STATE QUALIFIED SCHOOL BOND ELECTION RESULTS

County

School
District

Election
Date

Prop.
No.

Architect

Result

Vote
Y/N

Amount

ALLEGAN COUNTY

Fennville Public Schools

08/05/2025

1

SitelogIQ 

Passed 

660/489

$22,350,000

Remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings and facilities; erecting and equipping structures for outdoor education programs; and preparing, developing, improving, and equipping playgrounds and sites.
 

ALLEGAN COUNTY

Otsego Public Schools

05/06/2025

1

TMP 

Failed 

1,276/1,815

$46,500,000

Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; and equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, and sites.
 

ANTRIM COUNTY

Central Lake Public Schools

05/06/2025

1

French 

Passed 

677/635

$15,395,000

Remodeling, and equipping and re-equipping school buildings, structures and facilities, including school security improvements; erecting a secure vestibule addition to Central Lake Middle/High School; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping playgrounds, structures, facilities and sites.
 

ARENAC COUNTY

Au Gres-Sims School District

08/05/2025

1

The Collaborative Inc 

Failed 

246/1,489

$11,995,000

Erecting, furnishing, and equipping a community center facility; partially remodeling, equipping, and re-equipping the K-12 school building; acquiring and installing instructional technology and instructional technology equipment for the community center facility and the K-12 school building; resurfacing and improving the running track; erecting and installing new stadium bleachers; and preparing, developing, and improving sites.
 

BERRIEN COUNTY

Eau Claire Public Schools

11/04/2025

1

Tower Pinkster 

Failed 

241/392

$8,315,000

Remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing, improving, and equipping playgrounds.
 

BERRIEN COUNTY

Watervliet School District

05/06/2025

1

GMB 

Passed 

446/420

$13,500,000

Erecting, furnishing, and equipping a school building and additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring, installing, equipping, and re-equipping school buildings for instructional technology; and preparing, developing, and improving driveways, parking areas, and sites.
 

BRANCH COUNTY

Bronson Community School District

11/04/2025

1

Tower Pinkster 

Passed 

900/847

$29,910,000

Erecting an addition to Anderson Elementary; remodeling Anderson Elementary; equipping, re-equipping, furnishing and refurnishing Anderson Elementary; acquiring, installing, equipping and re-equipping Anderson Elementary for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites.
 

BRANCH COUNTY

Bronson Community School District

05/06/2025

1

Tower Pinkster 

Failed 

634/676

$32,330,000

Erecting, remodeling, and equipping and re-equipping Anderson Elementary, and additions to Anderson Elementary; furnishing and refurnishing Anderson Elementary; acquiring, installing, equipping and re-equipping Anderson Elementary for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites.
 

CALHOUN COUNTY

Battle Creek Public Schools

05/06/2025

1

TMP 

Passed 

1,233/965

$27,500,000

Remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; and equipping, developing, and improving playgrounds, athletic facilities, and sites.
 

CLINTON COUNTY

Bath Community Schools

08/05/2025

1

THA 

Passed 

937/506

$26,800,000

Remodeling, including security and STEM equipment for, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting an athletic support building and a transportation building; purchasing school buses; and equipping, preparing, developing, and improving playgrounds, athletic fields and facilities, parking areas, and sites.
 

CLINTON COUNTY

St. Johns Public Schools

05/06/2025

1

GMB 

Failed 

2,305/3,834

$99,750,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; erecting, furnishing, and equipping additions to school buildings; erecting, furnishing, and equipping new school facilities; acquiring and installing instructional technology; equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, and sites; and purchasing school buses.
 

GENESEE COUNTY

Atherton Community Schools

11/04/2025

1

French 

Passed 

465/426

$13,400,000

Remodeling and equipping or reequipping school buildings and the restroom addition; furnishing or refurnishing remodeled school buildings; erecting an addition to the stadium area restrooms; preparing, developing, or improving sites for school buildings, including the stadium area restroom addition, football field, track and field, and other athletic facilities.
 

