STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
County | School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
BARRY COUNTY | Hastings Area School District | 08/03/2010 | 1 | SHW Group, LLP | Passed | 1,661/1,556 | $3,200,000 | |
Remodeling, equipping and re-equipping and furnishing and refurnishing school facilities; acquiring and installing educational technology in school buildings; and developing and improving playgrounds, athletic facilities and sites. | ||||||||
BERRIEN COUNTY | River Valley School District | 08/03/2010 | 1 | Hebard & Hebard Architects | Failed | 892/949 | $14,000,000 | |
Erecting, furnishing and equipping an elementary school addition to the existing middle/high school; partially remodeling, equipping and re-equipping and furnishing and refurnishing the existing middle/high school; acquiring and installing educational technology to the school building; and developing and improving athletic fields and facilities, playgrounds and the site. | ||||||||
BERRIEN COUNTY | St. Joseph Public Schools | 05/04/2010 | 1 | Hebard & Hebard Architects | Passed | 2,987/2,337 | $38,000,000 | |
Erecting, equipping and furnishing additions to and remodeling, equipping and reequipping, and furnishing and refurnishing school buildings; acquiring, installing and equipping and re-equipping school buildings for technology; and preparing, developing and improving sites. | ||||||||
BRANCH COUNTY | Bronson Community School District | 11/02/2010 | 1 | Kingscott | Failed | 600/2,005 | $23,900,000 | |
Erecting, furnishing and equipping a new elementary school building; remodeling, equipping and re-equipping and furnishing and refurnishing the existing junior/senior high school building; acquiring, installing and equipping and re-equipping school buildings for technology; preparing, developing and improving playgrounds, play fields, driveways, and parking lots; and preparing, developing and improving sites. | ||||||||
BRANCH COUNTY | Quincy Community School District | 05/04/2010 | 1 | Fanning Howey | Failed | 505/707 | $1,995,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping, instructional technology for school facilities; and developing and improving sites. | ||||||||
CALHOUN COUNTY | Marshall Public Schools | 05/04/2010 | 1 | Middle Cities Ed Assoc | Passed | 1,724/1,160 | $24,845,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, furnishing and equipping an addition to Gordon Elementary School; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving outdoor athletic/physical education facilities, play fields and playgrounds; and acquiring, developing and improving sites. | ||||||||
CALHOUN COUNTY | Marshall Public Schools | 05/04/2010 | 2 | Middle Cities Ed Assoc | Passed | 1,506/1,371 | $8,920,000 | |
Erecting, furnishing and equipping a new auditorium for the high school; and developing and improving the site. | ||||||||
CASS COUNTY | Cassopolis Public Schools | 02/23/2010 | 1 | Fanning Howey | Passed | 553/390 | $16,000,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping the Sam Adams Elementary School; acquiring and installing educational technology improvements; and developing and improving playgrounds and the site. | ||||||||
CHEBOYGAN COUNTY | Inland Lakes Schools | 05/04/2010 | 1 | GMB | Failed | 432/789 | $1,520,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping the Middle School/High School, in part, for energy conservation and safety improvements; acquiring, installing and equipping instructional technology for the Middle School/High School; and developing and improving the site. | ||||||||
CLINTON COUNTY | St. Johns Public Schools | 05/04/2010 | 1 | Kingscott | Passed | 2,753/2,375 | $64,325,000 | |
Erecting, furnishing, and equipping additions to the high school; acquiring and installing educational technology in school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school facilities; purchasing school buses; erecting athletic facilities; and developing and improving athletic facilities, athletic fields and sites. | ||||||||
DELTA COUNTY | Escanaba Area Public Schools | 02/23/2010 | 1 | Diekema Hamann Architecture | Passed | 1,346/1,218 | $21,670,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving outdoor athletic and physical education facilities, play fields, playgrounds and storage sheds; erecting, furnishing and equipping additions to Pathfinder School, in part, to connect to Navigator School for a performing and visual arts wing; erecting, furnishing and equipping a facility for building and grounds and transportation; and acquiring, developing and improving sites. | ||||||||
EATON COUNTY | Charlotte Public Schools | 11/02/2010 | 1 | Beta Design | Passed | 4,456/4,018 | $23,600,000 | |
Remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; erecting, furnishing and equipping additions to the high school; acquiring, installing and equipping and re-equipping school buildings for technology; purchasing school buses; developing, improving and equipping and re-equipping playgrounds and play fields; and developing and improving sites. | ||||||||
