STATE QUALIFIED SCHOOL BOND ELECTION RESULTS
County | School |
Election |
Prop. |
Architect |
Result |
Vote |
Amount |
|
ALCONA COUNTY | Alcona Community Schools | 11/07/2023 | 1 | Kingscott | Failed | 662/1,137 | $20,000,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; erecting, furnishing, and equipping a multi-use educational/recreational building and a livestock learning center; acquiring and installing instructional technology; and preparing, developing, and improving parking areas, driveways, and sites. | ||||||||
ALLEGAN COUNTY | Hamilton Community Schools | 05/02/2023 | 1 | GMB | Passed | 1,614/1,541 | $41,180,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and developing and improving playgrounds, driveways, parking areas, and sites. | ||||||||
ALLEGAN COUNTY | Martin Public Schools | 11/07/2023 | 1 | Tower Pinkster | Passed | 411/277 | $17,150,000 | |
Erecting, furnishing, and equipping an addition to a school building; remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and equipping, developing, and improving playgrounds, parking areas, and sites. | ||||||||
ALLEGAN COUNTY | Wayland Union Schools | 05/02/2023 | 1 | Tower Pinkster | Passed | 2,189/1,565 | $49,700,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, including security improvements, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and equipping, developing, and improving athletic fields and facilities, parking areas and sites. | ||||||||
ANTRIM COUNTY | Central Lake Public Schools | 11/07/2023 | 1 | French | Failed | 540/740 | $26,690,000 | |
Erecting, furnishing and equipping an addition to the middle/high school building; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings and structures; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds and sites. | ||||||||
BARRY COUNTY | Hastings Area School District | 08/08/2023 | 1 | The Collaborative Inc | Passed | 2,321/1,700 | $17,470,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; and developing, improving, and equipping playgrounds and sites. | ||||||||
BAY COUNTY | Bangor Township Schools | 05/02/2023 | 1 | Integrated Designs | Passed | 1,104/936 | $33,150,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; and preparing, developing, and improving sites. | ||||||||
BERRIEN COUNTY | Buchanan Community Schools | 05/02/2023 | 1 | Wightman | Failed | 1,049/1,649 | $34,970,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting, furnishing, and equipping a storage facility; and preparing, developing, improving, and equipping athletic fields, playgrounds, and sites. | ||||||||
BERRIEN COUNTY | Coloma Community Schools | 05/02/2023 | 1 | Tower Pinkster | Failed | 751/853 | $28,250,000 | |
Remodeling, furnishing, and refurnishing and equipping and re-equipping school buildings; erecting, furnishing, and equipping additions to school buildings; acquiring and installing instructional technology; erecting, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, parking areas, and sites. | ||||||||
BERRIEN COUNTY | Eau Claire Public Schools | 05/02/2023 | 1 | Tower Pinkster | Failed | 176/432 | $16,700,000 | |
Erecting, furnishing and equipping a gymnasium addition to the elementary school building; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds and sites. | ||||||||
BERRIEN COUNTY | Lakeshore School District (Berrien) | 05/02/2023 | 1 | Kingscott | Passed | 2,261/2,173 | $19,900,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and developing and improving playgrounds, driveways, parking areas, and sites. | ||||||||
BERRIEN COUNTY | Watervliet School District | 11/07/2023 | 1 | GMB | Failed | 535/688 | $29,900,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing, and equipping an alternative education building and an athletic support building; and preparing, developing, improving, and equipping athletic fields and facilities, driveways, parking areas, and sites. | ||||||||
BERRIEN COUNTY | Watervliet School District | 05/02/2023 | 1 | GMB | Failed | 451/514 | $29,900,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing, and equipping school buildings; and preparing, developing, improving, and equipping athletic fields and facilities, driveways, parking areas, and sites. | ||||||||
CALHOUN COUNTY | Mar Lee School District | 11/07/2023 | 1 | Ignyte | Passed | 171/138 | $7,330,000 | |
Erecting, furnishing, and equipping an addition to and remodeling, furnishing and refurnishing, and equipping and re-equipping the school building; acquiring and installing instructional technology in the school building; and preparing, developing, improving, and equipping the playground and site. | ||||||||
CHIPPEWA COUNTY | Sault Ste. Marie Area Schools | 11/07/2023 | 1 | Cornerstone Architechts | Failed | 1,179/2,837 | $57,000,000 | |
