SAINT CLAIR COUNTY | Algonac Community School District | 11/06/2007 | 1 | French | Passed | 1,819/769 | $33,210,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping the elementary and middle school facilities; erecting, furnishing and equipping additions to the high school to include an expansion to the band room and an auxiliary gym; acquiring and installing educational technology; re-roofing the maintenance facility; acquiring new buses; constructing and equipping improvements to outdoor athletic facilities; developing and improving sites. | ||||||||
OTTAWA COUNTY | Allendale Public School District | 05/08/2007 | 1 | GMB | Passed | 1,314/921 | $59,710,000 | |
erecting, furnishing and equipping a new middle schoool and a new elementary school; partially remodeling, equipping and/or furnishing school facilities; constructing, developing and equipping playgrounds, playfields and athletic fields; acquiring and installing educational technology; acquiring land and developing and improving sites; and refunding the school district's School Loan Revolving Fund existing debt? | ||||||||
OTTAWA COUNTY | Allendale Public School District | 05/08/2007 | 2 | GMB | Failed | 896/1,337 | $3,370,000 | |
erecting, furnishing and equipping a new maintenance facility; and developing and improving the site? | ||||||||
OTTAWA COUNTY | Allendale Public School District | 05/08/2007 | 3 | GMB | Failed | 908/1,278 | $2,920,000 | |
constructing and equipping improvements to the high school athletic complex to include additional bleachers, tennis courts, running track improvements, and the team room/locker/storage facility; and developing and improving the site? | ||||||||
OTTAWA COUNTY | Allendale Public School District | 05/08/2007 | 4 | GMB | Failed | 990/1,217 | $3,280,000 | |
remodeling and re-equipping the high school; and developing and improving the site? | ||||||||
CALHOUN COUNTY | Battle Creek Public Schools | 05/08/2007 | 1 | TMP | Passed | 1,897/1,503 | $68,900,000 | |
Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping Central High School, the Field House, and Valley View Elementary School; acquiring, installing and equipping technology for school facilities; replacing school buses; constructing, equipping, developing and improving athletic/physical education facilities, play/practice fields, and a playground; and acquiring, developing and improving sites. | ||||||||
CHARLEVOIX COUNTY | Beaver Island Community School | 08/07/2007 | 1 | Beta Design | Passed | 204/138 | $3,950,000 | |
Erecting, furnishing and equipping an addition to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping the Beaver Island Community School; acquiring, installing and equipping technology for the addition and the Beaver Island Community School; constructing, equipping and relocating a playground and play field; and developing and improving the site. | ||||||||
GENESEE COUNTY | Beecher Community School District | 02/27/2007 | 1 | THA | Passed | 211/134 | $3,270,000 | |
Remodeling school facilities; purchasing school buses; developing a playground; and developing and improving sites. | ||||||||
EATON COUNTY | Bellevue Community Schools | 11/06/2007 | 1 | Fanning & Howey | Passed | 750/531 | $23,450,000 | |
Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving outdoor athletic/physical education facilties, play fields and playgrounds; acquiring school buses; and developing and improving sites. | ||||||||
VAN BUREN COUNTY | Bloomingdale Public School District | 08/07/2007 | 1 | URS Greiner | Passed | 370/317 | $4,995,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing a music room addition to Bloomingdale Elementary School and a community pavilion at Pullman Elementary School; constructing, remodeling, equipping, developing, and improving athletic facilities, play fields and playgrounds; erecting, furnishing and equipping a bus maintenance garage; and developing and improving sites. | ||||||||
BERRIEN COUNTY | Brandywine Community Schools | 05/08/2007 | 1 | Hebard | Passed | 701/492 | $5,750,000 | |
partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping additions to the elementary school; acquiring, installing and equipping techonology for school facilities; constructing, equipping, developing and improving physical education/athletic facilities; and developing and improving sites. | ||||||||
KENT COUNTY | Caledonia Community Schools | 05/08/2007 | 1 | GMB | Passed | 2,168/1,092 | $30,500,000 | |
Constructing, furnishing and equipping a new elementary school and additions to other school buildings; remodeling, furnishing and refurnishing, and equipping and reequipping school buildings; acquiring and installing educational technology improvements to school buildings; purchasing school buses; acquiring a site or sites; and developing and improving playgrounds, play fields, athletic fields and facilities and sites. | ||||||||