EATON COUNTY | Charlotte Public Schools | 05/04/2010 | 1 | Beta Design | Failed | 1,073/1,161 | $23,600,000 | |
Remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; erecting, furnishing and equipping an addition to a school building; acquiring, installing and equipping and re-equipping school buildings for technology; purchasing school buses; developing, improving and equipping and re-equipping playgrounds; and developing and improving sites. | ||||||||
EATON COUNTY | Eaton Rapids Public Schools | 11/02/2010 | 1 | Kingscott | Failed | 2,919/3,928 | $25,080,000 | |
Erecting, furnishing and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping existing school buildings; acquiring and installing educational technology in school buildings; purchasing school buses; erecting, furnishing and equipping improvements to athletic facilities, athletic fields and playgrounds; and developing and improving sites. | ||||||||
EMMET COUNTY | Alanson Public Schools | 05/04/2010 | 1 | Anthony Essen | Passed | 152/83 | $960,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping the Alanson Public School building; acquiring, installing and equipping technology; purchasing school buses; and developing and improving the site. | ||||||||
GENESEE COUNTY | Atherton Community Schools | 02/23/2010 | 1 | SHW Group, LLP | Failed | 271/435 | $14,070,000 | |
Improving and remodeling the current Atherton High School and the Atherton Middle School and remodeling and adding classrooms at the Van Y Elementary School, which would include equipping for technology and technology infrastructure, purchasing busses, and furnishing and improving the existing sites, including construction and renovation of athletic facilities and playground equipment thereon. | ||||||||
GRATIOT COUNTY | Alma Public Schools | 08/03/2010 | 1 | Wigen Tincknell Meyer & Associates | Passed | 2,905/2,152 | $9,715,000 | |
Shall Alma Public Schools, Gratiot, Montcalm and Isabella Counties, Michigan, borrow the sum of not to exceed Nine Million Seven Hundred Fifteen Thousand Dollars ($9,715,000) and issue its general obligation unlimited tax bonds therefor, for the purpose of: erecting, furnishing and equipping an addition to, and remodeling, re-furnishing and re-equipping the high school; acquiring and installing educational technology at the high school; and developing and improving athletic facilities and the site? | ||||||||
GRATIOT COUNTY | Ithaca Public Schools | 08/03/2010 | 1 | Integrated Designs | Passed | 734/422 | $3,480,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part, for energy conservation improvements and roof replacement; and acquiring, installing and equipping educational technology for the junior/senior high school. | ||||||||
HOUGHTON COUNTY | Public Schools of Calumet | 05/04/2010 | 1 | UP Engineers & Architects | Passed | 614/168 | $6,930,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings, acquiring and installing educational technology improvements and developing and improving sites. | ||||||||
IONIA COUNTY | Belding Area School District | 02/23/2010 | 1 | GMB | Passed | 1,289/665 | $38,800,000 | |
Erecting, furnishing and equipping additions to school buildings, including Ellis Elementary School, Woodview Elementary School, Belding Middle School and Belding High School; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part for security purposes; constructing, equipping, developing and improving athletic fields and facilities, play fields and playgrounds; acquiring, installing and equipping educational technology for school buildings; acquiring school buses; and developing and improving sites. | ||||||||
JACKSON COUNTY | Grass Lake Community Schools | 02/23/2010 | 1 | Dailey Engineering Inc. | Passed | 459/320 | $1,750,000 | |
Erecting, furnishing and equipping additions to the high school; acquiring, installing and equipping technology for the high school; and developing and improving the site. | ||||||||
KENT COUNTY | Kenowa Hills Public Schools | 05/04/2010 | 1 | Tower Pinkster | Passed | 1,530/1,209 | $14,325,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology system improvements and purchasing school buses; and developing and improving playgrounds, play fields, athletic fields and facilities and sites. | ||||||||
LEELANAU COUNTY | Suttons Bay Public Schools | 11/02/2010 | 1 | Clark Walter Sirrine Architects | Passed | 1,522/1,321 | $1,700,000 | |
Acquiring and installing technology for school buildings; refurnishing and re-equipping school buildings; and purchasing a special education school bus. | ||||||||
LEELANAU COUNTY | Suttons Bay Public Schools | 08/03/2010 | 1 | Clark Walter Sirrine Architects | Failed | 870/990 | $1,735,000 | |
Acquiring and installing technology for school buildings; refurnishing and re-equipping school buildings; and purchasing a special education school bus. | ||||||||
LENAWEE COUNTY | Addison Community Schools | 05/04/2010 | 1 | Kingscott | Passed | 336/272 | $19,990,000 | |
Erecting, equipping and furnishing additions to and remodeling, equipping and reequipping and furnishing and re-furnishing a school building; acquiring, installing and equipping and re-equipping school buildings for technology; developing and improving playgrounds, athletic fields and athletic facilities; and preparing,developing and improving sites. | ||||||||