GENESEE COUNTY

Goodrich Area Schools

11/04/2025

1

Integrated Design Solutions 

Passed 

1,535/1,317

$64,000,000

Erecting, furnishing, and equipping additions to Goodrich High School; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and preparing, developing, improving, erecting, and equipping athletic fields and facilities, structures, playgrounds, and sites.
 

GRAND TRAVERSE COU

Kingsley Area Schools

05/06/2025

1

Environment Architects 

Failed 

573/1,853

$39,200,000

Erecting new additions to and remodeling, equipping and re-equipping and furnishing and refurnishing the middle/high school building; remodeling school buildings; acquiring, installing, equipping and re-equipping the middle/high school building for instructional technology; and preparing, developing and improving the middle/high school site.
 

GRATIOT COUNTY

Alma Public Schools

05/06/2025

1

Integrated Designs, Inc. 

Passed 

1,002/826

$29,945,000

Erecting additions to, remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting school support buildings; acquiring and installing instructional technology and instructional technology equipment of school buildings; and equipping, developing and improving playgrounds and play fields, athletic bleachers and a press box, parking areas, driveways, and sites.
 

HOUGHTON COUNTY

Hancock Public Schools

11/04/2025

1

OHM - Orchard, Hiltz and McCliment 

Passed 

651/454

$13,000,000

Remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting a school support building; and developing and improving athletic fields and facilities and a site.
 

HOUGHTON COUNTY

Lake Linden-Hubbell Public Schools

05/06/2025

1

Integrated Designs, Inc. 

Passed 

556/257

$6,500,000

Remodeling of, including school security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; erecting a school storage building; purchasing school buses; and preparing, developing and improving an athletic field, parking areas and sites.
 

IONIA COUNTY

Ionia Public Schools

11/04/2025

1

GMB 

Passed 

1,602/1,551

$84,500,000

Remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing, and equipping additions to school buildings, including a performing arts center; acquiring and installing instructional technology and instructional technology equipment for school buildings; and equipping, developing, and improving playgrounds, driveways, and sites.
 

IONIA COUNTY

Lakewood Public Schools

05/06/2025

1

Wightman 

Failed 

1,439/1,899

$29,950,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; erecting, equipping, preparing, developing, and improving athletic facilities, a support structure, playgrounds, and sites.
 

IONIA COUNTY

Portland Public School District

11/04/2025

1

Kingscott 

Passed 

1,377/1,035

$2,660,000

Remodeling, equipping and re-equipping, and furnishing and refurnishing Oakwood Elementary School and the High School.
 

JACKSON COUNTY

East Jackson Community Schools

05/06/2025

1

Diekema Hamann Architecture 

Passed 

552/492

$12,340,000

Remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and equipping, developing, and improving athletic facilities, driveways, parking areas, and sites.
 

JACKSON COUNTY

Jackson Public Schools

11/04/2025

1

TMP 

Passed 

1,465/1,077

$126,000,000

Erecting, furnishing and equipping additions to school buildings; remodeling, equipping and reequipping, furnishing and refurnishing school buildings and facilities; acquiring and installing technology and instructional technology equipment for school buildings; and equipping, developing and improving playgrounds, athletic fields and facilities and other facilities, parking areas and sites.
 

JACKSON COUNTY

Springport Public Schools

05/06/2025

1

Tower Pinkster 

Passed 

518/436

$32,700,000

Erecting, furnishing, and equipping additions to school buildings and a transportation facility; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; and erecting, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, and sites.
 

JACKSON COUNTY

Vandercook Lake Public Schools

11/04/2025

1

French 

Failed 

398/499

$19,995,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including roof replacements, plumbing and HVAC improvements, and school security improvements; acquiring and installing instructional technology; and equipping, preparing, developing, and improving playgrounds, athletic fields and facilities, and sites.
 

KALAMAZOO COUNTY

Comstock Public Schools

11/04/2025

1

GMB 

Failed 

1,238/1,356

$31,800,000

Erecting and remodeling school buildings, facilities and additions to school buildings and facilities; equipping, re-equipping, furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites.
 

KALAMAZOO COUNTY

Galesburg-Augusta Community Schools

11/04/2025

1

Tower Pinkster 

Failed 

731/836

$11,200,000

Remodeling school buildings and facilities; equipping, re-equipping, furnishing and refurnishing school buildings and facilities; erecting a new transportation facility; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping structures, facilities and sites.
 

