BAY COUNTY | Bay City School District | 05/02/2006 | 1 | Wigen Tincknell Meyer & Associates | Passed | 6,277/6,223 | $66,875,000 | |
Remodeling all or portions of Central High School, Western High/Middle School, Handy Middle School and Kolb, Linsday, MacGregor, MacKensen, McAlear Sawden and Washington Elementary Schools; erecting, equipping and furnishing additions to Central High School, Western High/Middle School and Handy Middle School; and developing and improving the sites. | ||||||||
GENESEE COUNTY | Bentley Community School District | 05/02/2006 | 1 | None | Passed | 305/203 | $570,000 | |
acquiring school buses | ||||||||
OAKLAND COUNTY | Brandon School District | 05/02/2006 | 1 | French | Passed | 1,275/781 | $73,400,000 | |
Acquiring and installing technology infrastructure and equipment in and connecting School District buildings; remodeling existing School District buildings, including security, technology and mechanical upgrades; constructing, furnishing and equipping additions to School District buildings; equipping, furnishing, reequipping and/or refurnishing School District buildings, and acquiring school buses; constructing, furnishing and equipping a new elementary school; and acquiring, improving and developing sites, including playgrounds and outdoor athletic fields, facilities and structures in the School District. | ||||||||
LENAWEE COUNTY | Britton Deerfield Schools | 09/26/2006 | 1 | Dailey | Passed | 289/252 | $3,450,000 | |
Erecting, furnishing and equipping an addition to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping the Britton-Macon Area School building; acquiring and installing technology; and developing and improving the site. | ||||||||
GRAND TRAVERSE COU | Buckley Community Schools | 05/02/2006 | 1 | Beta Design | Passed | 343/177 | $3,320,000 | |
erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring , installing and equipping technology for school facilities; acquiring school buses; constructing, equipping, developing and improving athletic fields, facilities and playgrounds; and developing and improving the sites? | ||||||||
SAGINAW COUNTY | Chesaning Union Schools | 05/02/2006 | 1 | Wakely-B | Passed | 1,222/778 | $1,795,000 | |
remodeling and re-equipping the swimming pool, erecting an entry addition, and developing and improving the site? | ||||||||
BERRIEN COUNTY | Coloma Community Schools | 05/02/2006 | 1 | Tower-G | Failed | 911/2,166 | $39,980,000 | |
erecting, furnishing and equipping a new upper elementary school and acquiring a site therefor; erecting, furnishing and equipping additions to and/or partially remodeling, furnishing and refurnishing, equipping and re-equipping technology for the new upper elementary school and school facilities; constructing, equipping, developing and improving physcial education/athletic fields, facilities and playgrounds; and developing and improving sites. | ||||||||
OTTAWA COUNTY | Coopersville Area Public Schools | 05/02/2006 | 1 | URS Greiner | Passed | 1,145/1,142 | $41,550,000 | |
Erecting, furnishing and equipping a new middle school and additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring school buses and real property; and developing and improving athletic fields and facilities; playgrounds and sites. | ||||||||
WAYNE COUNTY | Crestwood School District | 11/07/2006 | 1 | TMP | Failed | 3,982/5,745 | $35,090,000 | |
erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping the high school; partially remodeling the middle school and the elementary schools; constructing, improving and equipping athletic fields and facilities; and developing and improving sites | ||||||||
SHIAWASSEE COUNTY | Durand Area Schools | 02/28/2006 | 1 | THA | Passed | 1,199/772 | $13,570,000 | |
partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, instealling and equipping technology for school facilities; acquiring school buses; constructing a pole barn for storage; constructing, improving and equipping outdoor physical education/athletic facilities, play firelds and playgrounds; and developing and improving sites? | ||||||||
KENT COUNTY | East Grand Rapids Public Schools | 05/02/2006 | 1 | URS Greiner | Passed | 1,649/834 | $15,645,000 | |
Erecting, furnishing and equipping an addition or additions to and/or partially remodeling, furnishing and refurnishing, equipping and re-equipping existing school facilities; acquiring and installing educational technology; and developing and improving sites. | ||||||||