CASS COUNTY | Cassopolis Public Schools | 11/06/2007 | 1 | Fanning & Howey | Failed | 636/1,100 | $31,150,000 | |
Remodeling, refurnishing and re-equipping the Ross Beatty Building; erecting, furnishing and equipping a new Pre K - 8th grade building; acquiring and installing educational technology improvements; and developing and improving sites, playgrounds, outdoor physical education and athletic and athletic fields and facilties. | ||||||||
CASS COUNTY | Cassopolis Public Schools | 05/08/2007 | 1 | Fanning & Howey | Failed | 568/1,019 | $29,500,000 | |
remodeling, refurnishing and re-equipping the Ross Beaty Building; erecting, furnishing and equipping a new PreK-8th grade building; acquiring and installing educational technology improvements; and developing and improving sites, playgrounds, outdoor physical education and athletic fields and facilities? | ||||||||
SHIAWASSEE COUNTY | Corunna Public School District | 05/08/2007 | 1 | SHW Group, LLP | Failed | 454/1,631 | $10,680,000 | |
Erecting, furnishing and equipping a performing arts center; acquiring land for site purposes; developing and improving the site. | ||||||||
WAYNE COUNTY | Crestwood School District | 05/08/2007 | 1 | TMP | Failed | 960/2,741 | $21,435,000 | |
erecting, furnishing and equipping additions to, and remodleing, furnishing and refurnishing, equipping and re-equipping the elementary schools; acquiring, installing and equipping technology for the elementary schools; and developing and improving sites? | ||||||||
WAYNE COUNTY | Crestwood School District | 05/08/2007 | 2 | TMP | Failed | 965/2,736 | $15,030,000 | |
erecting, furnishing and equipping an addition to, and remodeling, furnishing and refurnishing, equipping and re-equipping the middle school; acquiring, installing and equipping technology for the middle school; and developing and improving the sites. | ||||||||
WAYNE COUNTY | Crestwood School District | 05/08/2007 | 3 | TMP | Failed | 1,027/2,672 | $18,195,000 | |
erecting, furnishing and equipping additions to, and remodeling, furnishing and refurnishing, equipping and re-equipping the high school; acquiring, installing and equipping technology for the high school; constructing, equipping, developing nad improving athletic facilities and play fields; and developing and improving the site. | ||||||||
KENT COUNTY | East Grand Rapids Public Schools | 11/06/2007 | 1 | URS Greiner | Passed | 1,472/1,112 | $12,480,000 | |
Constructing, furnishing and equipping improvements to Mehney and Memorial Fields; erecting, furnishing and equipping additions to the high school to include an auxiliary gym, training center and additional seating at the pool; constructing, furnishing and equipping a field event center to include team rooms, concessions and restrooms; erecting, furnishing and equipping an addition to Woodcliff Center for tennis center restroom/concessions; and developing and improving sites. | ||||||||
WAYNE COUNTY | Flat Rock Community Schools | 11/06/2007 | 1 |
| Passed | 942/733 | $19,210,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for the new additions and existing school facilities; relocate playgrounds to accommodate additions; and developing and improving sites. | ||||||||
WAYNE COUNTY | Flat Rock Community Schools | 11/06/2007 | 2 |
| Failed | 708/944 | $7,560,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part for upgrading entryways and energy conservation improvements; acquiring, installing and equipping technology for existing facilities; constructing, equipping, developing and improving tennis courts, playgrounds and play fields and the middle school running track; and developing and improving sites? | ||||||||
KALKASKA COUNTY | Forest Area Community Schools | 05/08/2007 | 1 | Clark Walter Sirrine Architects | Failed | 330/495 | $6,160,000 | |
Erecting, furnishing and equipping an addition or additions to and partially remodeling, equipping and re-equipping and furnishing and refurnishing existing school buildings; acquiring and installing educational technology; equipping and re-equipping and improving playgrounds and developing and improving sites. | ||||||||
GRATIOT COUNTY | Fulton Schools | 02/27/2007 | 1 | Wakely-M | Failed | 484/812 | $20,300,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; and developing and improving the playground, athletic fields and facilities and sites. | ||||||||
GLADWIN COUNTY | Gladwin Community Schools | 08/07/2007 | 1 | Integrated Designs | Passed | 1,003/458 | $2,400,000 | |
remodeling the high school, including roof replacements and cafetria improvements; acquiring and installing lockers; acquiring school buses; and developing and improving sites? | ||||||||
EATON COUNTY | Grand Ledge Public Schools | 05/08/2007 | 1 | GMB | Passed | 3,593/3,309 | $34,650,000 | |