LENAWEE COUNTY | Blissfield Community Schools | 02/23/2010 | 1 | The Collaborative Inc | Failed | 641/1,024 | $11,990,000 | |
Remodeling, refurnishing and re-equipping school district buildings, constructing, furnishing and equipping entry improvements and additions to the high school; acquiring and installing educational technology system improvements; and developing and improving sites. | ||||||||
LENAWEE COUNTY | Onsted Community Schools | 05/04/2010 | 1 | TMP | Passed | 784/687 | $16,200,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, including roof replacements, in part for energy conservation purposes; acquiring, installing and equipping educational technology for school buildings; erecting, furnishing and equipping an addition to the elementary center, in part for security purposes; acquiring school buses; and developing and improving sites. | ||||||||
LIVINGSTON CO | Hartland Consolidated Schools | 02/23/2010 | 1 | TMP | Passed | 1,492/1,371 | $28,045,000 | |
Partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; purchasing school buses and developing and improving athletic fields and facilities, playgrounds and sites. | ||||||||
LIVINGSTON CO | Pinckney Community Schools | 02/23/2010 | 1 | Wold | Passed | 2,451/2,315 | $59,465,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities; constructing, equipping, developing and improving outdoor athletic and physical education facilities, play fields, playgrounds and storage sheds; erecting, furnishing and equipping additions to Pathfinder School, in part, to connect to Navigator School for a performing and visual arts wing; erecting, furnishing and equipping a facility for building and grounds and transportation; and acquiring, developing and improving sites. | ||||||||
LUCE COUNTY | Tahquamenon Area Schools | 02/23/2010 | 1 | Integrated Design Solutions | Passed | 582/339 | $5,225,000 | |
Remodeling a school building for heating and energy conservation purposes; acquiring, installing and equipping and re-equipping a school building for technology; and purchasing and equipping school buses. | ||||||||
MACKINAC COUNTY | St. Ignace Area Schools | 11/02/2010 | 1 | Integrated Designs | Failed | 515/809 | $2,675,000 | |
Constructing a new biomass heating plant, remodeling the elementary school in connection with the heating plant and developing and improving the site; acquiring and installing educational technology improvements to school buildings; and acquiring buses. | ||||||||
MACKINAC COUNTY | St. Ignace Area Schools | 05/04/2010 | 1 | Integrated Designs | Failed | 318/329 | $2,675,000 | |
Constructing a new biomass heating plant and developing and improving the site; acquiring and installing educational technology improvements to school buildings; and acquiring buses. | ||||||||
MACOMB COUNTY | Chippewa Valley Schools | 02/23/2010 | 1 | Wakely | Passed | 5,886/4,150 | $89,765,000 | |
Partially remodeling, refunishing and re-equipping and erecting, furnishing and equipping additions to school district buildings; acquiring and installing educational technology system improvements; acquiring school buses; and developing and improving sites, athletic fields and facilities, playfields and playgrounds. | ||||||||
MACOMB COUNTY | Fitzgerald Public Schools | 05/04/2010 | 1 | Partners in Architecture | Failed | 304/889 | $68,640,000 | |
Erecting, equipping and furnishing a new elementary school building and additions to school buildings; remodeling, re-equipping, re-furnishing school buildings, playgrounds and other facilities; preparing, developing and improving sites at school buildings, playgrounds and other facilities; and equipping and re-equipping school buildings and other facilities for technology systems and equipment. | ||||||||
MARQUETTE COUNTY | Ishpeming Public School District | 05/04/2010 | 1 | Ehresman | Failed | 579/756 | $11,240,000 | |
Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping Birchview Elementary School; acquiring, installing and equipping instructional technology for Birchview Elementary School; preparing Phelps Middle School facility for closure; and developing and improving sites. | ||||||||
MONROE COUNTY | Airport Community School District | 11/02/2010 | 1 | SHW Group, LLP | Failed | 2,724/2,886 | $11,515,000 | |
Remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; erecting, furnishing and equipping an addition to the high school; and developing and improving sites. | ||||||||
MONTCALM COUNTY | Carson City-Crystal Area Schools | 05/04/2010 | 1 | CARMI Design Group | Passed | 402/205 | $1,030,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part, for energy conservation improvements; and acquiring, installing and equipping educational technology for school facilities. | ||||||||