KENT COUNTY | East Grand Rapids Public Schools | 05/02/2006 | 2 | URS Greiner | Passed | 1,356/1,130 | $3,460,000 | |
Acquiring and installing air conditioning and related improvements to existing school facilities. | ||||||||
KENT COUNTY | East Grand Rapids Public Schools | 05/02/2006 | 3 | URS Greiner | Failed | 1,153/1,316 | $10,180,000 | |
Constructing, furnishing and equipping improvements to the High School stadium/Memorial Field; erecting, furnishing and equipping an addition to the High School to include an auxiliary gym and a fitness center; constructing, furnishing and equipping a separate facility to include team rooms, concessions and restrooms; and developing and improving sites. | ||||||||
GENESEE COUNTY | Fenton Area Public Schools | 05/02/2006 | 1 | Beta Design | Passed | 1,655/1,053 | $24,520,000 | |
erecting, furnishing and equipping additions to the high school; remodeling, refurnishing and re-equipping school district building; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving playgrounds, athletic fields and facilites and sites? | ||||||||
GENESEE COUNTY | Fenton Area Public Schools | 05/02/2006 | 2 | Beta Design | Failed | 1,324/1,377 | $7,575,000 | |
erecting, furnishing and equipping and expanded pool and gymnasium addition to the high school including a community pool and elevated indoor track together with incidental remodeling and site improvements. | ||||||||
NEWAYGO COUNTY | Fremont Public School District | 02/28/2006 | 1 | Kingscott | Failed | 1,649/2,076 | $36,570,000 | |
erecting, equipping and furnishing additions to the high school building and acquiring, prepairing, developing and improving sites for additions to the high school building; remodeling, re-equipping, re-furnishing the high school building and prepairing, developing and improving sites at the high school building; and equipping and re-equipping the high school building for technology systems and equipment? | ||||||||
NEWAYGO COUNTY | Fremont Public School District | 02/28/2006 | 2 | Kingscott | Failed | 1,477/2,237 | $4,775,000 | |
erecting, equipping and furnishing a multi purpose swinning pool addition to the high school building; preparing, developing and improving a site for a multi purpose swimming pool addition to the high school building; and equipping a multi purpose swimming pool addition to the high school building for technology systems and equipment? | ||||||||
GRATIOT COUNTY | Fulton Schools | 05/02/2006 | 1 | Wakely-M | Failed | 444/736 | $19,300,000 | |
erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; and developing and improving athletic fields and facilities and sites? | ||||||||
KALAMAZOO COUNTY | Galesburg-Augusta Community Schools | 05/02/2006 | 1 | Kingscott | Failed | 699/1,005 | $3,310,000 | |
Constructing and equipping athletic fields and facilities and replacing the middle school roof. | ||||||||
KALAMAZOO COUNTY | Galesburg-Augusta Community Schools | 05/02/2006 | 2 | Kingscott | Failed | 606/1,079 | $2,120,000 | |
Erecting, furnishing and equipping an athletic facility building or addition, including minor associated remodeling to the high school, acquiring and installing educational technology improvements, and developing and improving the site. | ||||||||
KALAMAZOO COUNTY | Galesburg-Augusta Community Schools | 05/02/2006 | 3 | Kingscott | Failed | 602/1,079 | $5,870,000 | |
Erecting, furnishing and equipping an auditorium addition to the high school and expanding the band room, acquiring and installing educational technology improvements and developing and improving the site. | ||||||||
EATON COUNTY | Grand Ledge Public Schools | 05/02/2006 | 1 | GMB | Failed | 2,687/3,438 | $49,700,000 | |
acquiring, installing and equipping technology for school facilities; erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, equipping, developing and improving physical education/athletic fields and facilities; improving and equipping playgrounds; developing and improving sties; and acquiring school busses? | ||||||||
WAYNE COUNTY | Grosse Ile Township Schools | 05/02/2006 | 1 | French | Passed | 2,196/1,229 | $14,270,000 | |
constructing, furnishing and equipping additions and making related site improvements at Gross Ile High School; remodeling, equipping, furnishing, reequipping and refurnishing existing School District buildings, including accessibility improvements at Grosse Ile High School; acquiring and installing technology infrastructure and equipment in School District Buildings; and acquiring school buses? | ||||||||