Erecting, furnishing, and equipping a new elementary school building; erecting additions to, and remodeling, furnishing and refurnishing, and equipping and re-equipping the Sault Area High School and Career Center building; acquiring and installing instructional technology and instructional technology equipment for the school buildings; and preparing, developing, improving, and equipping playgrounds, a play field/area, and sites. | ||||||||
CLARE COUNTY | Clare Public Schools | 11/07/2023 | 1 | The Collaborative Inc | Failed | 740/1,332 | $49,850,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites. | ||||||||
CLARE COUNTY | Clare Public Schools | 05/02/2023 | 1 | Tower Pinkster | Failed | 751/1,062 | $66,520,000 | |
Erecting, furnishing, and equipping a new high school addition; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving playgrounds and sites. | ||||||||
CLINTON COUNTY | Pewamo-Westphalia Community Schools | 05/02/2023 | 1 |
| Passed | 905/839 | $17,600,000 | |
Erecting, furnishing, and equipping additions to school facilities; remodeling, furnishing, and refurnishing and equipping and re equipping school buildings, including HVAC upgrades; acquiring and installing instructional technology; erecting, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, sidewalks, parking areas, and sites. | ||||||||
DELTA COUNTY | Gladstone Area Schools | 11/07/2023 | 1 | Integrated Designs | Failed | 798/1,157 | $35,390,000 | |
Erecting, furnishing, and equipping additions to Echool buildings and facilities; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, sidewalks, parking areas, driveways, and sites; and purchasing school buses. | ||||||||
DICKINSON COUNTY | Breitung Township Schools | 11/07/2023 | 1 | Integrated Designs | Failed | 1,128/1,855 | $34,500,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting, furnishing, and equipping a new multipurpose community building; and developing and improving driveways, parking areas, and sites. | ||||||||
DICKINSON COUNTY | Iron Mountain Public Schools | 05/02/2023 | 1 | OHM - Orchard, Hiltz and McCliment | Failed | 206/749 | $16,930,000 | |
Erecting, furnishing and equipping an elementary school building; erecting, furnishing and equipping an early childhood center; remodeling, furnishing and refurnishing and equipping and re- equipping school buildings; acquiring, installing and equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds and sites. | ||||||||
EMMET COUNTY | Pellston Public Schools | 08/08/2023 | 1 | Integrated Designs | Failed | 434/684 | $11,750,000 | |
Erecting, furnishing, and equipping a fieldhouse facility; and preparing, developing, and improving the site. | ||||||||
GENESEE COUNTY | Bentley Community School District | 11/07/2023 | 1 | Progressive AE | Passed | 682/554 | $8,320,000 | |
Remodeling and equipping or reequipping school buildings, including structures, or other facilities, or parts of those facilities; and preparing, developing, or improving sites, or parts of sites, for school buildings, including structures, athletic fields, playgrounds, repaving parking lots, adding a drop off lane, or other facilities. | ||||||||
GENESEE COUNTY | Fenton Area Public Schools | 11/07/2023 | 1 | Kingscott | Passed | 2,522/1,535 | $122,550,000 | |
Erecting additions to, remodeling, including security improvements and air conditioning and ventilation improvements to, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting, furnishing and equipping a new multipurpose athletic building and school support buildings; and equipping, developing and improving playgrounds, athletic fields and facilities, sidewalks, driveways, parking areas and sites. | ||||||||
GENESEE COUNTY | Lake Fenton Community Schools | 05/02/2023 | 1 | Kingscott | Failed | 965/1,015 | $57,500,000 | |
Erecting, furnishing, and equipping a new early childhood center; erecting, furnishing, and equipping additions to the high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology in school buildings; and preparing, erecting, developing, improving, and equipping playgrounds, athletic fields, facilities and structures, and sites. | ||||||||
GENESEE COUNTY | Montrose Community Schools | 11/07/2023 | 1 | Integrated Designs | Passed | 661/547 | $15,900,000 | |
Erecting, furnishing, and equipping additions to the middle school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; preparing, developing, improving, erecting, and equipping athletic fields and facilities; and preparing, developing, improving, and equipping playgrounds and sites. | ||||||||
GLADWIN COUNTY | Gladwin Community Schools | 05/02/2023 | 1 | Integrated Designs | Failed | 1,132/1,788 | $55,600,000 | |
Erecting, furnishing, and equipping a new school building; remodeling an existing school building; acquiring and installing instructional technology and instructional technology equipment for a school building; and developing and improving athletic fields and facilities, driveways, parking areas, and sites. | ||||||||
GOGEBIC COUNTY | Ironwood Area Schools | 05/02/2023 | 1 | OHM - Orchard, Hiltz and McCliment | Failed | 711/1,154 | $16,100,000 | |