Acquiring, installing and equipping technology for school facilities; erecting, furnishing and equipping additions to and partially remodeling, furnishing, and refurnishing, equipping and re-equipping school facilities; constructing, equipping and improving playgrounds and a storage facility; developing and improving sites; and acquiring school buses. | ||||||||
EATON COUNTY | Grand Ledge Public Schools | 05/08/2007 | 2 | GMB | Failed | 2,487/4,395 | $5,555,000 | |
Constructing, equipping, re-equipping, developing and improving athletic facilities, practice and playfields; and developing and improving sites. | ||||||||
ALLEGAN COUNTY | Hopkins Public Schools | 05/08/2007 | 1 | Tower, etal | Passed | 671/267 | $17,950,000 | |
erecting, furnishing and equipping additions to and/or partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring and installing eduational techology: partially remodeling the bus garage; relocating playgrounds; constructing and equipping new improvements to existing athletic and practice fields; and acquiring, developing and improving sites | ||||||||
GRAND TRAVERSE COU | Kingsley Area Schools | 05/08/2007 | 1 | GMB | Failed | 350/900 | $16,510,000 | |
Constructing, furnishing and equipping a new middle school; constructing, furnishing and equipping an addition to the high school; acquiring and installing educational technology improvements to school buildings; and developing and improving playfields, athletic fields and sites. | ||||||||
MISSAUKEE COUNTY | Lake City Area Schools | 05/08/2007 | 1 | Beta Design | Failed | 808/1,110 | $18,250,000 | |
erecting, furnishing and equipping a K-5 elementary school buildling; constructing and equipping playgrounds; acquiring and installing educational technology; and developing and improving sites? | ||||||||
MACOMB COUNTY | Lakeview Public Schools (Macomb) | 11/06/2007 | 1 | Partners in Architecture | Passed | 2,898/2,547 | $15,035,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping the elementary schools, middle school and high school; erecting, furnishing and equipping an addition to the high school for a cafeteria and auxiliary gymnasium; constructing, equipping, developing and improving outdoor athletic/physical education facilities and play fields; and developing and improving sites. | ||||||||
GENESEE COUNTY | Lakeville Community Schools | 11/06/2007 | 1 | Integrated Designs | Failed | 560/847 | $5,500,000 | |
Remodeling, refurnishing and re-equipping school district buildings; acquiring school buses, and developing and improving athletic fields and facilities and sites. | ||||||||
IONIA COUNTY | Lakewood Public Schools | 05/08/2007 | 1 | Jeffrey Parker | Passed | 1,556/1,230 | $29,255,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings, developing and improving athletic facilities and sites and acquiring and installing educational technology improvements. | ||||||||
LAPEER COUNTY | Lapeer Community Schools | 05/08/2007 | 1 | French | Passed | 4,537/3,308 | $56,750,000 | |
remodeling and construction additions to the Zemmer and Woodside school buildings and to create middle schools to serve grades 6 to 8; acquiring, improving and developing sites, including athletic fields, facilities and structures in the school district; remodeling and constructing additions to other existing School District buildings, including lighting, safety and energy improvements; equipping, furnishing, reequipping, and refurnishing School District buildings and additions; and acquiring and installing technology infrastructure and equipment in and connecting School District buildings? | ||||||||
VAN BUREN COUNTY | Lawrence Public School District | 11/06/2007 | 1 | None | Passed | 232/134 | $475,000 | |
Equipping and re-equipping school buildings; and acquiring, installing, equipping and re-equipping school buildings for technology. | ||||||||
VAN BUREN COUNTY | Lawton Community School District | 11/06/2007 | 1 | GMB | Failed | 424/783 | $13,365,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping the Lawton Elementary School, including educational technology improvements and developing and improving the playground and site. | ||||||||
EATON COUNTY | Maple Valley Schools | 08/07/2007 | 1 | Kingscott | Failed | 442/713 | $4,435,000 | |
Remodeling, refunishing and re-equipping school buildings; and acquiring and installing educational technology in the middle/high school. | ||||||||
CALHOUN COUNTY | Marshall Public Schools | 05/08/2007 | 1 | Kingscott | Passed | 1,176/831 | $8,700,000 | |
remodeling the High School and Middle School; developing and improvoing the High School site; acquiring and installing educational technology improvements to school buildings; and equipping and re-equipping and furnishing and refurnishing school buildings? | ||||||||