LIVINGSTON CO | Hartland Consolidated Schools | 11/07/2006 | 1 | Archit To Be Named | Passed | 5,424/5,345 | $26,390,000 | |
partially remodeling, refurnishing and re-equipping school district buildings, erecting storage bujildings and kitchen additions, acquiring and installing educational technology improvements, purchasing school buses and real property, and developing and improving playgrounds, play fields, athletic fields and sites? | ||||||||
OAKLAND COUNTY | Holly Area School District | 05/02/2006 | 1 | Integrated Designs | Passed | 1,260/917 | $20,400,000 | |
erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; and developing and improving playgrounds and sites? | ||||||||
WAYNE COUNTY | Huron School District | 05/02/2006 | 1 | French | Failed | 847/1,031 | $65,000,000 | |
constructing, erecting, furnishing and equipping a new highschool, including equipping for technology and acquiring and installing technology therein and preparing, developing and improving a site therefor, including outdoor physical education and athletic fields and facilities; Constructing, ereicting, furnishing, and equipping, including equipping for technology and acquiring and installing technology therein, an addition or additions to and partially remodeling, refurnishing, and reequipping the existing high school for use as a junior high school, the existing junior high school for use as an elementary school, the existing Brown elementary school, the existing Miller elemenatry, and the existing Sunnyside Kindergarten Center, and the preparation, development and improvement of sites for those schools, including playgrounds; Constructing, erecting, furnishing and equipping and requipping, an addition or additions to and partially remodeling the existing maintenance and transportation facilities, including preparation, development and improvement of the sites for those facilities | ||||||||
IONIA COUNTY | Ionia Public Schools | 05/02/2006 | 1 | GMB | Passed | 1,006/586 | $13,640,000 | |
Partially remodeling, refurnishing and re-equipping school district buildings; replacing athletic field lighting; purchasing school buses; constructing storage buildings at the middle and high school; developing and improving sites; and acquiring and installing educational technology improvements. | ||||||||
IONIA COUNTY | Ionia Public Schools | 05/02/2006 | 2 | GMB | Passed | 806/784 | $3,030,000 | |
Developing and improving the athletic complex. | ||||||||
MARQUETTE COUNTY | Ishpeming Public School District | 05/02/2006 | 1 | STS Consultants | Passed | 762/416 | $1,040,000 | |
partially remodeling, equipping, constructing, developing and improving outdoor athletic fields and facilities; and developing and improving the site? | ||||||||
MISSAUKEE COUNTY | Lake City Area Schools | 05/02/2006 | 1 | Beta Design | Failed | 697/1,364 | $43,550,000 | |
erecting, furnishing and equipping additions for grades K-2 to and partially remodeling, furnishing and refurnishing, equipping and re-equipping the existing elementary school for grades 3-5 together with playgrounds and playfields; erecting, furnishing and equipping a new high school and related practice fields; erecting furnishing and equipping a new high school and related practice fields; erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping the middle school; acquiring and installing technology; constructing bus ports as an addition to the bus garage; and developing and improving sites? | ||||||||
MONTCALM COUNTY | Lakeview Community Schools (Montcalm) | 05/02/2006 | 1 | GMB | Passed | 531/524 | $2,020,000 | |
partially remodeling, refurnishing and re-equipping school district buildings, including educational technology improvments and schools buses, and developing and improving sites | ||||||||
LAPEER COUNTY | Lapeer Community Schools | 05/02/2006 | 1 | French | Failed | 3,668/5,946 | $112,075,000 | |
Erecting a new middle school building in the School District; remodeling and erecting additions to Zemmer Middle School; erecting additions to other existing School District buildings, including classrooms and gymnasiums at Lapeer East High School and Lapeer West High School and a performing arts center at Lapeer West High School; remodeling other existing School District buildings, including accessibility, safety and climate control improvements; equipping, furnishing, reequipping and refurnishing School District buildings and acquiring buses; acquiring and installing technology infrastructure and equipment in and connecting School District buildings; and improving and developing sites, including athletic fields, tennis courts, facilities and structures in the School District. | ||||||||