KALAMAZOO COUNTY

Parchment School District

11/04/2025

1

Tower Pinkster 

Failed 

962/1,040

$32,350,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, including creating secure entrances at the elementary schools; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, and improving sites.
 

KALAMAZOO COUNTY

Parchment School District

05/06/2025

1

Tower Pinkster 

Failed 

705/797

$36,400,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security improvements; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing and improving sites.
 

KENT COUNTY

Byron Center Public Schools

11/04/2025

1

Tower Pinkster 

Passed 

4,381/3,339

$110,000,000

Erecting, furnishing, and equipping additions to school facilities; partially remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities; acquiring and installing instructional technology and instructional technology equipment for school facilities; erecting, furnishing, and equipping a bus garage facility; purchasing school buses; acquiring sites; erecting, preparing, developing, improving, furnishing, and equipping athletic facilities and fields; and preparing, developing, and improving a playground and sites.
 

LENAWEE COUNTY

Morenci Area Schools

05/06/2025

1

Kingscott 

Passed 

259/121

$17,400,000

Remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities, including for school security improvements; acquiring, installing, equipping and re-equipping school buildings for instructional technology; purchasing school buses; and developing, improving, and equipping playgrounds, athletic fields, and sites.
 

MACOMB COUNTY

Armada Area Schools

08/05/2025

1

French 

Failed 

650/806

$12,155,000

Remodeling, equipping and re-equipping and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and developing, improving and equipping sites.
 

MACOMB COUNTY

Fitzgerald Public Schools

08/05/2025

1

Partners in Architecture 

Passed 

676/499

$42,455,000

Remodeling, furnishing and re-furnishing, equipping and re-equipping school buildings and other facilities; acquiring and installing technology equipment and technology infrastructure in school buildings and other facilities; erecting, equipping and furnishing an addition to a school building; and improving, developing and equipping and re-equipping sites and structures in the School District, including playgrounds, playfields and athletic fields and constructing thereon an outdoor learning area.
 

MACOMB COUNTY

Lakeview Public Schools (Macomb)

11/04/2025

1

Partners in Architecture 

Passed 

2,865/2,225

$44,105,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings and other facilities; acquiring and installing instructional technology infrastructure and equipment in school buildings and other facilities; and preparing, developing and improving sites at school buildings and other facilities.
 

MACOMB COUNTY

Mt. Clemens Community School District

05/06/2025

1

Partners in Architecture 

Failed 

912/1,843

$91,820,000

Erecting additions to the secondary complex; remodeling, equipping and reequipping school buildings, including structures and athletic fields, or parts of or additions to those facilities, including renovations to restore and revitalize the historical high school building and to create separate high school and junior high school learning environments with secure entrance vestibules; furnishing or refurnishing new or remodeled school buildings; preparing, developing, and improving sites, or parts of sites, for school buildings, including structures, athletic fields, and parking lots; and acquiring, installing, and equipping or reequipping school buildings for technology.
 

MACOMB COUNTY

Richmond Community Schools

11/04/2025

1

French 

Failed 

798/1,042

$51,800,000

Erecting, furnishing, and equipping additions to school buildings; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving, and equipping playgrounds and sites.
 

MACOMB COUNTY

Romeo Community Schools

11/04/2025

1

French 

Passed 

4,336/2,958

$62,000,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic fields, playgrounds and other facilities; erecting and completing additions to school buildings; acquiring and installing instructional technology infrastructure and equipment in school buildings and other facilities; and preparing, developing and improving sites at school buildings, athletic fields, playgrounds and other facilities and the purchase of school buses.
 

MARQUETTE COUNTY

Gwinn Area Community Schools

11/04/2025

1

Integrated Designs, Inc. 

Failed 

1,147/1,649

$48,065,000

Erecting, furnishing, and equipping an elementary school addition to the middle/high school building; partially remodeling, furnishing and refurnishing, and equipping and re-equipping the building; acquiring and installing instructional technology and instructional technology equipment; and preparing, developing, equipping, and improving playgrounds and the site.
 

