STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
MACOMB COUNTY
Chippewa Valley Schools

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

11/06/2018

1

Wakely 

Passed 

25,702/18,382

$97,000,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings and other facilities for security, student safety, energy conservation and other purposes; acquiring and installing instructional technology equipment and infrastructure in school buildings and other facilities; and; preparing, developing and improving sites at school buildings, playgrounds, athletic fields and other facilities and the purchase of school buses.
 

05/02/2017

1

Wakely 

Failed 

5,753/8,128

$89,950,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, playgrounds, athletic fields and other facilities to enhance safety and security and for other purposes; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings, playgrounds, athletic fields and other facilities and the purchase of school buses.
 

02/23/2010

1

Wakely 

Passed 

5,886/4,150

$89,765,000

Partially remodeling, refunishing and re-equipping and erecting, furnishing and equipping additions to school district buildings; acquiring and installing educational technology system improvements; acquiring school buses; and developing and improving sites, athletic fields and facilities, playfields and playgrounds.
 

12/11/2004

1

Etal 

Passed 

3,976/969

$168,400,000

erecting, furnishing and equipping a new elementary school, a new middle school, a ninth-grade building at the Dakota site and a pre-school building; erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings, including the installation of educational technology improvements; acquiring school buses and land for site purposes; and developing and improving playgrounds, playfields, athletic fields and facilities and sites? The following is for informational purposes only: The estimated millage that will be levied for the proposed bonds in 2005, under current law, is -0- mill ($0.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.88 mills ($1.88 on each $1,000 of taxable valuation).
 

02/10/2001

1

Archit To Be Named 

Passed 

2,582/523

$104,080,000

erecting, furnishing and equipping a new elementary school and additions to existing school buildings; remodeling, refurnishing and re-equipping existing school buildings; acquiring and installing educational technology improvements; acquiring land for site purposes; purchasing school buses; and developing and improving playgrounds, playfields, outdoor physical education and athletic fields and facilities, and sites. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated millage that will be levied for the proposed bonds in the year 2001 is -0- mills ($-0- per $1,000 of taxable valuation) since the existing millage rate of 7.65 mills required by the School Bond Loan Act will be continued. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.73 mills ($1.73 per $1,000 of taxable valuation). The estimated maximum millage rate for the proposed issue is anticipated to be 5.57 mills ($5.57 per $1,000 of taxable valuation).
 

12/13/1997

1

Fanning & Howey 

Passed 

2,935/1,262

$83,410,000

null
 

Michigan.gov Home |  Contact Treasury  |  State Web Sites  |  FAQ  |  Sitemap
Privacy Policy  |  Link Policy  |  Accessibility Policy  |  Security Policy
Copyright © 2001-2010 State of Michigan