LAPEER COUNTY | Lapeer Community Schools | 05/02/2006 | 2 | French | Failed | 2,778/6,891 | $4,995,000 | |
Erecting, furnishing and equipping a new district athletic complex, including athletic fields, facilities and structures; and acquiring land and improving and developing the site therefor. | ||||||||
EATON COUNTY | Maple Valley Schools | 05/02/2006 | 1 | Kingscott | Failed | 212/861 | $11,555,000 | |
erecting, furnishing and equipping additions to the midle school/high school; remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements to the middle school/high school; and developing and improving the middle school/high school site | ||||||||
SANILAC COUNTY | Marlette Community Schools | 09/19/2006 | 1 | Wakely-B | Failed | 466/801 | $9,860,000 | |
erecting, furnishing and equipping additions to the elementary school and bus garage; partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements and developing and improving athletic fields, facilities and sites? | ||||||||
MASON COUNTY | Mason County Central Schools | 02/28/2006 | 1 | Design Plus | Passed | 973/930 | $16,935,000 | |
Erecting, furnishing and equipping a new elementary school and acquiring a site therefore; erecting, furnishing and equipping additions to the high school; partially remodeling, furnishing, refurnishing, equipping and re-equipping existing school buildings; acquiring, installing and equipping technology for the new elementary school and existing school buildings; constructing, equipping, developing and improving playgrounds; and developing and improving sites. | ||||||||
MIDLAND COUNTY | Meridian Public Schools | 09/26/2006 | 1 | TMP | Passed | 1,010/949 | $16,900,000 | |
erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; and developing and improving sites | ||||||||
MIDLAND COUNTY | Meridian Public Schools | 02/28/2006 | 1 | TMP | Failed | 806/1,110 | $25,280,000 | |
erecting, furnishing, and equipping additions to the high school and elementary school; partially remodleing, furnishing and refurnishing, equipping and re-equipping school buildings; acquiring, installing and eqiupping technology for school buildings; and developing and improving sites? | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 05/02/2006 | 1 | Hobbs & Black Associates | Failed | 181/252 | $10,170,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping the Morrice Elementary School; relocating the playground; erecting, furnishing and equipping an addition to, and remodeling, refurnishing and re-equipping the high school; acquiring and installing educational technology; developing and improving sites. | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 05/02/2006 | 2 | Hobbs & Black Associates | Failed | 178/252 | $1,475,000 | |
Constructing, furnishing and equipping a community athletic facility, to include lighting, football field, bleachers and track; developing and improving the site. | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 05/02/2006 | 3 | Hobbs & Black Associates | Failed | 197/231 | $335,000 | |
Purchasing school buses. | ||||||||
MARQUETTE COUNTY | Negaunee Public Schools | 11/07/2006 | 1 | Integrated Designs | Passed | 1,998/1,125 | $6,150,000 | |
Constructing, furnishing and equipping a classroom addition to the elementary school; constructing, furnishing and equipping an auxiliary gymnasium at the middle school; constructing, furnishing and equipping an expansion to the auditorium at the high school; remodeling, refurnishing and re-equipping existing school facilities; acquiring and installing educational technology; and developing and improving sites. | ||||||||
BERRIEN COUNTY | Niles Community School District | 02/28/2006 | 1 | Tower, etal | Failed | 1,305/4,471 | $105,200,000 | |
erecting, furnishing and equipping a new high school; erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equiipping and re-equipping school facilities; acquiring, installing and equipping technology for existing school facilities and the new high school; constructing, improving nad equipping playgrounds and outdoor athletic/physical education fields and facilities; and acquiring, developing and improving sites? | ||||||||
