05/02/2023

1

GMB 

Passed 

371/332

$7,250,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; and equipping, preparing, developing, and improving playgrounds, parking areas, and sites.
 

05/03/2022

1

GMB 

Failed 

257/529

$41,540,000

Erecting, furnishing, and equipping an auditorium addition and a new transportation facility; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology in school buildings; and erecting, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, parking areas, driveways, and sites.
 

05/08/2012

1

C2AE 

Passed 

441/426

$8,480,000

Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving athletic facilities; and developing and improving sites.
 

11/08/2011

1

C2AE 

Failed 

359/421

$8,480,000

Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving athletic facilities; and developing and improving sites.
 

02/24/2009

1

C2AE 

Failed 

335/565

$11,965,000

Partially remodeling, furnishing and refurnishing, equipping and re-equipping the Bangor Primary Building and the Middle/High School; constructing additional lecture space for the existing science labs at the High School; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving athletic/physical education facilities and play fields and improving a playground; and developing and improving sites.
 

03/09/2004

1

Design Works 

Passed 

628/526

$7,910,000

Erecting, furnishing and equipping additions to and remodeling, furnishing and re-furnishing, equipping and re-equipping South Walnut Elementary School; acquiring, installing and equipping technology for the elementary school; constructing, equipping, developing and improving a playground and an outdoor physical education/soccer field at the elementary school; and developing and improving the site. The estimated millage that will be levied for the proposed bonds in 2004, under current law, is 3.70 mills ($3.70 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-five (25) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.93 mills ($2,93 on each $1,000 of taxable valuation).
 

06/09/2003

1

Design Works 

Failed 

411/421

$7,880,000

Erecting, furnishing and equipping additions to and remodeling, furnishing and re-furnishing, equipping and re-equipping South Walnut Elementary School; acquiring, installing and equipping technology for the elementary school; constructing, equipping, developing and improving a playground and an outdoor physical education/soccer field at the elementary school; and developing and improving the sites at the Primary Building, Early Childhood Center and South Walnut Elementary School? The estimated millage that will be levied for the proposed bonds in 2003, under current law, is 3.75 mills ($3.75 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed twenty-six (26) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 2.99 mills ($2.99 on each $1,000 of taxable valuation).
 

06/10/2002

1

Design Works 

Failed 

452/614

$14,175,000

Erecting, furnishing and equipping a new elementary school building; acquiring, installing, and equipping technology and constructing and equipping playgrounds and playfields for the new elementary school; enclosing the remaining center-based wing of the existing elementary school; and developing and improving the sites. The following is for information purposes only: The estimated millage that will be levied for the proposed bonds in 2002, under current law, is 7 mills ($7.00 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.98 mills ($4.98 on each $1,000 of taxable valuation).
 

03/27/2001

1

Design Works 

Failed 

435/488

$10,345,000

Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and re-furnishing, equipping and re-equipping South Walnut Elementary School; acquiring, installing and equipping technology for the school; constructing, developing and equipping playfields and playgrounds at the school; and developing and improving the site. The bonds are expected to be outstanding for a maximum of 26 years, exclusive of refunding. The estimated millage rate that will be levied for the proposed bonds in the year 2001 is 5.33 mills ($5.33 for each $1,000 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue is 4.83 mills ($4.83 for each $1,000 of taxable valuation).
 

09/25/2000

1

Design Works 

Failed 

330/360

$8,550,000

Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and re-furnishing, equipping and re-equipping South Walnut Elementary School; acquiring, installing and equipping technology for the school; constructing, developing and equipping playgrounds at the school; and developing and improving the site. The bonds are expected to be outstanding for a maximum of 23 years, exclusive of refunding. The estimated millage rate for this debt the first year is 4.83 mills ($4.83 for each $1,000 of taxable valuation). The estimated simple average annual debt millage rate for the repayment of this bond issue if 4.71 mills ($4.71 for each $1,000 of taxable valuation).
 

09/29/1999

1

Vanwienen 

Failed 

410/596

$14,940,000

Erecting, furnishing and equipping additions to, and partially remodeling, refurnishing, and re-equipping Bangor Public Schools buildings; acquiring, installing, and equipping technology for school facilities; and constructing and improving school playgrounds and developing and improving the sites.
 

03/29/1999

1

Vanwienen 

Failed 

365/462

$13,980,000

Erecting, furnishing and equipping additions to, and partially remodeling, refurnishing, and re-equipping Bangor Public Schools buildings; cquiring, installing, and equipping technology for school facilities; and onstructing and improving school playgrounds and developing and improving the sites.
 

06/08/1998

1

Vanwienen 

Failed 

271/371

$13,550,000

Erecting, furnishing and equipping additions to, and partially remodeling, refurnishing, and re-equipping existing school facilities and constructing and improving school playgrounds; acquiring, installing, and equipping technology for existing school facilities and the new early childhood education center; erecting, furnishing and equipping an early childhood education center; and developing and improving the sites.
 