East Grand Rapids High School; and developing and improving the site; erecting, furnishing and equipping an addition to and/or partially remodeling, refurnishing and re-equipping the Breton Downs, Lakeside and Wealthy Elementary Schools and the East Grand Rapids Middle School; and developing and improving the sites; and acquiring and installing educational technology. | |||||||
East Grand Rapids Public Schools | 11/02/1999 | 2 | URS Greiner | Passed | 2,833/1,262 | $7,845,000 | |
| Erecting, furnishing and equipping a performing arts center as an addition to the East Grand Rapids High School; and developing and improving the site. | |||||||
East Grand Rapids Public Schools | 11/02/1999 | 3 | URS Greiner | Passed | 2,132/1,927 | $3,800,000 | |
| Erecting, furnishing and equipping a mechanical room addition to and partially remodeling, refurnishing and re-equipping the Woodcliff facility; acquiring and installing educational technology; improving the playground; and developing and improving the site. | |||||||
East Grand Rapids Public Schools | 11/02/1999 | 4 | URS Greiner | Passed | 2,475/1,605 | $305,000 | |
| Constructing two additional lanes as a part of the proposed swimming pool expansion. | |||||||
Godfrey-Lee Public Schools | 11/03/2020 | 1 | Tower Pinkster | Passed | 1,505/730 | $17,790,000 | |
| Erecting, completing, remodeling, or equipping or reequipping school buildings or other facilities, or parts of or additions to those facilities; furnishing or refurnishing school buildings; acquiring, installing, or equipping or reequipping school buildings for instructional technology; and preparing, developing, or improving sites, or parts of or additions to sites, for school buildings or other facilities. | |||||||
Godfrey-Lee Public Schools | 02/24/2009 | 1 | Tower, etal | Passed | 87/64 | $875,000 | |
| Constructing, furnishing and equipping a new 5th and 6th grade building; acquiring, installing and equipping technology for the building and developing and improving the site. | |||||||
Godfrey-Lee Public Schools | 11/08/2005 | 1 | Tower-G | Passed | 378/219 | $3,325,000 | |
| Erecting, furnishing and equipping an addition to and partially remodeling, furnishing and equipping the Early Childhood Center; partially remodeling, furnishing and refurnishing, equipping and re-equipping the existing Alternative Education building for Central Administration purposes; acquiring and installing bleachers at the High School; erecting, furnishing and equipping an Alternative Education facility and storage buildings for the athletic complex; acquiring, installing and equipping technology and security systems for school facilities; acquiring school buses; and developing and improving sites. The estimated millage that will be levied for the proposed bonds in 2006, under current law, is -0- mill ($0.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.56 mills ($1.56 on each $1,000 of taxable valuation). | |||||||
Godfrey-Lee Public Schools | 05/12/1997 | 1 | Beta Design | Passed | 225/182 | $14,375,000 | |
| null | |||||||
Godwin Heights Public Schools | 05/06/2008 | 1 | Progressive AE | Passed | 250/188 | $6,560,000 | |
| Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for instructional purposes in school facilities; purchasing school buses, constructing, equipping, developing and improving athletic/physical education fields, facilities and playgrounds; and developing and improving sites. | |||||||
Godwin Heights Public Schools | 03/20/2000 | 1 | Progressive | Passed | 428/313 | $14,465,000 | |
| Erecting an addition or additions to and/or partially remodeling the North, South and West Godwin elementary schools; partially remodeling the Middle School and the High School; developing and improving sites; and developing and improving outdoor physical education facilities and athletic fields and constructing restroom/storage/concession facilities at the High School athletic fields. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed fifteen (15) years. The estimated millage that will be levied for the proposed bonds in the year 2000 is 2.26 mills ($2.26 per $1,000 of taxable valuation). The total millage that will be levied for all debt for the year 2000 will be 3.15 mills ($3.15 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire all debt is 2.55 mills ($2.55 per $1,000 of taxable valuation). | |||||||
Godwin Heights Public Schools | 06/14/1999 | 1 | Progressive | Failed | 290/303 | $15,085,000 | |
| Erecting an addition or additions to and/or partially remodeling the North, South, and West Elementary School; partially remodeling the Middle School and the High School; erecting furnishing, and equipping a Learning Center; developing and improving sites, outdoor physical education facilities and athletic fields, and constructing a new restroom/storage facility at the High School athletic field. | |||||||
Godwin Heights Public Schools | 09/15/1998 | 1 | Progressive | Failed | 196/223 | $14,490,000 | |
| Erecting an addition or additions to and/or partially remodeling the North, South and West Elementary Schools; partially remodeling the Middle School; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the High School; developing and improving sites, outdoor physical education facilities and athletic fields, and constructing a new restroom/storage facility at the High School athletic field. | |||||||