Erecting an early childhood addition to, remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping a school building; acquiring and installing instructional technology and instructional technology equipment for a school building; and acquiring, developing, and improving an outdoor learning area, playgrounds, athletic fields and facilities, parking lots, driveways, and sites. | ||||||||
GRAND TRAVERSE COU | Buckley Community Schools | 08/08/2023 | 1 | C2AE | Passed | 281/92 | $7,440,000 | |
Building; erecting, furnishing, and equipping a new preschool building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and preparing, developing, improving, and equipping a playground, play fields, and sites. | ||||||||
HILLSDALE COUNTY | Jonesville Community Schools | 11/07/2023 | 1 | Ignyte | Failed | 567/594 | $11,625,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting and equipping a concession/restroom/team room building and a restroom/ticket booth building; and preparing, developing, remodeling, improving, and equipping athletic fields and facilities, a playground, and sites. | ||||||||
HURON COUNTY | Bad Axe Public Schools | 11/07/2023 | 1 | French | Passed | 459/337 | $6,700,000 | |
Remodeling, furnishing, and refurnishing and equipping and re-equipping school buildings, including for secure entryways; erecting, furnishing, and equipping a greenhouse and a storage addition to the high school; and equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, sidewalks, driveways, and sites. | ||||||||
IONIA COUNTY | Lakewood Public Schools | 08/08/2023 | 1 | TMP | Failed | 1,393/1,750 | $39,000,000 | |
Remodeling, furnishing, and refurnishing and equipping and re-equipping school buildings, including for school security; acquiring a site for and erecting, furnishing, and equipping an early childhood/elementary building; erecting, furnishing, and equipping a bus garage; acquiring and installing instructional technology; equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, sidewalks, parking areas, driveways, and sites; and purchasing school buses. | ||||||||
ISABELLA COUNTY | Beal City Public Schools | 08/08/2023 | 1 | Integrated Designs | Passed | 281/182 | $11,000,000 | |
Erecting, furnishing, and equipping additions to school facilities; remodeling, furnishing, and refurnishing and equipping and re-equipping school facilities; acquiring and installing instructional technology; erecting, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, sidewalks, parking areas, driveways, and sites; and purchasing school buses. | ||||||||
JACKSON COUNTY | Michigan Center School District | 08/08/2023 | 1 | Mende Engineering Solutions | Passed | 532/449 | $6,300,000 | |
Remodeling, equipping, and re-equipping school buildings, including improving air quality; acquiring and installing instructional technology; and purchasing school buses. | ||||||||
JACKSON COUNTY | Napoleon Community Schools | 11/07/2023 | 1 | Wightman | Passed | 825/751 | $17,440,000 | |
Erecting, furnishing and equipping additions to school buildings and structures; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings and structures; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds, athletic facilities and sites. | ||||||||
JACKSON COUNTY | Northwest Community Schools | 08/08/2023 | 1 | Kingscott | Passed | 2,226/1,598 | $21,500,000 | |
Erecting, equipping, and furnishing classroom additions and a multipurpose room; remodeling, furnishing, and refurnishing and equipping and re-equipping school buildings, including for security improvements; acquiring and installing instructional technology; and preparing, developing, and improving sites. | ||||||||
KALAMAZOO COUNTY | Climax-Scotts Community Schools | 05/02/2023 | 1 | TMP | Passed | 462/404 | $16,200,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | ||||||||
KENT COUNTY | Caledonia Community Schools | 05/02/2023 | 1 | Plante & Moran PLLC (Cresa) | Passed | 3,019/2,955 | $61,000,000 | |
Erecting, furnishing and equipping an elementary school building; erecting and equipping an addition to the high school building; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting storage structures; purchasing school buses; and acquiring, erecting, preparing, developing, improving and equipping playgrounds, playfields, athletic fields, athletic facilities, and sites. | ||||||||
KENT COUNTY | Comstock Park Public Schools | 05/02/2023 | 1 | GMB | Passed | 1,129/697 | $59,460,000 | |
Erecting, remodeling, and equipping and re-equipping school buildings and additions to school buildings and other facilities; furnishing and refurnishing and equipping and re-equipping school buildings and other facilities; acquiring, installing, and equipping and reequipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving, and equipping athletic fields, play fields, and sites. | ||||||||
