STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
SAINT JOSEPH COUNT
Colon Community School District
|
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
08/05/2025 | 1 | InForm Architecture | Failed | 334/380 | $14,000,000 | |
| Acquiring, installing, equipping and re-equipping school buildings for instructional technology; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings and facilities; erecting, furnishing, and equipping a new gymnasium; and preparing, developing, improving, and equipping playgrounds and sites. | ||||||
09/14/2010 | 1 | C2AE | Passed | 681/475 | $8,000,000 | |
| Remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities, playgrounds and sites. | ||||||
09/14/2010 | 2 | C2AE | Passed | 580/566 | $7,000,000 | |
| Additional remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities and sites. | ||||||
11/03/2009 | 1 | C2AE | Failed | 498/670 | $23,105,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping the middle/high school to accommodate a pre K-12 program; acquiring and installing educational technology improvements and developing and improving playgrounds and the site. | ||||||
06/14/2004 | 1 | Design Works | Failed | 423/676 | $20,090,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring a portion of the Goodell Street right-of-way; and developing and improving sites, playgrounds and outdoor physical education fields? The estimated millage that will be levied for the proposed bonds in 2004 is 7 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.71 mills ($6.71 on each $1,000 of taxable valuation). | ||||||
12/08/2003 | 1 | Design Works | Failed | 483/555 | $20,655,000 | |
| Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring a portion of the Goodell Street right-of-way; and developing and improving sites, playgrounds and outdoor physical education fields. The estimated millage that will be levied for the proposed bonds in 2003, is 7.0 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 6.84 mills ($6.84 on each $1,000 of taxable valuation). | ||||||
09/23/1997 | 1 | Trend | Failed | 244/756 | $14,465,000 | |
| null | ||||||
Michigan.gov Home
| Contact Treasury | State Web
Sites | FAQ | Sitemap
Privacy Policy | Link Policy | Accessibility
Policy | Security
Policy
Copyright © 2001-2010 State of Michigan