MARQUETTE COUNTY

Gwinn Area Community Schools

05/06/2025

1

Integrated Designs, Inc. 

Failed 

960/1,353

$30,925,000

Erecting, furnishing, and equipping additions to the middle/high school building, including a secure entrance addition; partially remodeling, furnishing and refurnishing, and equipping and re-equipping the middle/high school building; erecting a press box structure; and preparing, developing, and improving the site.
 

MIDLAND COUNTY

Midland Public Schools

05/06/2025

1

French 

Failed 

5,157/10,940

$285,000,000

Erecting, furnishing, and equipping new school buildings and school support buildings; erecting additions to, remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and acquiring, preparing, developing, equipping, and improving playgrounds, play fields, athletic fields and facilities, driveways, parking areas, and sites.
 

MONROE COUNTY

Mason Consolidated Schools (Monroe)

05/06/2025

1

C2AE 

Failed 

677/1,122

$16,000,000

Remodeling, including safety and security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and developing and improving sites.
 

MONROE COUNTY

Whiteford Agricultural School District

05/06/2025

1

The Collaborative Inc 

Failed 

395/757

$6,500,000

Erecting additions to, remodeling, furnishing and refurnishing, and equipping and re-equipping Whiteford Elementary School; acquiring, installing, equipping, and re-equipping Whiteford Elementary School for instructional technology; and preparing, developing, and improving sites.
 

MONROE COUNTY

Whiteford Agricultural School District

05/06/2025

2

The Collaborative Inc 

 

0/0

$1,000,000

Eerecting athletic support buildings and structures; and preparing, developing, and improving athletic fields and facilities, structures, and sites.
 

NEWAYGO COUNTY

Hesperia Community Schools

11/04/2025

1

Kingscott 

Passed 

1,813/155

$11,700,000

Erecting, equipping, and furnishing a secure entry addition to the high school; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings and the bus garage; acquiring, installing, equipping and re-equipping school buildings for instructional technology; erecting, equipping, and furnishing athletic support buildings and structures; and preparing, developing, improving, and equipping athletic fields and facilities, and sites.
 

NEWAYGO COUNTY

White Cloud Public Schools

05/06/2025

1

Pure Architecture & Development 

Failed 

739/789

$28,400,000

Erecting, completing, remodeling, and equipping and re-equipping school buildings and facilities, and additions to school buildings and facilities; furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, playgrounds, structures, facilities and sites.
 

OAKLAND COUNTY

Brandon School District

11/04/2025

1

Wakely 

Failed 

1,541/1,781

$39,500,000

Remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; purchasing school buses; and developing and improving athletic fields and facilities and sites.
 

OAKLAND COUNTY

Ferndale Public Schools

05/06/2025

1

GMB 

Passed 

3,666/1,563

$114,800,000

Erecting additions to the Ferndale Middle/High School building and remodeling, equipping and reequipping, furnishing and refurnishing the school building, additions, and athletic fields, including for classrooms and modernizing instructional and fine arts spaces; preparing, developing and improving sites for the Ferndale Middle/High School building and athletic fields and acquiring and installing technology equipment and technology infrastructure in the school building.
 

OAKLAND COUNTY

Lake Orion Community Schools

11/04/2025

1

GMB 

Failed 

4,982/5,047

$272,000,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, athletic fields, playgrounds and other facilities; erecting and completing additions to school buildings and other facilities; acquiring and installing instructional technology infrastructure and equipment in school buildings and other facilities; and preparing, developing and improving sites including school buildings, athletic fields, playgrounds, structures and other facilities and the purchase of school buses.
 

OAKLAND COUNTY

Lamphere Public Schools

11/04/2025

1

Partners in Architecture 

Failed 

1,675/1,812

$47,400,000

Remodeling, equipping and re-equipping school buildings and other facilities; and preparing, developing and improving sites at school buildings, and other facilities.
 

OAKLAND COUNTY

Lamphere Public Schools

05/06/2025

1

Partners in Architecture 

Failed 

1,066/1,449

$85,000,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings, playgrounds, athletic fields and other facilities; erecting and completing secure entryway additions at school buildings, a gymnasium addition at the high school and additions to other facilities; acquiring and installing instructional technology infrastructure and equipment for the robotics program at the middle school building; and preparing, developing and improving sites at school buildings, playgrounds, athletic fields and other facilities.
 