KENT COUNTY | East Grand Rapids Public Schools | 11/07/2023 | 1 | Pure Architecture & Development | Passed | 2,581/749 | $158,900,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting and equipping a structure supporting an addition at the high school; and acquiring, preparing, developing, improving and equipping athletic fields, playgrounds and facilities and sites. | ||||||||
LAKE COUNTY | Baldwin Community Schools | 08/08/2023 | 1 | Integrated Designs | Failed | 678/783 | $39,200,000 | |
Erecting, furnishing, and equipping additions to the junior/senior high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving, and equipping a playground and sites. | ||||||||
LENAWEE COUNTY | Blissfield Community Schools | 05/02/2023 | 1 | Tower Pinkster | Passed | 854/714 | $23,600,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and preparing, developing, and improving sites. | ||||||||
LENAWEE COUNTY | Sand Creek Community Schools | 11/07/2023 | 1 | Dailey Engineering Inc. | Failed | 273/663 | $15,100,000 | |
Erecting, furnishing, and equipping additions to the elementary school building; acquiring and installing instructional technology and instructional technology equipment for the elementary school building; and preparing, developing, and improving the site. | ||||||||
LIVINGSTON CO | Howell Public Schools | 11/07/2023 | 1 | Kingscott | Passed | 7,197/4,666 | $258,000,000 | |
Erecting, furnishing and equipping two new elementary school buildings and a new community center building; erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping playgrounds, playfields, athletic fields and facilities and sites. | ||||||||
MACKINAC COUNTY | Les Cheneaux Community Schools | 11/07/2023 | 1 | Integrated Designs | Failed | 342/483 | $12,600,000 | |
Erecting, completing, remodeling, and equipping and re-equipping school buildings and facilities; furnishing and refurnishing school buildings and facilities; purchasing school buses; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving, and equipping athletic fields, play fields, playgrounds, structures, facilities, and sites. | ||||||||
MACKINAC COUNTY | St. Ignace Area Schools | 05/02/2023 | 1 | Integrated Designs | Passed | 424/247 | $9,150,000 | |
Remodeling and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing and improving the site. | ||||||||
MACOMB COUNTY | Armada Area Schools | 05/02/2023 | 1 | French | Passed | 951/742 | $26,500,000 | |
Erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; purchasing school buses; and erecting, preparing, developing, improving and equipping structures, athletic fields and facilities and sites. | ||||||||
MACOMB COUNTY | Center Line Public Schools | 05/02/2023 | 1 | Partners in Architecture | Passed | 1,300/677 | $17,000,000 | |
Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings and other facilities and the construction of classroom additions to an existing elementary school building to create a modern learning environment for students and enhancing health, safety, security and energy conservation; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings and other facilities. | ||||||||
MACOMB COUNTY | Eastpointe Community Schools | 08/08/2023 | 1 | Partners in Architecture | Passed | 2,127/1,499 | $36,415,000 | |
Remodeling school buildings for safety by equipping and re-equipping (including equipping and re-equipping for technology) school buildings with security and safety features including the construction of secure vestibules at the Middle and High School properties. Improving sites for constructing thereon of parking lots, drives and drainage, including traffic flow renovations and pick-up and drop-off lanes. Preparing, developing and improving sites, including sites for school district buildings. Preparing, developing and improving sites and remodeling and equipping thereon of playgrounds, playfields and athletic fields and renovating the High School track and facilities. Remodeling, equipping and re-equipping (including equipping and re-equipping for technology) all school district buildings including the culinary arts facility. | ||||||||
MACOMB COUNTY | Fraser Public Schools | 05/02/2023 | 1 | Wakely | Passed | 2,249/1,394 | $59,000,000 | |
Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings and other facilities to create a modern learning environment for students and enhancing health, safety, security, and energy conservation; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings and other facilities, erecting an addition to the High School stadium building and the purchase of school buses. | ||||||||
MACOMB COUNTY | South Lake Schools | 08/08/2023 | 1 | Wakely | Passed | 1,534/1,095 | $49,750,000 | |
Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic facilities, playgrounds and other facilities and the construction of an addition to the existing high school building to create a modern learning environment for students and enhancing health, safety, security and energy conservation; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; and preparing, developing and improving sites at school buildings, athletic facilities, playgrounds and other facilities and the purchase of school buses. | ||||||||