Grand Rapids Public Schools | 03/31/1998 | 1 | Etal | Failed | 14,131/23,534 | $396,000,000 | |
| Purchasing, erecting, completing, remodeling, and equipping or reequipping school buildings, including structures, athletic fields, playgrounds and other facilities, and parts of or additions to those facilities; furnishing or refurnishing new and remodeled school buildings and aditions; acquiring, preparing, developing or improving sites, or parts of or additions tosites, for school buildings, including structures, athletic fields, playgrounds and other facilities; acquiring, installing, and equipping or reequipping school buildings for technology. | |||||||
Kelloggsville Public Schools | 06/08/1998 | 1 | Design Forum | Passed | 344/211 | $11,965,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and re-furnishing, equipping and re-equipping existing school facilities; acquiring, installing and equipping technology for school facilities; constructing, improving and equipping athletic and physical education fields and facilities, and developing and improving sites. | |||||||
Kenowa Hills Public Schools | 05/07/2024 | 1 | GMB | Passed | 2,149/1,787 | $37,080,000 | |
| Acquiring, erecting, remodeling, and equipping and re-equipping school buildings and facilities, and additions to school buildings and facilities; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and acquiring, preparing, developing, improving and equipping athletic fields, play fields, structures, facilities and sites. | |||||||
Kenowa Hills Public Schools | 05/05/2020 | 1 | GMB | Passed | 2,845/2,529 | $67,000,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping playgrounds and sites. | |||||||
Kenowa Hills Public Schools | 05/03/2016 | 1 | GMB | Passed | 2,799/1,723 | $55,240,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and acquiring, preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | |||||||
Kenowa Hills Public Schools | 11/03/2015 | 1 | GMB | Failed | 1,818/1,843 | $55,240,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and acquiring, preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | |||||||
Kenowa Hills Public Schools | 05/05/2015 | 1 | GMB | Failed | 2,004/3,304 | $78,640,000 | |
| Erecting, furnishing and equipping a new early childhood building; erecting, furnishing and equipping additions to school buildings; remodeling, equipping or re-equipping and furnishing or refurnishing school buildings; acquiring, installing, equipping or re-equipping school buildings for instructional technology; purchasing school buses; and acquiring, preparing, developing, improving, and equipping playgrounds, play fields, athletic facilities, and sites. | |||||||
Kenowa Hills Public Schools | 05/04/2010 | 1 | Tower Pinkster | Passed | 1,530/1,209 | $14,325,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology system improvements and purchasing school buses; and developing and improving playgrounds, play fields, athletic fields and facilities and sites. | |||||||
Kenowa Hills Public Schools | 12/07/2002 | 1 | Beta Design | Failed | 1,273/1,779 | $26,975,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring land for site purposes; and developing and improving playgrounds, outdoor physical education and athletic facilities and sites. The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2003 is 1.93 mills ($1.93 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.17 mills ($1.17 on each $1,000 of taxable valuation). | |||||||
Kenowa Hills Public Schools | 04/20/1996 | 1 | Beta Design | Passed | 2,335/1,481 | $14,500,000 | |
| null | |||||||
Kenowa Hills Public Schools | 04/20/1996 | 2 | Beta Design | Passed | 1,939/1,873 | $30,985,000 | |
| null | |||||||
Kent City Community Schools | 11/05/2019 | 1 | Progressive AE | Passed | 582/379 | $21,900,000 | |
| Erecting, furnishing and equipping additions to school buildings, including for secure entrances; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; acquiring, installing, and equipping or re-equipping school buildings for instructional technology; purchasing school buses; erecting and furnishing a new athletic storage building; and preparing, equipping, developing and improving playgrounds, play fields, athletic facilities and sites. | |||||||
Kent City Community Schools | 09/24/2001 | 1 | Clark,Walter,etal | Passed | 596/411 | $18,150,000 | |
| Erecting, furnishing and equipping a new middle school, connecting additions to existing school buildings and a new bus garage; partially remodeling, refurnishing and re-equipping school buildings, and acquiring and installing educational technology improvements; and developing and improving sites and improving existing athletic facilities. It is expected that the bonds will be outstanding for a period of not more than 30 years, exclusive of refunding. The estimated millage that will be levied for the proposed bonds in the year 2001 is 1.25 mills ($1.25 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 5.97 mills ($5.97 per $1,000 of taxable valuation). | |||||||