OSCEOLA COUNTY

Reed City Area Public Schools

11/04/2025

1

Tower Pinkster 

Failed 

400/1,310

$75,500,000

Erecting an addition to Reed City Middle and High School; remodeling, equipping, re-equipping, furnishing and refurnishing school buildings and facilities; acquiring, installing, equipping and re-equipping instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, structures, facilities and sites.
 

OSCEOLA COUNTY

Reed City Area Public Schools

05/06/2025

1

Tower Pinkster 

Failed 

804/1,960

$88,100,000

Erecting an addition to Reed City Middle and High School; remodeling, equipping, re-equipping, furnishing and refurnishing school buildings and facilities; purchasing school buses; acquiring, installing, equipping and re-equipping instructional technology; and preparing, developing, improving and equipping athletic fields, play fields, structures, facilities and sites.
 

OTTAWA COUNTY

Allendale Public School District

05/06/2025

1

TMP 

Failed 

1,661/2,392

$88,135,000

Erecting additions to, including security improvements for, remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting, furnishing, and equipping a multi-purpose field house, a robotics/STEM building, and school and athletic support buildings; acquiring and installing instructional technology and instructional technology equipment for school buildings; and equipping, preparing, developing and improving playgrounds, play fields, athletic fields and facilities, sidewalks, driveways, parking areas, and sites.
 

ROSCOMMON COUNTY

Roscommon Area Public Schools

05/06/2025

1

Kingscott 

Failed 

1,059/1,341

$12,800,000

Erecting, furnishing, and equipping additions to school buildings; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; and equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, and sites.
 

SAGINAW COUNTY

Saginaw Township Community Schools

11/04/2025

1

WTA Architects 

Failed 

4,735/7,691

$169,210,000

Erecting additions to, remodeling, including security improvements to, furnishing and refurnishing, and equipping and re-equipping school buildings; erecting a school support building; acquiring and installing instructional technology and instructional technology equipment for school buildings; and developing and improving athletic fields and facilities, driveways, parking areas, and sites.
 

SAINT CLAIR COUNTY

Marysville Public Schools

08/05/2025

1

French 

Passed 

1,391/1,228

$18,500,000

Remodeling, equipping, furnishing, reequipping and refurnishing school buildings; and preparing, developing and improving sites at school buildings, athletic fields and playgrounds.
 

SAINT JOSEPH COUNT

Colon Community School District

08/05/2025

1

InForm Architecture 

Failed 

334/380

$14,000,000

Acquiring, installing, equipping and re-equipping school buildings for instructional technology; remodeling, equipping and re-equipping, and furnishing and refurnishing school buildings and facilities; erecting, furnishing, and equipping a new gymnasium; and preparing, developing, improving, and equipping playgrounds and sites.
 

SHIAWASSEE COUNTY

Owosso Public Schools

11/04/2025

1

SHW Group, LLP 

Failed 

2,292/2,879

$35,000,000

Erecting an addition to, and partially remodeling, furnishing and refurnishing, and equipping and re-equipping the Bentley Bright Beginnings building; partially remodeling, furnishing and refurnishing, and equipping and re-equipping Emerson Elementary School, including a partial roof replacement, boiler replacement, and acquiring classroom furniture; partially remodeling, furnishing and refurnishing, and equipping and re-equipping Bryant Elementary School, including creating a secure entrance, a partial roof replacement, boiler replacement, remodeling restrooms, and acquiring classroom furniture; partially remodeling, furnishing and refurnishing, and equipping and re-equipping Central Elementary School, including creating a secure entrance, a full roof replacement (except for that portion of the roof on the multi-purpose room addition), remodeling restrooms, replacing windows, and acquiring classroom furniture; partial roof replacement, renovation of pool-related mechanical systems and infrastructure, and building remodeling related to the roof and pool projects, at the Owosso High School/Owosso Middle School campus; partially remodeling, furnishing and refurnishing, and equipping and re-equipping Washington-Lincoln School, including creating a secure entrance, remodeling restrooms, replacing water lines, and acquiring classroom furniture; erecting, furnishing, and equipping a transportation/maintenance facility and a bus canopy structure; demolishing the Cedar Street Warehouse building and buildings on the Jerome Street Bus Facility site; and preparing, developing, and improving sites at the Bentley Bright Beginnings, Bryant, Central, Emerson, Owosso High School/Owosso Middle School, and Washington-Lincoln campuses, and the Jerome Street Bus Facility site, including paving and improving parking lots.
 