SAINT CLAIR COUNTY | Marysville Public Schools | 05/08/2007 | 1 | French | Passed | 1,863/1,811 | $74,600,000 | |
constructing, furnishing and equipping a new high school building in the School District, including central administration offices; constructing, furnishing and equipping additions to Gardens, Morton, and Washington Elementary Schools and Marysville Middle School; remodeling, furnishing and equipping, refurnishing and reequipping existing School District buildings, including accessibility, security, energy and climate control improvments; acquiring and installing technology infrastructure and equipment in School District buildings; and improving and developing existing School District sites, including playgrounds, outdoor athletic fields and facilities. | ||||||||
SAINT CLAIR COUNTY | Memphis Community Schools | 02/27/2007 | 1 | William Vogan Architects | Passed | 503/194 | $6,325,000 | |
construction, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; developing and improving athletic fields and sites; and acquiring school buses? | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 09/25/2007 | 1 | Hobbs & Black Associates | Failed | 350/356 | $11,650,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, furnishing and re-furnishing, equipping and re-equipping the Morrice Elementary and Junior/High School buildings; developing and equipping improvements to the playground; acquiring and installing educational technology; and developing and improving sites. | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 09/25/2007 | 2 | Hobbs & Black Associates | Failed | 308/396 | $1,615,000 | |
Constructing, furnishing and equipping a community athletic facility, to include lighting, football field, handicap accessible bleachers, press box, track and restroom facilities. | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 09/25/2007 | 3 | Hobbs & Black Associates | Passed | 371/330 | $435,000 | |
Purchasing school buses. | ||||||||
ISABELLA COUNTY | Mt. Pleasant City School District | 05/08/2007 | 1 | Kingscott | Passed | 1,247/503 | $14,900,000 | |
erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refunishing, equipping and re-equipping school facilities; constructing equipping, developing and improving athletic/physical education facilities, play fields and playgrounds; acquiring and remodeling and building and site for educational purposes; and developing and improving sites? | ||||||||
BERRIEN COUNTY | Niles Community School District | 05/08/2007 | 1 | Tower, etal | Failed | 306/776 | $37,165,000 | |
Erecting, furnishing and equipping additions to Northside, Ballard and Howard Elementary Schools; remodeling, furnishing and refurnishing, equipping and reequipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping and improving playgrounds and physical education/athletic facilities and fields; and developing and improving sites. | ||||||||
BERRIEN COUNTY | Niles Community School District | 05/08/2007 | 2 | Tower, etal | Failed | 292/779 | $2,370,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping Eastside School for education and administration purposes, acquiring, installing and equipping technology for Eastside School; and developing and improving the site. | ||||||||
OAKLAND COUNTY | Novi Community School District | 05/08/2007 | 1 | Fanning & Howey | Passed | 2,526/1,683 | $26,400,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring and installing building security systems; and developing and improving playgrounds and sites. | ||||||||
INGHAM COUNTY | Okemos Public Schools | 05/08/2007 | 1 | None | Passed | 2,725/2,410 | $6,800,000 | |
Acquiring and installing educational technology and related cabling in school facilities; equipping and re-equipping, and furnishing and refurnishing school facilities; and purchasing buses. | ||||||||
KALAMAZOO COUNTY | Parchment School District | 02/27/2007 | 1 | Kingscott | Passed | 1,085/672 | $18,000,000 | |
Erecting, furnishing and equipping additions to, and remodeling, refurnishing and re-equipping Parchment High School; acquiring and installing educational technology improvements; and developing and improving athletic fields and facilities and the site. | ||||||||
BAY COUNTY | Pinconning Area Schools | 08/07/2007 | 1 | French | Passed | 1,803/1,292 | $15,300,000 | |
Erecting, furnishing and equipping additions to and, acquiring and installing educational technology in partially remodeling, refurnishing and re-equipping the middle school/high school facilities and improving the site. | ||||||||
WAYNE COUNTY | Plymouth-Canton Community Schools | 02/27/2007 | 1 | TMP | Failed | 6,968/7,715 | $62,100,000 | |
