STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
County | School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
ALGER COUNTY | Superior Central Schools | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 334/136 | $1,420,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping the Superior Central School District K-12 building, in part for security, communication and technology systems; acquiring, installing and equipping instructional technology for the school building; and purchasing school buses. | ||||||||
ANTRIM COUNTY | Ellsworth Community School | 11/03/2015 | 1 | Kingscott | Passed | 164/127 | $3,000,000 | |
Erecting additions to, partially remodeling, installing security measures for, furnishing and re-furnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and developing and improving parking areas and sites. | ||||||||
BARRY COUNTY | Hastings Area School District | 11/03/2015 | 1 | Kingscott | Passed | 2,161/1,954 | $44,590,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping, and re-equipping school buildings for instructional technology; and preparing, developing and improving sites. | ||||||||
BARRY COUNTY | Hastings Area School District | 05/05/2015 | 1 | Kingscott | Failed | 2,477/2,585 | $55,000,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and re-furnishing and equipping and re-equipping all school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; erecting, furnishing and equipping a new transportation facility; and preparing, developing, equipping, and improving playgrounds, athletic facilities and sites. | ||||||||
BAY COUNTY | Essexville-Hampton Public Schools | 02/24/2015 | 1 | K L Design Group LLC | Passed | 1,367/782 | $4,970,000 | |
Erecting, furnishing and equipping a cafeteria/multi-purpose room addition to Verellen Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping, other school buildings and facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, and improving sites. | ||||||||
BERRIEN COUNTY | Niles Community School District | 05/05/2015 | 1 | TMP | Passed | 1,948/1,873 | $29,770,000 | |
Partially remodeling school facilities; acquiring, installing and equipping district-wide communication, security, and instructional technology systems for school facilities; erecting, furnishing and equipping additions to Howard Elementary School and Ring Lardner Middle School; and developing and improving sites. | ||||||||
BERRIEN COUNTY | Niles Community School District | 05/05/2015 | 2 | TMP | Passed | 1,967/1,838 | $10,300,000 | |
Partially remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities and developing and improving sites. | ||||||||
BRANCH COUNTY | Coldwater Community Schools | 05/05/2015 | 1 | Tower Pinkster | Failed | 1,365/3,508 | $46,550,000 | |
Erecting, furnishing and equipping a new upper elementary school; erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and re-furnishing and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; erecting, furnishing and equipping athletic facility buildings; and preparing, developing, improving and equipping playgrounds, athletic facilities, play fields and sites. | ||||||||
BRANCH COUNTY | Coldwater Community Schools | 05/05/2015 | 2 | Tower Pinkster | Failed | 1,156/3,732 | $10,060,000 | |
Erecting, furnishing and equipping an auditorium addition to the High School; erecting, furnishing and equipping a bus garage and a maintenance building; and preparing, developing and improving sites. | ||||||||
CASS COUNTY | Dowagiac Union School District | 11/03/2015 | 1 |
| Passed | 1,302/1,119 | $27,000,000 | |
Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; erecting, furnishing and equipping a handicap accessible toilet addition to the high school; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and acquiring, preparing, developing and improving athletic facilities and sites. | ||||||||
CASS COUNTY | Dowagiac Union School District | 11/03/2015 | 2 |
| Passed | 1,270/1,155 | $10,200,000 | |
Erecting, furnishing and equipping a gymnasium addition to the high school; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting athletic facilities; and preparing, developing and improving sites. | ||||||||
CHEBOYGAN COUNTY | Cheboygan Area Schools | 02/24/2015 | 1 | Integrated Designs | Passed | 1,059/556 | $9,400,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, and improving sites. | ||||||||
CHIPPEWA COUNTY | Rudyard Area Schools | 02/24/2015 | 1 | Integrated Designs | Failed | 306/365 | $3,820,000 | |