SHIAWASSEE COUNTY

Perry Public School District

05/06/2025

1

Integrated Designs, Inc. 

Failed 

727/797

$19,650,000

Erecting, furnishing, and equipping an addition to the middle and high school building; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for school security; acquiring and installing instructional technology; erecting, furnishing, equipping, preparing, developing, and improving athletic fields and facilities, playgrounds, and sites.
 

WASHTENAW COUNTY

Dexter Community School District

05/06/2025

1

TMP 

Passed 

6,922/5,362

$241,865,000

Erecting additions to school buildings and other facilities and remodeling, equipping and reequipping, furnishing and refurnishing school buildings, additions, playgrounds, athletic fields and facilities and other facilities, including for secure entryways, modernizing instructional, fine arts, theater, music, weight and fitness spaces; erecting, equipping and furnishing school facilities, athletic and other facilities, including for an indoor athletic facility and maintenance building; acquiring, preparing, developing and improving sites for school buildings, including athletic fields, playgrounds and other facilities and the purchase of school buses; acquiring and installing technology equipment and technology infrastructure, in school buildings and other facilities.
 

WAYNE COUNTY

Redford Union Schools, District No. 1

05/06/2025

1

Plante & Moran PLLC (Cresa) 

Passed 

1,037/880

$44,375,000

Remodeling and equipping or reequipping school buildings, including structures, and athletic fields, or parts of those facilities; refurnishing remodeled school buildings; preparing, developing, or improving sites, or parts of sites, for school buildings, including parking lots and athletic fields; acquiring, installing, and equipping or reequipping school buildings for technology.
 

WAYNE COUNTY

Romulus Community Schools

08/05/2025

1

Ehresman  

Failed 

1,292/1,502

$153,000,000

Remodeling, or equipping or reequipping school buildings, including structures, athletic fields, playgrounds, or other facilities, or parts of or additions to those facilities; erecting an addition to the transportation building; furnishing or refurnishing new or remodeled school buildings; preparing, developing, or improving sites, or parts of sites, for school buildings, including structures, athletic fields, playgrounds, or other facilities; purchasing school buses; acquiring, installing, or equipping or reequipping school buildings for technology.
 

WAYNE COUNTY

Southgate Community School District

05/06/2025

1

Plante & Moran PLLC (Cresa) 

Passed 

2,078/1,383

$28,000,000

Erecting, furnishing, and equipping maintenance and athletic facilities; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings, including for HVAC systems and school security; acquiring and installing instructional technology; and preparing, developing, and improving sites.
 

WAYNE COUNTY

Van Buren Public Schools

11/04/2025

1

None 

Passed 

3,944/3,898

$77,000,000

Erecting, furnishing, and equipping additions to school buildings and facilities; erecting, furnishing, and equipping school buildings and facilities; remodeling, furnishing and refurnishing, and equipping and re-equipping school buildings and facilities; acquiring sites; acquiring, installing, equipping and re-equipping school buildings for instructional technology; and preparing, erecting, developing, improving, and equipping playgrounds, playfields, athletic fields and facilities, structures, and sites.
 

WAYNE COUNTY

Wayne-Westland Community School District

11/04/2025

1

TMP 

Passed 

5,810/4,251

$125,000,000

Remodeling, equipping, re-equipping, furnishing, re-furnishing school buildings and other facilities; acquiring and installing instructional technology infrastructure and equipment in school buildings and other facilities; and preparing, developing and improving sites at school buildings and other facilities.
 

Michigan.gov Home |  Contact Treasury  |  State Web Sites  |  FAQ  |  Sitemap
Privacy Policy  |  Link Policy  |  Accessibility Policy  |  Security Policy
Copyright © 2001-2010 State of Michigan