STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
SAGINAW COUNTY
Hemlock Public School District

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

05/03/2022

1

Tower Pinkster 

Passed 

1,023/937

$41,900,000

Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping playgrounds, play fields, athletic fields and facilities and sites.
 

05/07/2013

1

Integrated Designs 

Passed 

784/361

$8,400,000

Remodeling, equipping, and re-equipping and furnishing and refurnishing school district buildings; erecting an addition to the high school building; acquiring and installing instructional technology in school buildings; purchasing school buses; and developing, improving and equipping playgrounds, athletic facilities, athletic fields and sites.
 

09/17/2001

1

Wigen, etal 

Passed 

1,142/1,024

$13,355,000

Erecting, furnishing and equipping an addition or additions to and partially remodeling, refurnishing and re-equipping existing school facilities, in part for acquiring and installing educational technology; constructing a new playground and developing and improving outdoor athletic facilities and sites. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-one (21) years. The estimated millage that will be levied for the proposed bonds in the year 2001, is 3 mills ($3.00 per $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.68 mills ($2.68 per $1,000 of taxable valuation).
 

09/17/2001

2

Wigen, etal 

Failed 

985/1,143

$4,310,000

Erecting, furnishing and equipping an addition or additions to, and/or partially remodeling and refurnishing the K. C. Ling Elementary School, Hemlock Middle School and Hemlock High School; and developing the sites. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-one (21) years. The estimated millage that will be levied for the proposed bonds in the year 2001, is 1 mill ($1.00 per 41,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is .86 of a mill ($.86 per $1,000 of taxable valuation).
 

02/07/2000

1

Wigen, etal 

Failed 

1,121/1,190

$13,950,000

Erecting, furnishing and equipping an addition or additions to and partially remodeling, refurnishing and re-equipping existing school facilities, in part for acquiring and installing educational technology; constructing a new playground and developing and improving outdoor athletic facilities and sites.
 

06/14/1999

1

Wigen, etal 

Failed 

796/876

$12,975,000

Erecting, furnishing and equipping an addition or additions to and partially remodeling, refurnishing and re-equipping existing school facilities, in part for acquiring and installing educational technology; constructing a new playground and developing and improving sites.
 

Michigan.gov Home |  Contact Treasury  |  State Web Sites  |  FAQ  |  Sitemap
Privacy Policy  |  Link Policy  |  Accessibility Policy  |  Security Policy
Copyright © 2001-2010 State of Michigan