STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
OSCEOLA COUNTY

School
District

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

Evart Public Schools

11/03/2015

1

Kingscott 

Passed 

550/523

$8,400,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; remodeling, equipping and re-equipping the transportation building; improving, equipping and re-equipping an elementary school playground; and developing and improving sites.
 

Marion Public Schools

08/03/2021

1

BMA Architects P.C. 

Passed 

193/168

$4,700,000

Remodeling, equipping, and re-equipping school buildings; and preparing, developing, and improving sites.
 

Marion Public Schools

05/03/2016

1

Kingscott 

Passed 

275/259

$2,730,000

Acquiring, installing and equipping instructional technology for school facilities; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, equipping, developing and improving athletic facilities; purchasing and equipping school buses; and developing and improving sites.
 

Marion Public Schools

05/05/2015

1

Kingscott 

Failed 

353/433

$5,200,000

Acquiring, installing and equipping instructional technology for school facilities; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing; equipping, developing and improving athletic facilities; purchasing and equipping school buses; and developing and improving sites.
 

Marion Public Schools

06/12/2000

1

Birtles, etal 

Passed 

343/201

$1,675,000

Erecting, furnishing and equipping outdoor athletic/physical education fields and facilities for, and a weight/exercise room addition to, the Middle School/High School and developing and improving the site. The following is for informational purposes only: It is expected that the bonds will be outstanding for a maximum of 20 years, exclusive of refunding. The estimated millage rate is 1.40 mills ($1.40 for each $1,000 of valuation) in the first year, 2000, and over the repayment period of the bond issue has an estimated simple average annual millage rate of 1.31 mills ($1.31 for each $1,000 of valuation).
 

Pine River Area Schools

08/06/2024

1

Integrated Designs, Inc. 

Passed 

1,056/768

$4,500,000

Remodeling, equipping, and re-equipping school buildings, including for heating, ventilation, and air conditioning improvements; acquiring, installing, equipping, and re-equipping school buildings for instructional technology; and developing, improving, and equipping athletic facilities and the middle/high school site, including a wastewater treatment system replacement.
 

Pine River Area Schools

08/04/2020

1

Anthony Essen 

Passed 

1,420/1,046

$3,900,000

Erecting, furnishing and equipping an addition to the elementary school building; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; and preparing, erecting, developing and improving playgrounds, athletic fields and facilities and sites.
 

Pine River Area Schools

05/03/2016

1

Anthony Essen 

Passed 

857/551

$5,835,000

Erecting, furnishing and equipping additions to school buildings, including secure entries; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings, including reroofing; acquiring, installing, equipping or re-equipping the elementary school building for instructional technology; and preparing, developing, improving and equipping playgrounds, athletic fields, athletic facilities and sites.
 

Reed City Area Public Schools

11/04/2025

1

Tower Pinkster 

Failed 

400/1,310

$75,500,000

Erecting an addition to Reed City Middle and High School; remodeling, equipping, re-equipping, furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, structures, facilities and sites.
 

Reed City Area Public Schools

05/06/2025

1

Tower Pinkster 

Failed 

804/1,960

$88,100,000

Erecting an addition to Reed City Middle and High School; remodeling, equipping, re-equipping, furnishing and refurnishing school buildings and facilities; purchasing school buses; acquiring, installing, equipping and re-equipping instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, structures, facilities and sites.
 

Reed City Area Public Schools

03/24/2004

1

Fanning & Howey 

Passed 

1,070/1,032

$12,560,000

Erecting, furnishing and equipping an addition to and partially remodeling, refurnishing and re-equipping the Norman Elementary School to replace the Upper Elementary School; providing improvements to the Norman Elementary School playground; erecting, furnishing and equipping an addition to and partially remodeling, refurnishing and re-equipping the Reed City High School; acquiring and installing educational technology; developing and improving sites? The estimated millage that will be levied for the proposed bonds in 2004, is 2.63 mills ($2.63 on each $1,000 of taxable valuation) being a net increase of 1.93 mills ($1.93 on each $1,000 of taxable valuation) due to a reduction in existing debt levy. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.34 mills ($2.34 on each $1,000 of taxable valuation).
 

Reed City Area Public Schools

06/10/2002

1

Beta Design 

Failed 

714/1,363

$20,700,000

Erecting, furnishing and equipping a new upper elementary school; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Reed City High School; acquiring and installing educational technology; and developing and improving athletic fields, playgrounds and sites. The following is for information purposes only: The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.32 mills ($4.32 on each $1,000 of taxable valuation). The estimated millage that will be levied for the proposed bonds in the year 2002, under current law, is 5.78 mills ($5.78 on each $1,000 of taxable valuation) for a combined total debt levy of not to exceed 7 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years.
 

Reed City Area Public Schools

03/25/2002

1

Beta Design 

Failed 

1,344/1,560

$22,380,000

Erecting, furnishing and equipping a new high school; acquiring and installing educational technology; developing and improving outdoor physical education and athletic facilities and sites. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.96 mills ($3.96 on each $1,000 of taxable valuation). The estimated millage that will be levied for the proposed bonds in the year 2002, under current law, is 5.78 mills ($5.78 on each $1,000 of taxable valuation) for a combined total debt levy of not to exceed 7 mills ($7.00 on each $1,000 of taxable valuation) under current law. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years.
 

Reed City Area Public Schools

06/11/2001

1

Beta Design 

Failed 

1,024/1,306

$30,445,000

Erecting, furnishing and equipping a new high school; partially remodeling, refurnishing and re-equipping the existing high school for upper elementary purposes; acquiring and installing educational technology; constructing and equipping outdoor physical education fields, athletic fields and playgrounds; and developing and improving sites. The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated millage that will be levied for the proposed bonds in the year 2001 is 4.88 mills ($4.88 for $1,000 of taxable valuation) being an increase of 3.90 mills ($3.90 per $1,000 of taxable valuation) over last years debt levy. The estimated simply average annual millage anticipated to be required to retire this bond debt is 6.13 mills ($6.13 per $1,000 of taxable valuation).
 

Reed City Area Public Schools

06/14/1999

1

Beta Design 

Failed 

893/1,207

$28,025,000

Erecting, furnishing and equipping a new high school; partially remodeling, refurnishing and re-equipping the existing high school for middle school purposes; erecting, furnishing and equipping an addition to and partially remodeling, refurnishing and re-equipping the existing middle school for upper elementary school purposes; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Norman Elementary School; partially remodeling, refurnishing and re-equipping the upper elementary annex for community education purposes and constructing and equipping a new bus garage; acquiring and installing educational technology; developing and improving playground and outdoor physical education facilities and sites.
 

Reed City Area Public Schools

06/14/1999

2

Beta Design 

Failed 

772/1,313

$2,245,000

Erecting, furnishing and equipping an auditorium as an addition to the proposed new high school.
 

Reed City Area Public Schools

09/26/1998

2

Beta Design 

Failed 

632/1,278

$2,275,000

Erecting, furnishing and equipping an auditorium as an addition to the proposed new high school.
 

Reed City Area Public Schools

09/26/1998

7

Beta Design 

Failed 

753/1,158

$28,045,000

Erecting, furnishing and equipping a new high school; partially remodeling, refurnishing and re-equipping the existing high school for middle school purposes; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the existing middle school for upper elementary school purposes; erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Norman Elementary School and the Hersey Elementary School; partially remodeling, refurnishing and re-equipping the upper elementary annex and the alternative education building for community education purposes and constructing a new bus garage; acquiring and installing educational technology; developing and improving playground and outdoor physical education facilities and sites.
 