MACOMB COUNTY | Utica Community Schools | 05/02/2023 | 1 | Integrated Design Solutions | Passed | 17,749/7,973 | $550,000,000 | |
Rebuilding and constructing additions to School District buildings creating a safe and secure modern learning environment for students; constructing replacement elementary school buildings and other facilities, remodeling School District buildings, structures and other facilities, and equipping, furnishing, reequipping and refurnishing School District buildings, athletic fields, playgrounds and other facilities; acquiring and installing technology equipment and technology infrastructure in School District buildings and other facilities, including for health, safety and security; acquiring, preparing, developing, or improving sites for School District buildings, structures, athletic fields, playgrounds, or other facilities and purchasing school buses. | ||||||||
MARQUETTE COUNTY | Gwinn Area Community Schools | 11/07/2023 | 1 | Integrated Designs | Failed | 865/1,378 | $45,550,000 | |
Erecting, furnishing, and equipping additions to the middle/high school building, including an elementary school addition and an auxiliary gym addition; remodeling, furnishing and refurnishing, and equipping and re-equipping the middle/high school building; acquiring and installing instructional technology and instructional technology equipment for the school building; partially remodeling the bus garage; and preparing, developing, improving, and equipping playgrounds and the site. | ||||||||
MASON COUNTY | Mason County Central Schools | 11/07/2023 | 1 | GMB | Failed | 879/890 | $17,930,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing, and equipping an addition to the high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping the Scottville Area Senior Center; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting and equipping a stadium restroom building; and preparing, developing, improving, remodeling, and equipping playgrounds, play fields, athletic fields and facilities, and sites. | ||||||||
MASON COUNTY | Mason County Central Schools | 11/07/2023 | 2 | GMB | Failed | 630/1,131 | $16,115,000 | |
Erecting, furnishing, and equipping a performing arts/auditorium addition and an office addition to the high school building; partially remodeling, furnishing and refurnishing, and equipping and re-equipping the high school building; acquiring and installing instructional technology and instructional technology equipment for the high school building; and preparing, developing, and improving the high school site. | ||||||||
MASON COUNTY | Mason County Central Schools | 05/02/2023 | 1 | GMB | Failed | 751/870 | $31,540,000 | |
Erecting, furnishing, and equipping additions to school facilities; remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities; acquiring and installing instructional technology and instructional technology equipment for school facilities; erecting, furnishing, and equipping a stadium restroom building; and preparing, developing, improving, remodeling, and equipping playgrounds, play fields, athletic fields and facilities, and sites. | ||||||||
MIDLAND COUNTY | Coleman Community School District | 11/07/2023 | 1 | Integrated Designs, Inc. Scott Hoeft | Failed | 748/837 | $15,360,000 | |
Erecting, furnishing and equipping an addition to the Coleman Junior/Senior High School building; remodeling, furnishing and refurnishing and equipping and re-equipping the Coleman Junior/Senior High School building; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping facilities and sites. | ||||||||
MIDLAND COUNTY | Coleman Community School District | 05/02/2023 | 1 | Integrated Designs | Failed | 634/703 | $15,360,000 | |
Erecting, furnishing and equipping an addition to the Coleman Junior/Senior High School building; remodeling, furnishing and refurnishing and equipping and re-equipping the Coleman Junior/Senior High School building; acquiring, installing and equipping or re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving and equipping facilities and sites. | ||||||||
MIDLAND COUNTY | Meridian Public Schools | 08/08/2023 | 1 | Integrated Designs | Failed | 777/991 | $17,400,000 | |
Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; and preparing, developing, improving, and equipping playgrounds and sites. | ||||||||
MONROE COUNTY | Airport Community School District | 11/07/2023 | 1 | Kingscott | Failed | 1,689/1,946 | $30,075,000 | |
Erecting, furnishing, and equipping additions to the middle school building; remodeling, furnishing and refurnishing, and equipping and re-equipping the middle school building; erecting, furnishing, and equipping a new auxiliary gymnasium building; acquiring, installing, equipping, and re-equipping the middle school building for instructional technology; and preparing, developing, improving and equipping the site. | ||||||||
