STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
SAINT JOSEPH COUNT
Colon Community School District

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

08/05/2025

1

InForm Architecture 

Failed 

334/380

$14,000,000

Acquiring, installing, equipping and re-equipping school buildings for instructional technology; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings and facilities; erecting, furnishing, and equipping a new gymnasium; and preparing, developing, improving, and equipping playgrounds and sites.
 

09/14/2010

1

C2AE 

Passed 

681/475

$8,000,000

Remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities, playgrounds and sites.
 

09/14/2010

2

C2AE 

Passed 

580/566

$7,000,000

Additional remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities and sites.
 

11/03/2009

1

C2AE 

Failed 

498/670

$23,105,000

Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping the middle/high school to accommodate a pre K-12 program; acquiring and installing educational technology improvements and developing and improving playgrounds and the site.
 

06/14/2004

1

Design Works 

Failed 

423/676

$20,090,000

Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring a portion of the Goodell Street right-of-way; and developing and improving sites, playgrounds and outdoor physical education fields? The estimated millage that will be levied for the proposed bonds in 2004 is 7 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.71 mills ($6.71 on each $1,000 of taxable valuation).
 

12/08/2003

1

Design Works 

Failed 

483/555

$20,655,000

Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring a portion of the Goodell Street right-of-way; and developing and improving sites, playgrounds and outdoor physical education fields. The estimated millage that will be levied for the proposed bonds in 2003, is 7.0 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.84 mills ($6.84 on each $1,000 of taxable valuation).
 

09/23/1997

1

Trend 

Failed 

244/756

$14,465,000

null
 

Michigan.gov Home |  Contact Treasury  |  State Web Sites  |  FAQ  |  Sitemap
Privacy Policy  |  Link Policy  |  Accessibility Policy  |  Security Policy
Copyright © 2001-2010 State of Michigan