MUSKEGON COUNTY | Fruitport Community Schools | 02/23/2010 | 1 | GMB | Passed | 1,525/862 | $8,600,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part, for energy conservation improvements; acquiring, installing and equipping technology for school facilities; purchasing school buses; constructing, equipping, developing and improving athletic facilities; and developing and improving site. | ||||||||
MUSKEGON COUNTY | Oakridge Public Schools | 11/02/2010 | 1 | URS Corporation | Passed | 1,339/1,132 | $8,640,000 | |
Erecting, furnishing and equipping an addition to the lower elementary school building; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving the high school track, elementary school playgrounds and play fields; developing and improving sites; and purchasing school buses. | ||||||||
MUSKEGON COUNTY | Whitehall District Schools | 05/04/2010 | 1 | Kingscott | Passed | 1,056/1,016 | $11,760,000 | |
Remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing and equipping and re-equipping school buildings for technology; purchasing school buses; constructing, equipping, developing and improving athletic facilities, athletic fields and play fields; and preparing, developing and improving sites. | ||||||||
OAKLAND COUNTY | Avondale School District | 08/03/2010 | 1 | French | Passed | 2,999/2,326 | $27,810,000 | |
Constructing additions at and remodeling existing school district buildings, including energy conservation and other infrastructure improvements; acquiring and installing technology infrastructure, improvements and equipment in all school district buildings; equipping, furnishing, and reequipping and refurnishing school district buildings; and improving and developing sites, including outdoor athletic facilities and structures in the school district. | ||||||||
OAKLAND COUNTY | Berkley School District | 02/23/2010 | 1 | TMP | Failed | 2,393/5,439 | $167,665,000 | |
Constructing, furnishing and equipping a new middle school; constructing, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school facilities; acquiring and installing educational technology in school buildings; acquiring land; and developing and improving playgrounds, play fields and sites. | ||||||||
OTTAWA COUNTY | Holland City School District | 05/04/2010 | 1 | GMB | Passed | 2,187/1,777 | $60,865,000 | |
Erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping school district buildings; acquiring and installing educational technology system improvements, purchasing school buses; and developing and improving playgrounds, playfields, athletic fields and facilities and sites. | ||||||||
OTTAWA COUNTY | Holland City School District | 05/04/2010 | 2 | GMB | Passed | 2,404/1,573 | $12,385,000 | |
erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping two former elementary buildings for new educational purposes, and remodeling, refurnishing and re-equipping K-7 buildings; acquiring and installing educational technology system improvements; and developing and improving sites. | ||||||||
OTTAWA COUNTY | Zeeland Public Schools | 05/04/2010 | 1 | GMB | Passed | 2,501/1,961 | $20,275,000 | |
Erecting, furnishing and equipping a new elementary school and additions to school buildings; partially remodeling, refurnishing and re-equipping school district buildings and installing educational technology system improvements; purchasing school buses; and developing and improving playgrounds, play fields and sites. | ||||||||
SAINT JOSEPH COUNT | Colon Community School District | 09/14/2010 | 1 | C2AE | Passed | 681/475 | $8,000,000 | |
Remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities, playgrounds and sites. | ||||||||
SAINT JOSEPH COUNT | Colon Community School District | 09/14/2010 | 2 | C2AE | Passed | 580/566 | $7,000,000 | |
Additional remodeling, refurnishing and re-equipping school district buildings; erecting, furnishing and equipping additions to the Middle/High School, acquiring and installing educational technology improvements and developing and improving athletic facilities and sites. | ||||||||
WASHTENAW COUNTY | Lincoln Consolidated School District | 05/04/2010 | 1 | Archit To Be Named | Passed | 1,211/959 | $35,000,000 | |
Constructing, furnishing and equipping additions to, including a performing arts center addition, and remodeling, refurnishing and re-equipping school facilities; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving athletic fields, play fields, playgrounds and sites. | ||||||||
WASHTENAW COUNTY | Saline Area Schools | 08/03/2010 | 1 | Archit To Be Named | Failed | 2,629/2,782 | $28,000,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing educational technology in school buildings; acquiring school buses; and developing and improving playgrounds and sites. | ||||||||
WAYNE COUNTY | Huron School District | 05/04/2010 | 1 | French | Failed | 782/961 | $9,820,000 | |
Improving, remodeling, equipping, furnishing, reequipping and refurnishing existing district school buildings, constructing an addition to Miller Elementary School, and improving all existing sites, including construction and renovation of parking areas and athletic facilities thereon, and acquiring and installing technology equipment and infrastructure, security systems and equipment at all existing sites, and acquiring school buses. | ||||||||