erecting, equipping, and furnishing a new middle school building and acquiring, prepairing, developing and improving the site for a new middle school buildin; erecting, equipping and furnishing additions to school buildings and preparing, and improving sites for additions to school buildings; remodeling, re-equipping, re-furnishing schoool buildings and other facilities, preparing, developing and improving sites at school buildings and other facilities, and purchasing school buses; and equipping and re-equipping school buildings for technology systems and equipment? | ||||||||
DELTA COUNTY | Rapid River Public Schools | 09/25/2007 | 1 | Integrated Designs | Passed | 216/177 | $4,225,000 | |
Erecting, furnishing and equipping an addition to and remodeling, refurnishing and re-equipping the Rapid River school; acquiring and installing educational technology system improvements; acquiring school buses; and developing and improving athletic fields and facilities and the site. | ||||||||
BERRIEN COUNTY | River Valley School District | 02/27/2007 | 1 | Hebard | Failed | 967/1,403 | $27,550,000 | |
erecting, furnishing and equipping a new elementary school; developing and equipping playgrounds and an athletic field: erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping the middle/high school; acquiring and installing education technology; acquiring buses; and developing and improving sites | ||||||||
MACOMB COUNTY | Romeo Community Schools | 02/27/2007 | 1 | Fanning & Howey | Failed | 2,095/3,323 | $93,000,000 | |
equipping and re-equipping school buildings for technology systems and equipment; erecting, equipping and furnishing additions to a school building, remodeling, re-equipping and refurnishing a school building and preparing, developing and improving the site of a school building for use as a new high school building; erecting, equipping and furnishing additions to school buildings to enhance security and preparing, developing and improving sites for additions to school buildings; remodeling, re-equipping, re-furnishing school buildings and other facilities to enhance security, preparing, developing sites at school buildings and other facilities; and erecting, equipping and furnishing a new bus maintenance garage, preparing, developing and improving the site for the new bus maintenance garage and purchasing school buses? | ||||||||
SAGINAW COUNTY | Saginaw Township Community Schools | 11/06/2007 | 1 | TMP | Failed | 3,456/3,851 | $39,895,000 | |
Remodeling existing School District buildings, including energy conservation, climate control, safety and security improvements; constructing additions to existing School District buildings, including secure elementary and middle school entrances; acquiring and installing technology infrastructure and equipment in and connecting School District buildings; improving and developing School District sites, including parking and outdoor athletic facilities and structures; and equipping and/or reequipping and furnishing and/or refurnishing School District Buildings. | ||||||||
ISABELLA COUNTY | Shepherd Public School District | 11/06/2007 | 1 | Tower, etal | Passed | 1,070/648 | $29,125,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; developing and improving playgrounds, athletic fields and facilities and sites. | ||||||||
MACOMB COUNTY | South Lake Schools | 05/08/2007 | 1 | French | Failed | 1,592/1,670 | $15,000,000 | |
Remodeling, re-equipping, re-furnishing school buildings, athletic facilities and other facilities and preparing, developing and improving sites at school buildings, athletic facilities and playgrounds; erecting, equipping and furnishing additions to school buildings and preparing, developing and improving sites for additions to school buildings; erecting, equipping and furnishing athletic facilities and improving sites for athletic facilities; and equipping and re-equipping school buildings for technology systems and equipment and purchasing school buses. | ||||||||
MACOMB COUNTY | South Lake Schools | 05/08/2007 | 2 | French | Failed | 1,230/1,952 | $14,900,000 | |
erecting, equipping, and furnishing additions to schools buildings (including a new band and choir room) and preparing, developing and improving sites for additions to school buildings; and remodeling, re-equipping, re-furnishing school buildings, athletic facilities, playgrounds and other facilities and acquiring, preparing, developing and improving sites at school buildings, athletic facilities and playgrounds; and erecting and equipping storage facilities for safety purposes and developing and improving sites for storage facilities; and equipping and re-equipping school buildings for technology systems and equipment and purchasing schools buses. | ||||||||
WAYNE COUNTY | Southgate Community School District | 02/27/2007 | 1 | None | Failed | 995/1,775 | $8,750,000 | |