WAYNE COUNTY | Northville Public Schools | 02/28/2006 | 1 | Fanning & Howey | Failed | 2,875/4,063 | $25,235,000 | |
erecting, furnishing and equipping a new elementary school; acquiring and installing educational technology improvements; acquiring land and developing and improving a plyground and the site? | ||||||||
WAYNE COUNTY | Northville Public Schools | 02/28/2006 | 2 | Fanning & Howey | Failed | 2,922/4,006 | $45,430,000 | |
remodeling, refurnishing and re-equipping school district buildings, erecting, furnishing and equipping a field house addition to the Northville High School and a new transportation facility; acquiring school buses and education technology improvements; and developing and improving playgrounds, athletic fields and facilities and sites? | ||||||||
INGHAM COUNTY | Okemos Public Schools | 05/02/2006 | 1 | None | Failed | 2,221/2,368 | $7,900,000 | |
Acquiring and installing educational technology and related cabling in all school buildings; and purchasing buses. | ||||||||
WAYNE COUNTY | Plymouth-Canton Community Schools | 05/02/2006 | 1 | TMP | Failed | 7,279/7,489 | $95,415,000 | |
Erecting, equipping and furnishing a new middle school building and a new career technical education facility and acquiring, preparing, developing and improving the sites for a new middle school building and a new career technical education facility; erecting, equipping and furnishing additions to school buildings and preparing, developing and improving sites for additions to school buildings; remodeling, re-equipping, re-furnishing school buildings, preparing, developing and improving sites at school buildings and purchasing school buses; and equipping and re-equipping school buildings for technology systems and equipment. | ||||||||
WAYNE COUNTY | Plymouth-Canton Community Schools | 05/02/2006 | 2 | TMP | Failed | 6,016/8,466 | $24,765,000 | |
Erecting, equipping and furnishing a performing arts center addition, a multi purpose swimming pool addition and an auxiliary gymnasium addition to high school buildings; preparing, developing and improving sites for a performing arts center addition, a multi purpose swimming pool addition and an auxiliary gymnasium addition to high school buildings; equipping additions to high school buildings for technology systems and equipment; and erecting, equipping and furnishing additions to athletic fields and preparing, developing and improving sites for additions to athletic fields. | ||||||||
BERRIEN COUNTY | River Valley School District | 05/02/2006 | 1 | Hebard | Failed | 792/1,272 | $21,905,000 | |
erecting, furnishing and equipping a new elementary school; developing and equipping a playground; erecting, furnishing and equipping an addition to and partially remodeling, furnishing and re-equipping the middle/high school; acquiring and installing education technology; relocatiing, improving and requipping the softball and baseball fields; and developing and improving sites? | ||||||||
MACOMB COUNTY | Roseville Community Schools | 05/02/2006 | 1 | Wold | Passed | 2,720/1,793 | $72,000,000 | |
Erecting two new replacement elementary school buildings in the School District; erecting additions to existing School District buildings, including elementary school gymnasiums; remodeling existing School District buildings, including accessibility, fire alarm systems, boilers, roofs and restroom improvements and secondary school science labs; equipping, furnishing, reequipping and refurnishing School District buildings and acquiring buses; improving and developing sites, including traffic flow and parking improvements, playgrounds, playfields and junior high athletic fields, drainage at high school athletic fields, facilities and structures in the School District; and acquiring and installing technology infrastructure and equipment in and connecting School District buildings. | ||||||||
MACOMB COUNTY | Roseville Community Schools | 05/02/2006 | 2 | Wold | Passed | 2,416/2,074 | $38,000,000 | |
Remodeling, refurnishing and reequipping existing School District buildings, including security and climate control improvements; constructing, furnishing and equipping additions to Roseville High School and making related site improvements; and acquiring and installing technology infrastructure and equipment in and connecting School District buildings. | ||||||||
SAGINAW COUNTY | Saginaw Township Community Schools | 05/02/2006 | 1 | TMP | Failed | 2,996/6,217 | $104,700,000 | |
