Montabella Community Schools
|
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
05/08/2018 | 1 | Tower Pinkster | Passed | 606/396 | $21,415,000 | |
| Erecting, furnishing and equipping additions to school buildings; remodeling, including security improvements, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and equipping, developing and improving playgrounds, play fields, athletic fields, parking areas, driveways and sites. | ||||||
05/03/2005 | 1 | GMB | Failed | 705/855 | $12,960,000 | |
| Erecting, furnishing and equipping a new elementary school on the central site; acquiring and installing educational technology improvements; developing and improving playgrounds and the site therefor? The estimated millage that will be levied for the proposed bonds in 2005, under current law, is 1.77 mills ($1.77 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.57 mills ($3.57 on each $1,000 of taxable valuation). | ||||||
09/27/2004 | 1 | GMB | Failed | 712/782 | $14,125,000 | |
| erecting, furnishing and equipping a new elementary school, acquiring and installing educational technology improvements, and developing and improving playgrounds, playfields, the athletic fields and facilities and sites? The estimated millage that will be levied for the proposed bonds in 2004, under current law, is 2.68 mills ($2.68 on each $1,000 of taxable valuation) for a net increase of .25 mill ($0.25 on each $1,000 of taxable valuation) over the 2003 debt levy of 6.75 mills ($6.75 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.25 mills ($4.25 on each $1,000 of taxable valuation). | ||||||
03/22/2004 | 1 | GMB | Failed | 506/595 | $14,125,000 | |
| Erecting, furnishing and equipping a new elementary school, acquiring and installing educational technology equipment, and developing and improving playgrounds, playfields, the athletic complex and site. The estimated millage that will be levied for the proposed bonds in 2004, under current law, is 3.31 mills ($3.31 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.16 mills ($4.16 on each $1,000 of taxable valuation). The total debt levy for 2004 is estimated to be 7.00 mills ($7.00 on each $1,000 of taxable valuation), or a net increase from 2003 of .25 mill ($0.25 on each $1,000 of taxable valuation). | ||||||
06/14/1999 | 1 | GMB | Passed | 680/513 | $10,550,000 | |
| Erecting, furnishing and equipping a new middle school; partially remodeling, refurnishing and re-equipping school buildings, including for educational technology improvements; developing and improving playfields, a running track and field and sites. | ||||||
09/22/1998 | 1 | Wakely-M | Failed | 619/625 | $8,270,000 | |
| Erecting, furnishing and equipping a new middle school as an addition to the high school and remodeling, re-equipping and re-furnishing school facilities in part for acquiring and installing educational technology improvements and developing and improving outdoor physical education fields and sites. | ||||||
09/22/1998 | 2 | Wakely-M | Failed | 480/672 | $7,750,000 | |
| erecting, furnishing and equipping a new elementary school at the high school site, acquiring and installing educational technology improvements and developing and improving playgrounds and the site. | ||||||
09/22/1998 | 3 | Wakely-M | Failed | 506/712 | $1,130,000 | |
| constructing new athletic complex facilities at the high school site. | ||||||
09/23/1997 | 1 | Wakely-M | Failed | 659/746 | $16,245,000 | |
| null | ||||||
09/23/1997 | 2 | Wakely-M | Failed | 598/791 | $780,000 | |
| null | ||||||
Michigan.gov Home
| Contact Treasury | State Web
Sites | FAQ | Sitemap
Privacy Policy | Link Policy | Accessibility
Policy | Security
Policy
Copyright © 2001-2010 State of Michigan