STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
WAYNE COUNTY
Allen Park Public Schools
|
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
05/04/2021 | 1 | French | Passed | 3,221/951 | $74,215,000 | |
| Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and other facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; erecting a storage building; and erecting, equipping, preparing, developing, and improving running tracks, athletic fields and facilities, playgrounds, parking areas, and sites. | ||||||
03/17/2003 | 1 | French | Passed | 3,248/1,737 | $62,475,000 | |
| Erecting, equipping and furnishing additions to elementary, middle school, and high school buildings and other facilities; remodeling, equipping, re-equipping, furnishing and refurnishing elementary, middle school and high school buildings, other facilities and playgrounds; erecting, equipping and furnishing other facilities; preparing, developing and improving sites for school buildings, additions to school buildings and other facilities; acquiring, installing, equipping and re-equipping school buildings and other facilities, for technology systems and equipment; and acquiring school buses. The maximum number of years the bonds may be outstanding, exclusive of refunding, is not more than thirty (30) years; the estimated millage that will be levied to pay the proposed bonds in the first year is 5.66 mills (which is equal to $5.66 per $1,000 of taxable value); and the estimated simple average annual millage that will be required to retire the bonds over twenty five (25) years is 6.22 mills annually ($6.22 per $1,000 of taxable value). If this School Improvement Bond Proposition 1 is combined with School Improvement Bond Proposal 2 and 3 it will be outstanding for a maximum of thirty (30) years; the estimated millage that will be levied to pay the combined proposed bonds in the first year is 5.76 mills (which is equal to $5.76 per $1,000 of taxable value); and the estimated average millage that will be required to retire the bonds over thirty (30) years is 6.69 mills annually ($6.69 per $1,000 of taxable value). | ||||||
03/17/2003 | 2 | French | Passed | 2,684/2,261 | $12,200,000 | |
| Erecting, equipping and furnishing an auditorium addition to the high school building; acquiring, preparing, developing and improving a site for an auditorium addition to the high school building and additional parking lot; and acquiring, installing, and equipping an auditorium addition for technology systems and equipment. The maximum number of years the bonds may be outstanding, exclusive of refunding, is not more than thirty (30) years; the estimated millage that will be levied to pay the proposed bonds in the first year is 1.32 mills (which is equal to $1.32 per $1,000 of taxable value); and the estimated simple average annual millage that will be required to retire the bonds over fifteen (15) years is 1.91 mills annually ($1.91 per $1,000 of taxable value). If this School Improvement Bond Proposition 2 is combined with School Improvement Bond Proposal 1 and 3 it will be outstanding for a maximum of thirty (30) years; the estimated millage that will be levied to pay the combined proposed bonds in the first year is 5.76 mills (which is equal to $5.76 per $1,000 of taxable value); and the estimated average millage that will be required to retire the bonds over thirty (30) years is 6.69 mills annually ($6.69 per $1,000 of taxable value). The Bonds authorized under this School Improvement Bond Proposition 2, if approved by the voters, will not be issued if the voters do not approve School Improvement Bond Proposition 1. | ||||||
03/17/2003 | 3 | French | Failed | 2,257/2,667 | $2,895,000 | |
| Erecting, equipping and furnishing a stadium team room, storage and public restroom building at the High School Athletic Field; acquiring and installing synthetic turf at the High School Athletic Field; erecting home and visitor grandstands, press box facility and filming platform facilities at the High School Athletic Field; preparing, developing and improving sites for the stadium team room, storage and public restroom building; the synthetic turf and the grandstands at the High School Athletic Field; and equipping the High School Athletic Field. The maximum number of years the bonds may be outstanding, exclusive of refunding, is not more than thirty (30) years; the estimated millage that will be levied to pay the proposed bonds in the first year is 0.34 mills (which is equal to $0.34 per $1,000 of taxable value); and the estimated simple average annual millage that will be required to retire the bonds over ten (10) years is 0.65 mills annually ($0.65 per $1,000 of taxable value). If this School Improvement Bond Proposition 3 is combined with School Improvement Bond Proposal 1 and 2 it will be outstanding for a maximum of thirty (30) years; the estimated millage that will be levied to pay the combined proposed bonds in the first year is 5.76 mills (which is equal to $5.76 per $1,000 of taxable value); and the estimated average millage that will be required to retire the bonds over thirty (30) years is 6.69 mills annually ($6.69 per $1,000 of taxable value). The Bonds authorized under this School Improvement Bond Proposition 3, if approved by the voters, will not be issued if the voters do not approve School Improvement Bond Proposition 1. | ||||||