Remodeling existing School District buildings, including energy conservation, climate control, safety and security improvements; constructing additions to existing School District buildings, including Weiss Elementary School, White Pine Middle School and Heritage High School; constructing two new replacement elementary school buildings in the school district; acquiring and installing technology infrastructure and equipment in and connecting School District buildings; improving and developing School District sites, including parking, playgrounds and outdoor athletic facilities and structures; and equipping and/or reequipping and furnishing and/or refurnishing School District buildings and acquiring school buses. | ||||||||
IONIA COUNTY | Saranac Community Schools | 05/02/2006 | 1 | Tower-G | Passed | 504/290 | $8,885,000 | |
Erecting, furnishing and equipping additions to, and partially remodeling, furnishings and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; acquiring school buses; constructing, equipping, developing and improving athletic fields, facilities and playgrounds; and developing and improving sites. | ||||||||
ALLEGAN COUNTY | Saugatuck Public Schools | 02/28/2006 | 1 | GMB | Failed | 502/591 | $8,320,000 | |
erecting, furnishing and equipping additions to and partially remodelling, re-furnishing, and re-equipping the Douglas Elementary School; acquiring and installing educational technology; constructing and equiipping improvemetns to the football/soccer field to include new bleachers, running track, and concession/restroom facilities; construcking a new baseball field; acquiring additional land for site purposes; and developing and improving sites? | ||||||||
OTTAWA COUNTY | Spring Lake Public Schools | 05/02/2006 | 1 | Fanning & Howey | Passed | 1,532/946 | $17,625,000 | |
erecting, furnishing and equipping an aquatic/community center addition to and paritally remodeling, refurnishing and re-equipping the High School; partially remodeling, refurnishing and re-equipping the Intermediate/Middle School; relocating some athletic fields at the High School; purchasing buses; acquiring nad installing educational technology in all school facilities; and developing and improving sites? | ||||||||
OTTAWA COUNTY | Spring Lake Public Schools | 05/02/2006 | 2 | Fanning & Howey | Passed | 1,700/794 | $5,050,000 | |
erecting, furnishing, and equipping additions to and paritally refurnishing the Holmes and Jeffers Elementary Schools; adding lockers at the High School; erecting, furnishing and equipping a concession/restroom facility and bleachers at the Grabinski Field; lighting the soccer field: erecing, furnishing an addition to and partially remodeling, refurnishing and re-equipping the Intermediate/Middle School; and developing and improving sites | ||||||||
WAYNE COUNTY | Trenton Public Schools | 05/02/2006 | 1 | Fanning & Howey | Failed | 2,400/3,000 | $54,200,000 | |
Erecting, furnishing, and equipping two new replacement elementary school buildings in the School District; remodeling, equipping, furnishing, reequipping and refurnishing existing School District buildings including Arthurs Middle School and Trenton High School; acquiring and installing technology infrastructure and equipment in and connecting School Distric buildings; and improving and developing sites, including playgrounds, outdoor athletic fields, facilities and structures in the School District and acquiring school buses. | ||||||||
WAYNE COUNTY | Van Buren Public Schools | 02/28/2006 | 1 | Kingscott | Failed | 2,752/4,175 | $111,000,000 | |
Purchasing land for a new Belleville High School facility and developing and improving a site, and constructing, erecting, equipping, including equipping for technology and technology improvements, and furnishing thereon a new Belleville High School facility, including athletic fields and related structures;and prepairing and improving the site of the current Belleville High School and improving and remodeling (to include partial demolition and abatement) the current Belleville High School? | ||||||||
SAINT JOSEPH COUNT | White Pigeon Community Schools | 11/07/2006 | 1 | URS Greiner | Failed | 1,059/1,259 | $15,995,000 | |
Erecting, furnishing and equipping additions to Central Elementary School; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing and equipping a playground; and developing and improving sites. | ||||||||