Partially remodeling, furnishing and refurnishing, and equipping and re-equipping the school building; purchasing school buses; acquiring, installing and equipping instructional technology and related infrastructure; remodeling, equipping and re-equipping the pool and other athletic facilities; resurfacing, developing and improving the existing running track; developing and improving athletic fields, athletic facilities and the site; and erecting, furnishing and equipping a vestibule addition to the school building. | ||||||||
EATON COUNTY | Grand Ledge Public Schools | 02/24/2015 | 1 | GMB | Failed | 3,440/3,735 | $68,325,000 | |
Acquiring, installing and equipping instructional technology for school facilities; erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping Grand Ledge Public Schools’ facilities; purchasing school buses; constructing, equipping, developing and improving athletic and physical education facilities, playgrounds and playfields; and developing and improving sites. | ||||||||
GENESEE COUNTY | Grand Blanc Community Schools | 11/03/2015 | 1 | Gazall, Lewis & Assoc. Architects, Inc. | Passed | 3,223/2,962 | $32,605,000 | |
Acquiring and installing instructional technology in school buildings and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, in part for technology infrastructure, security, and safety improvements. | ||||||||
HILLSDALE COUNTY | Pittsford Area Schools | 08/04/2015 | 1 | Dailey Engineering Inc. | Failed | 180/322 | $6,460,000 | |
Remodeling and equipping the school building; and developing and improving the site. | ||||||||
HOUGHTON COUNTY | Stanton Township Public Schools | 11/03/2015 | 1 | UP Engineers & Architects | Passed | 239/189 | $3,410,000 | |
Constructing an addition to the E.B. Holman School; partially remodeling, furnishing and refurnishing, and equipping and re-equipping the E.B. Holman School; acquiring, installing and equipping the E.B. Holman School for instructional technology; and developing and improving the site. | ||||||||
INGHAM COUNTY | Stockbridge Community Schools | 11/03/2015 | 1 | Stantec | Passed | 1,183/682 | $19,870,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping Stockbridge Community Schools’ facilities, in part, for safety improvements; erecting, furnishing and equipping additions to Stockbridge High School; acquiring, installing and equipping instructional technology for school facilities; acquiring, constructing and installing lights and bleachers for the stadium; purchasing school buses; and developing and improving sites. | ||||||||
KALAMAZOO COUNTY | Galesburg-Augusta Community Schools | 11/03/2015 | 1 | Tower Pinkster | Failed | 791/923 | $14,000,000 | |
Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, and equipping or re-equipping school buildings for instructional technology; erecting, furnishing and equipping athletic structures; and preparing, developing, improving and equipping athletic facilities and fields and sites. | ||||||||
KENT COUNTY | Kenowa Hills Public Schools | 11/03/2015 | 1 | GMB | Failed | 1,818/1,843 | $55,240,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and acquiring, preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | ||||||||
KENT COUNTY | Kenowa Hills Public Schools | 05/05/2015 | 1 | GMB | Failed | 2,004/3,304 | $78,640,000 | |
Erecting, furnishing and equipping a new early childhood building; erecting, furnishing and equipping additions to school buildings; remodeling, equipping or re-equipping and furnishing or refurnishing school buildings; acquiring, installing, equipping or re-equipping school buildings for instructional technology; purchasing school buses; and acquiring, preparing, developing, improving, and equipping playgrounds, play fields, athletic facilities, and sites. | ||||||||
LEELANAU COUNTY | Suttons Bay Public Schools | 11/03/2015 | 1 | Cornerstone Architechts | Passed | 719/482 | $7,045,000 | |
Purchasing school buses; partially remodeling, installing security measures for, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and developing and improving sites. | ||||||||
LENAWEE COUNTY | Adrian City School District | 02/24/2015 | 1 |
| Failed | 1,332/1,586 | $39,000,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping additions to the Adrian Middle School (Springbrook) and the High School; acquiring, installing and equipping instructional technology for K-12 school facilities; constructing, equipping, developing and improving athletic facilities and play fields; and developing and improving sites. | ||||||||
LIVINGSTON CO | Howell Public Schools | 11/03/2015 | 1 |
| Passed | 3,325/3,045 | $12,500,000 | |
Acquiring, installing and equipping or re-equipping school buildings for instructional technology; and remodeling, equipping and re-equipping and furnishing and refurnishing school buildings. | ||||||||