MONROE COUNTY | Airport Community School District | 05/02/2023 | 1 | Kingscott | Failed | 1,656/2,312 | $64,240,000 | |
Erecting, furnishing and equipping performing arts center, gymnasium, and concessions buildings; erecting, furnishing and equipping additions to the middle school building; acquiring, installing, equipping and re-equipping the middle school building for instructional technology; and preparing, developing, improving and equipping athletic fields, athletic facilities and the site. | ||||||||
MONTCALM COUNTY | Central Montcalm Public Schools | 08/08/2023 | 1 | GMB | Failed | 734/775 | $47,500,000 | |
Erecting, furnishing, and equipping an addition to the elementary school building; erecting, furnishing, and equipping additions to the middle school/high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; purchasing school buses; erecting, furnishing, and equipping restroom and team room buildings and a press box; and preparing, developing, improving, and equipping playgrounds, athletic fields and facilities, and sites. | ||||||||
MUSKEGON COUNTY | North Muskegon Public Schools | 11/07/2023 | 1 | Tower Pinkster | Passed | 626/327 | $7,000,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping the North Muskegon School; acquiring and installing instructional technology and instructional technology equipment for the North Muskegon School; purchasing school buses; and preparing, developing, equipping, and improving the site. | ||||||||
OAKLAND COUNTY | Berkley School District | 08/08/2023 | 1 | Stantec | Passed | 4,900/2,195 | $88,000,000 | |
Erecting, furnishing and equipping a new indoor practice/robotics team building; erecting, furnishing and equipping additions to school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds, athletic fields and facilities and sites. | ||||||||
OAKLAND COUNTY | Clawson City School District | 08/08/2023 | 1 | Wakely | Passed | 1,214/898 | $25,500,000 | |
Preparing, developing and improving sites, including sites for school buildings and additions thereto; preparing, developing and improving sites of the Baker and Schalm buildings, including demolition of buildings, foundations, parking lot paving and concrete walkways as well as removal of site utilities; constructing, remodeling, equipping and re-equipping (including equipping and re-equipping for technology) the current Central Campus facility and erecting additions thereto; remodeling, equipping and re-equipping the Early Childhood Center (including equipping and re-equipping for technology). | ||||||||
OAKLAND COUNTY | West Bloomfield School District | 05/02/2023 | 1 | TMP | Passed | 2,569/1,871 | $148,000,000 | |
Erecting, furnishing, and equipping two new elementary school buildings; erecting, furnishing, and equipping additions to elementary school buildings and the high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping elementary school buildings and the high school building; acquiring and installing instructional technology in school buildings; purchasing school buses; acquiring sites; and preparing, erecting, developing, improving, and equipping playfields, playgrounds, athletic fields, facilities and structures, and sites. | ||||||||
OTTAWA COUNTY | Grand Haven Area Public Schools | 05/02/2023 | 1 | GMB | Failed | 5,039/5,514 | $155,775,000 | |
Erecting, completing, remodeling, and equipping and re-equipping, school buildings and facilities; furnishing and refurnishing school buildings and facilities; purchasing school buses; and acquiring, installing, and equipping and re-equipping school buildings for instructional technology; preparing, developing, improving and equipping structures, athletic fields, play fields, playgrounds and sites. | ||||||||
OTTAWA COUNTY | Spring Lake Public Schools | 05/02/2023 | 1 | TMP | Passed | 1,918/1,255 | $49,800,000 | |
Erecting, furnishing, and equipping additions to the high school building; erecting, furnishing, and equipping a fieldhouse building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; acquiring sites; and erecting, preparing, developing, improving, and equipping athletic fields and facilities, playgrounds, and sites. | ||||||||
PRESQUE ISLE COUNT | Onaway Area Community School District | 11/07/2023 | 1 | SitelogIQ | Failed | 570/648 | $11,625,000 | |
Partially remodeling, furnishing and refurnishing, and equipping and re-equipping the school building; and preparing, developing, and improving a playground and the site. | ||||||||
PRESQUE ISLE COUNT | Onaway Area Community School District | 11/07/2023 | 2 | SitelogIQ | Failed | 474/747 | $5,985,000 | |
Erecting, furnishing, and equipping a gymnasium and wrestling addition to the school building; and preparing, developing, and improving the site. | ||||||||