Kent City Community Schools | 06/09/1997 | 1 | Clark,Walter,etal | Passed | 679/462 | $7,690,000 | |
| null | |||||||
Lowell Area Schools | 05/07/2024 | 1 | Tower Pinkster | Passed | 2,254/1,516 | $104,150,000 | |
| Erecting, completing, remodeling, and equipping and re-equipping school buildings and facilities, and additions to school buildings and facilities; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites. | |||||||
Lowell Area Schools | 05/07/2019 | 1 | Tower Pinkster | Passed | 2,283/1,099 | $52,095,000 | |
| Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing and equipping and re-equipping school district facilities; acquiring, installing and equipping and re-equipping school district facilities for instructional technology; erecting, preparing, developing, improving and equipping athletic fields, structures, playgrounds, play fields and other facilities; and developing and improving sites including, without limitation, driveways, parking lots and sidewalks. | |||||||
Lowell Area Schools | 09/26/2000 | 1 | Beta Design | Passed | 1,671/1,106 | $27,505,000 | |
| Erecting, furnishing and equipping two new elementary school buildings and additions to existing school buildings; partially remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; acquiring additional land for site purposes; developing and improving playgrounds, play fields, athletic facilities and sites. The following is for information purposes: The bonds are expected to be outstanding for a maximum of 30 years, exclusive of refunding. The estimated millage rate for the first year is 1.56 mill ($1.56 for each $1,000 of taxable valuation) and the estimated simple average annual debt millage rate for the repayment of this bond issue is 2.38 mills ($2.38 for each $1,000 of taxable valuation). | |||||||
Northview Public School District | 05/08/2012 | 1 | Tower Pinkster | Passed | 2,095/1,769 | $11,910,000 | |
| Erecting additions to the high school; remodeling, equipping and re-equipping and furnishing and refurnishing the high school; acquiring, installing, equipping and re-equipping the high school for instructiomal technology; and developing and improving sites. | |||||||
Northview Public School District | 11/08/2011 | 1 | Tower Pinkster | Passed | 1,732/1,697 | $31,610,000 | |
| Erecting additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing and improving playgrounds and sites. | |||||||
Northview Public School District | 11/08/2011 | 2 | Tower Pinkster | Failed | 1,712/1,714 | $11,910,000 | |
| Erecting additions to the high school; remodeling, equipping and re-equipping and furnishing and refurnishing the high school; acquiring, installing, equipping and re-equipping the high school for instructional technology; and developing and improving the site. | |||||||
Northview Public School District | 02/20/1996 | 1 | Kingscott | Passed | 1,912/1,054 | $29,585,000 | |
| null | |||||||
Rockford Public Schools | 05/07/2019 | 1 | GMB | Passed | 3,498/2,023 | $174,000,000 | |
| Erecting, furnishing, and equipping a new elementary school building; erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; acquiring, installing, equipping or re-equipping school buildings for instructional technology; purchasing school buses; and acquiring, preparing, erecting, developing, improving, and equipping playgrounds, play fields, athletic fields and facilities, and sites. | |||||||
Rockford Public Schools | 05/06/2014 | 1 | GMB | Passed | 3,473/1,646 | $76,125,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and acquiring, developing and improving playgrounds, athletic fields and facilities and sites. | |||||||
Rockford Public Schools | 05/06/2008 | 1 | Design Plus | Passed | 3,177/2,562 | $45,805,000 | |
| Erecting, furnishing and equipping additions to school facilities; partially remodeling furnishing and refurnishing, equipping and reequipping school facilities; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving community recreation, physical education and athletic facilities, playfields and play areas; purchasing school buses; and developing and improving sites. | |||||||
Rockford Public Schools | 06/09/1997 | 1 | URS Greiner | Passed | 2,954/1,896 | $66,500,000 | |
| null | |||||||
Sparta Area Schools | 05/03/2016 | 1 | GMB | Passed | 1,130/1,063 | $58,620,000 | |
| Erecting, furnishing and equipping a new middle school; erecting, furnishing and equipping secure entry additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds, playfields, athletic fields and facilities and sites. | |||||||
Sparta Area Schools | 06/14/2004 | 1 | Beta Design | Passed | 1,099/972 | $34,950,000 | |
| Erecting, furnishing and equipping a new senior high school and an addition to the Ridgeview School; remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology system improvements; acquiring land for site purposes and developing and improving playgrounds, playfields and sites? The estimated millage that will be levied for the proposed bonds in 2004, under current law, is 4.11 mills ($4.11 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.74 mills ($4.74 on each $1,000 of taxable valuation). | |||||||
Wyoming Public Schools | 09/23/1997 | 1 | Beta Design | Passed | 1,838/1,352 | $40,825,000 | |
| null | |||||||