LUCE COUNTY | Tahquamenon Area Schools | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Failed | 297/1,245 | $18,075,000 | |
Erecting, furnishing and equipping additions to, remodeling, furnishing and refurnishing and equipping and re-equipping a school building; acquiring and installing instructional technology and instructional technology equipment for a school building; and equipping, developing and improving a playground, driveways, parking areas and sites. | ||||||||
LUCE COUNTY | Tahquamenon Area Schools | 11/03/2015 | 2 | Integrated Designs, Inc. Scott Hoeft | Failed | 307/1,235 | $2,265,000 | |
Erecting, furnishing and equipping a new athletic building; remodeling, furnishing and refurnishing and equipping and re-equipping an existing athletic building; and equipping, developing and improving athletic fields and facilities, a playground, driveways, parking areas and sites. | ||||||||
MACOMB COUNTY | Armada Area Schools | 11/03/2015 | 1 | None | Passed | 709/623 | $4,100,000 | |
Acquiring, installing, and equipping or re-equipping school buildings for instructional technology; and remodeling, furnishing and re-furnishing and equipping and re-equipping school buildings. | ||||||||
MACOMB COUNTY | Armada Area Schools | 05/05/2015 | 1 | None | Failed | 1,063/1,403 | $4,100,000 | |
Acquiring, installing, and equipping or re-equipping school buildings for instructional technology; remodeling, furnishing and re-furnishing and equipping and re-equipping school buildings; and equipping athletic facilities. | ||||||||
MACOMB COUNTY | Lake Shore Public Schools (Macomb) | 05/05/2015 | 1 | Wakely | Failed | 2,175/3,268 | $34,955,000 | |
Acquiring, installing and equipping instructional technology for school facilities; remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, equipping, developing and improving athletic facilities; and developing and improving sites. | ||||||||
MECOSTA COUNTY | Chippewa Hills School District | 05/05/2015 | 1 | Kingscott | Passed | 1,645/1,359 | $23,500,000 | |
Erecting, furnishing and equipping a new elementary school building; erecting, furnishing and equipping additions to, installing security measures for, and remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and developing and improving a playground, athletic fields and athletic facilities, parking areas and sites. | ||||||||
MIDLAND COUNTY | Midland Public Schools | 02/24/2015 | 1 | French | Passed | 4,390/2,848 | $121,400,000 | |
Installing security measures for, remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; erecting, furnishing and equipping additions to school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and developing and improving playgrounds, play fields, athletic fields and facilities, parking and driveway areas and sites. | ||||||||
MONROE COUNTY | Dundee Community Schools | 08/04/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Failed | 405/409 | $9,145,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping Dundee Community Schools' facilities; erecting, furnishing and equipping an addition to Dundee Elementary School to expand the cafeteria; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving athletic and physical education facilities and play fields; and developing and improving sites. | ||||||||
MONTMORENCY CO. | Atlanta Community Schools | 11/03/2015 | 1 | Trinity Architecture & Management LLC | Failed | 452/555 | $5,965,000 | |
Remodeling, equipping and re-equipping and furnishing and refurnishing the school building; acquiring, installing, equipping and re-equipping the school building for instructional technology; erecting, furnishing and equipping concession and storage buildings; and developing, improving and equipping athletic fields and the site. | ||||||||
MONTMORENCY CO. | Hillman Community Schools | 02/24/2015 | 1 | Integrated Designs | Failed | 169/494 | $9,900,000 | |
Erecting, furnishing and equipping additions to the school building; partially remodeling, furnishing and refurnishing, and equipping and re-equipping the school building; acquiring, installing and equipping instructional technology and related infrastructure; and constructing, equipping, developing and improving a playground, a play field and the site. | ||||||||
MUSKEGON COUNTY | Mona Shores Public School District | 11/03/2015 | 1 | Tower Pinkster | Passed | 3,199/2,096 | $13,110,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, equipping, developing and improving playgrounds; purchasing school buses; acquiring, installing and equipping instructional technology for school facilities; and developing and improving sites. | ||||||||