Acquiring, installing and equipping technology for school facilities; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part for security purposes; constructing, equipping, developing and improving outdoor athletic play fields and facilities, including a new running track and tennis courts; constructing a school office for Chormann Elementary School; acquiring school buses; and developing and improving sites. | ||||||||
GENESEE COUNTY | Swartz Creek Community Schools | 05/08/2007 | 1 | SHW Group, LLP | Failed | 2,837/3,961 | $79,070,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-quipping school district buildings, erecting, furnishing and equipping a new high school building; acquiring and installing educational technology improvements; acquiring real property for site purposes; and developing and improving outdoor physical education facilities, playgrounds and sites. | ||||||||
GENESEE COUNTY | Swartz Creek Community Schools | 05/08/2007 | 2 | SHW Group, LLP | Failed | 2,501/4,271 | $10,595,000 | |
Erecting, furnishing and equipping an auditorium addition to the proposed new high school and developing and improving the site. | ||||||||
BARRY COUNTY | Thornapple Kellogg School | 05/08/2007 | 1 | Tower, etal | Passed | 1,031/742 | $29,415,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; acquiring school buses; constructing, developing and improving playgrounds; and acquiring, developing and improving sites. | ||||||||
JACKSON COUNTY | Vandercook Lake Public Schools | 11/06/2007 | 1 | Don B. Robers Architect and Associates | Passed | 584/228 | $4,535,000 | |
Remodeling, furnishing, refurnishing, equipping, and reequipping School District buildings, including boiler replacement, roofing, security/building entrances, safety, window replacement, energy conservation improvements and lighting; constucting, equipping and furnishing additions, including expansion of the cafeteria at Vandercook Lake High School/Middle School; acquiring, developing and improving sites, including parking improvements, outdoor athletic facilites, fields and structures; acquiring and installing technology infrastructure and equipment in school district buildings. | ||||||||
INGHAM COUNTY | Webberville Community Schools | 02/27/2007 | 1 | Fanning & Howey | Failed | 440/509 | $6,500,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, acquiring, installing and equipping technology for school facilities, constructing equipping, developing and improving outdoor athletic facilities, play fields and a playground; acquiring school buses; and developing and improving sites. | ||||||||
SAINT JOSEPH COUNT | White Pigeon Community Schools | 05/08/2007 | 1 | URS Greiner | Failed | 49/328 | $16,900,000 | |
partially remodeling, furnishing and refurnishing, equipping and re-equipping Central Elementary School and the Middle/High School; erecting, furnishing nd equipping additions to, and construction and equipping a playground for Central Elementary School; acquiring, installing and equipping technology for school facilites; and developing and improving sites? | ||||||||
SAINT CLAIR COUNTY | Yale Public Schools | 11/06/2007 | 1 | Kingscott | Failed | 895/897 | $19,265,000 | |
Erecting, furnishing and equipping an addition or additions to and/or partially remodeling, furnishing and refurnishing, equipping and re-equipping existing school facilities; acquiring and installing educational technology; purchasing school buses; constructing and equipping improvements to playfields and outdoor athletic facilities; acquiring land; and developing and improving sites. | ||||||||
SAINT CLAIR COUNTY | Yale Public Schools | 11/06/2007 | 2 | Kingscott | Failed | 686/1,103 | $9,615,000 | |
Erecting, furnishing and equipping an auxiliary gymnasium and auditorium additions to the high school; and developing and improving the site. | ||||||||
WASHTENAW COUNTY | Ypsilanti Community Schools | 08/07/2007 | 1 | Kingscott | Passed | 1,136/1,034 | $49,135,000 | |
Equipping and re-equipping school buildings and other facilities for technology systems and equipment; remodeling, re-equipping, re-furnishing, school buildings and other facilities and preparing, developing and improving sites at school buildings and other facilities; erecting, equpping and furnishing and addition to other facilities and preparing, developing and improving sites at school buildings and other facilities; erecting, equipping and furnishing a new transportation/bus maintenance facility, preparing, developing and improinv the site for the new transportion/bus maintenance facility and purchasing school buses. | ||||||||
OTTAWA COUNTY | Zeeland Public Schools | 11/06/2007 | 1 | GMB | Failed | 1,846/2,084 | $19,750,000 | |
Erecting, furnishing and equipping an early childhood center; remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; purchasing school buses and developing and improving playgrounds and sites. | ||||||||