SAGINAW COUNTY | Saginaw Township Community Schools | 05/02/2023 | 1 | WTA Architects | Failed | 2,540/8,671 | $242,945,000 | |
Erecting, furnishing, and equipping additions to school buildings; remodeling, including security improvements, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting a school support building; and developing and improving outdoor learning areas, athletic fields and facilities, driveways, parking areas, and sites. | ||||||||
SAINT JOSEPH COUNT | Centreville Public Schools | 05/02/2023 | 1 | Tower Pinkster | Passed | 465/383 | $17,140,000 | |
Erecting, furnishing, and equipping additions to and remodeling, furnishing and refurnishing, and equipping and re-equipping the elementary school and the junior/senior high school; acquiring and installing instructional technology in the elementary school and the junior/senior high school; purchasing school buses; and preparing, developing, improving, and equipping the athletic stadium and sites. | ||||||||
SAINT JOSEPH COUNT | Constantine Public School District | 05/02/2023 | 1 | Tower Pinkster | Failed | 355/463 | $3,900,000 | |
Remodeling school buildings. | ||||||||
SHIAWASSEE COUNTY | Morrice Area Schools | 08/08/2023 | 1 | Integrated Designs | Passed | 308/258 | $7,010,000 | |
Remodeling, furnishing and refurnishing, and equipping and re equipping school buildings; acquiring and installing instructional technology in school buildings; and preparing, developing, improving, and equipping playgrounds, athletic fields and facilities, and sites. | ||||||||
VAN BUREN COUNTY | Bangor Public Schools (Van Buren) | 05/02/2023 | 1 | GMB | Passed | 371/332 | $7,250,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; and equipping, preparing, developing, and improving playgrounds, parking areas, and sites. | ||||||||
VAN BUREN COUNTY | Decatur Public Schools | 11/07/2023 | 1 | Kingscott | Passed | 385/331 | $8,300,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping the school building; acquiring and installing instructional technology and instructional technology equipment for the school building; erecting, furnishing, and equipping a football team room/restroom/storage building and a softball restroom/storage building; erecting and equipping a greenhouse structure; purchasing school buses; and preparing, developing, improving, and equipping athletic fields and facilities, and the site. | ||||||||
VAN BUREN COUNTY | Gobles Public School District | 11/07/2023 | 1 | Tower Pinkster | Passed | 655/400 | $27,770,000 | |
Erecting, furnishing, and equipping additions to the Middle/High School building; remodeling school buildings, including remodeling a portion of the elementary school building for early childhood classroom purposes; furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and preparing, developing, and improving the site. | ||||||||
VAN BUREN COUNTY | Hartford Public School District | 11/07/2023 | 1 | Kingscott | Passed | 409/355 | $22,600,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring and installing instructional technology in school buildings; and preparing, developing, and improving sites. | ||||||||
WASHTENAW COUNTY | Manchester Community Schools | 11/07/2023 | 1 | GMB | Passed | 1,064/997 | $64,820,000 | |
Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; erecting, furnishing, and equipping a new auxiliary/community gymnasium with student club space in the junior and senior high school; acquiring and installing instructional technology; equipping, preparing, developing, and improving athletic facilities, playgrounds, sidewalks, parking areas, and sites. | ||||||||
WAYNE COUNTY | Gibraltar School District | 11/07/2023 | 1 | French | Passed | 2,402/1,460 | $81,500,000 | |
Remodeling, equipping, furnishing, reequipping and refurnishing school buildings and other facilities to create a modern learning environment for students and for health, safety, security, energy conservation and other purposes; erecting, completing, equipping and furnishing classroom and other additions to school buildings and athletic field buildings; acquiring and installing technology infrastructure and equipment in school buildings; and preparing, developing and improving sites at school buildings and other facilities. | ||||||||
WAYNE COUNTY | Westwood Community Schools | 11/07/2023 | 1 |
| Passed | 906/651 | $24,500,000 | |
Erecting an addition to, remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; and equipping, developing and improving athletic fields and facilities, driveways and sites. | ||||||||
WEXFORD COUNTY | Manton Consolidated Schools | 11/07/2023 | 1 | SitelogIQ | Passed | 532/407 | $7,400,000 | |
Erecting, furnishing, and equipping an addition to the school building; remodeling, furnishing, and refurnishing and equipping and re-equipping the school building; and equipping, preparing, developing, and improving athletic fields and facilities, parking areas, and sites. | ||||||||