MUSKEGON COUNTY | Mona Shores Public School District | 05/05/2015 | 1 | Tower Pinkster | Failed | 2,810/3,075 | $13,110,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing, equipping, developing and improving playgrounds; purchasing school buses; acquiring, installing and equipping instructional technology for school facilities; and developing and improving sites. | ||||||||
OAKLAND COUNTY | Berkley School District | 05/05/2015 | 1 | Stantec | Passed | 5,015/2,353 | $58,950,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; and developing and improve the sites. | ||||||||
OCEANA COUNTY | Hart Public School District | 05/05/2015 | 1 | Tower Pinkster | Passed | 997/992 | $15,800,000 | |
Constructing, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; and developing and improving athletic facilities and the site. | ||||||||
ONTONAGON COUNTY | Ewen-Trout Creek Consolidated School District | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 348/333 | $4,490,000 | |
Remodeling, equipping and re-equipping school buildings, in part with energy conservation improvements, and purchasing school buses. | ||||||||
OSCEOLA COUNTY | Evart Public Schools | 11/03/2015 | 1 | Kingscott | Passed | 550/523 | $8,400,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; remodeling, equipping and re-equipping the transportation building; improving, equipping and re-equipping an elementary school playground; and developing and improving sites. | ||||||||
OSCEOLA COUNTY | Marion Public Schools | 05/05/2015 | 1 | Kingscott | Failed | 353/433 | $5,200,000 | |
Acquiring, installing and equipping instructional technology for school facilities; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; constructing; equipping, developing and improving athletic facilities; purchasing and equipping school buses; and developing and improving sites. | ||||||||
OTTAWA COUNTY | Hudsonville Public School District | 08/04/2015 | 1 | GMB | Passed | 1,857/1,732 | $21,880,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and re-furnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and developing, improving and equipping playgrounds, play fields and sites. | ||||||||
SAGINAW COUNTY | Freeland Community School District | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Failed | 796/1,773 | $22,395,000 | |
Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; erecting and equipping a bus garage; purchasing school buses; and developing, improving, and equipping athletic fields, playgrounds, and sites. | ||||||||
SANILAC COUNTY | Sandusky Community School District | 02/24/2015 | 1 | Integrated Designs | Passed | 502/355 | $4,650,000 | |
Acquiring, installing and equipping instructional technology and related infrastructure; partially remodeling, furnishing and refurnishing, and equipping and re-equipping school district buildings; developing and improving the high school site; purchasing school buses; and remodeling and equipping the bus garage. | ||||||||
SHIAWASSEE COUNTY | Corunna Public School District | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 1,340/992 | $16,500,000 | |
Erecting, furnishing, and equipping additions to Elsa Meyer Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, improving, and equipping athletic fields, playgrounds, and sites. | ||||||||
SHIAWASSEE COUNTY | Corunna Public School District | 05/05/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Failed | 1,179/1,363 | $16,500,000 | |
Erecting, furnishing, and equipping additions to Elsa Meyer Elementary School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, improving, and equipping athletic fields, playgrounds, and sites. | ||||||||
SHIAWASSEE COUNTY | Durand Area Schools | 11/03/2015 | 1 | Integrated Designs, Inc. Scott Hoeft | Passed | 1,298/716 | $6,400,000 | |
Remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; acquiring, installing, and equipping or re-equipping school buildings for instructional technology; and developing and improving athletic facilities and sites. | ||||||||
SHIAWASSEE COUNTY | Owosso Public Schools | 11/03/2015 | 1 | Kingscott | Failed | 2,426/2,967 | $49,545,000 | |
Erecting, furnishing, and equipping additions to the existing high school, including, but not limited to, classrooms, offices, an auditorium, and a gymnasium, in order to convert it to a secondary building to include both a middle school and a high school; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, in part, for air conditioning and building security improvements; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, and improving sites. | ||||||||
SHIAWASSEE COUNTY | Owosso Public Schools | 02/24/2015 | 1 | Stantec | Failed | 1,900/2,738 | $54,125,000 | |
Erecting, furnishing, and equipping additions to the existing high school, including, but not limited to, classrooms, offices, an auditorium, a gymnasium, and a pool, in order to convert it to a secondary building to include both a middle school and a high school; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, in part, for air conditioning and building security improvements; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, and improving sites. | ||||||||
TUSCOLA COUNTY | Caro Community Schools | 02/24/2015 | 1 | Wigen Tincknell Meyer & Associates | Passed | 1,029/722 | $12,500,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and re-equipping, and furnishing and refurnishing school facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and developing, improving and equipping playgrounds, play fields, athletic facilities and sites. | ||||||||
VAN BUREN COUNTY | Decatur Public Schools | 08/04/2015 | 1 | Kingscott | Passed | 379/155 | $2,620,000 | |
Acquiring, installing and equipping instructional technology for the Decatur Public Schools K-12 school building; partially remodeling the school building for roofing replacement; and purchasing school buses. | ||||||||
WASHTENAW COUNTY | Saline Area Schools | 11/03/2015 | 1 | Kingscott | Passed | 3,181/1,945 | $67,500,000 | |
Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and developing, improving and equipping playgrounds, athletic fields and facilities and sites. | ||||||||
WAYNE COUNTY | Dearborn Heights School District #7 | 11/03/2015 | 1 | Secant Technologies | Passed | 711/665 | $4,595,000 | |
Acquiring and installing instructional technology and technology infrastructure and equipment in the School District, including security, network, and audio/visual upgrades; and remodeling, equipping, furnishing, re-equipping and refurnishing of existing School District buildings, all associated with the acquisition and installation of instructional technology and technology infrastructure. | ||||||||
WAYNE COUNTY | Dearborn Heights School District #7 | 02/24/2015 | 1 |
| Failed | 346/382 | $4,595,000 | |
Acquiring and installing instructional technology and technology infrastructure and equipment in the School District, including security, network, and audio/visual upgrades; and remodeling, equipping, furnishing, re-equipping and refurnishing of existing School District buildings, all associated with the acquisition and installation of instructional technology and technology infrastructure. | ||||||||
WAYNE COUNTY | Grosse Ile Township Schools | 05/05/2015 | 1 | French | Failed | 1,562/1,604 | $7,435,000 | |
Equipping, furnishing, reequipping and refurnishing School District buildings and acquiring buses;acquiring and installing technology infrastructure and equipment; and improving and developing sites, including playgrounds, structures and outdoor athletic facilities. | ||||||||
WAYNE COUNTY | Riverview Community School District | 05/05/2015 | 1 | Mielock Associates, Inc. | Failed | 1,494/1,656 | $19,900,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping additions to the high school, in part, for cafeteria, kitchen and office spaces; acquiring, installing and equipping instructional technology for school facilities; constructing and equipping a pre-school playground; and developing and improving sites. | ||||||||
WAYNE COUNTY | Riverview Community School District | 05/05/2015 | 2 | Mielock Associates, Inc. | Failed | 1,431/1,636 | $4,730,000 | |
Erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping the middle school for swimming pool improvements; remodeling, furnishing and equipping the high school pool area into a new multi-purpose use; acquiring, installing and equipping technology for the middle school swimming pool; and developing and improving sites. | ||||||||
WAYNE COUNTY | Southgate Community School District | 11/03/2015 | 1 | None | Passed | 2,848/1,261 | $20,080,000 | |
Partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving athletic facilities and playfields; and developing and improving sites. | ||||||||
WAYNE COUNTY | Woodhaven-Brownstown School District | 11/03/2015 | 1 | French | Passed | 763/500 | $57,400,000 | |
Erecting, furnishing and equipping additions to the high school; remodeling, equipping and re-equipping and furnishing and re-furnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing and equipping school buses; and developing, improving and equipping playgrounds, athletic fields and sites. | ||||||||
WAYNE COUNTY | Wyandotte City School District | 02/24/2015 | 1 | Integrated Designs | Passed | 1,482/829 | $39,270,000 | |
Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; erecting, furnishing, equipping, and improving athletic fields; and improving sites. | ||||||||